Find or Sell Used Cars, Trucks, and SUVs in USA

1963 Chevy Nova Ss on 2040-cars

Year:1963 Mileage:33000
Location:

McKeesport, Pennsylvania, United States

McKeesport, Pennsylvania, United States
Advertising:

1963 Nova SS, 327, 202 heads, two fours fender well headers, MSD, Muncie 4 speed (Rock Crusher) Tach,electric fuel pump and water pump, roll cage, tubbed, 12 bolt 373 gears, coil overs, custom interior and paint, driven on the street, extremely fast and nice

Auto Services in Pennsylvania

Wood`s Locksmithing ★★★★★

Auto Repair & Service, Locks & Locksmiths, Keys
Address: Columbia-Cross-Roads
Phone: (607) 731-8382

Wiscount & Sons Auto Parts ★★★★★

Automobile Parts & Supplies, Auto Body Parts
Address: Lebanon
Phone: (717) 647-2629

West Deptford Auto Repair ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Auto Transmission
Address: 466 Crown Point Rd, Sharon-Hill
Phone: (856) 848-5020

Waterdam Auto Service Inc. ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Auto Oil & Lube
Address: 1041 Waterdam Plaza Dr, New-Eagle
Phone: (724) 941-9110

Wagner`s Auto Service ★★★★★

Auto Repair & Service, New Car Dealers, Used Car Dealers
Address: 514 Market St, Forty-Fort
Phone: (570) 288-2689

Used Auto Parts of Southampton ★★★★★

Automobile Parts & Supplies, Automobile Parts & Supplies-Used & Rebuilt-Wholesale & Manufacturers, Used & Rebuilt Auto Parts
Address: Wycombe
Phone: (215) 396-9109

Auto blog

2016 Chevrolet Camaro Beauty-Roll

Fri, Oct 16 2015

For those of you paying attention, we've really ramped up the old Autoblog video game these days. Our new series Car Club USA joins Translogic and The List, and there are more Daily Drivers and Short Cuts than ever. But sometimes, all you care about is the car. The Autoblog Beauty-Roll video series has one goal: bring you glossy video images of cars, and nothing but. We're collecting moving pictures of all the cars we test, inside and out. Each episode comes with a hit of engine sound – start-up and with a few revs – to round out the package. Set your resolution to max, kick it into full-screen, turn up the sound, and enjoy today's subject, the 2016 Chevrolet Camaro. Oh, and if you'd like more Beauty-Roll, click here to see the back catalog.

Corvette Stingray designer lists five goals of new exterior shape

Fri, 12 Apr 2013

Redesigning an icon is a difficult task, especially when you've got a blank sheet of paper in front of you and the all-new C7 Chevrolet Corvette Stingray is intended to be your final objective.
General Motors has released a new short video featuring Kirk Bennion of the Corvette's exterior design team, talking about the challenges of sculpting Chevrolet's new flagship sports car and the five goals the team had to keep in mind as it worked. In the end, Bennion's team had the pleasure of seeing their hard work take center stage as the Corvette captured the world's eyes at the Detroit Auto Show earlier this year.

GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.

Thu, Jul 14 2022

All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.