Find or Sell Used Cars, Trucks, and SUVs in USA

1980 El Camino on 2040-cars

US $15,000.00
Year:1980 Mileage:65000
Location:

Merritt Island, Florida, United States

Merritt Island, Florida, United States
Advertising:

Selling my 1980 rare four-speed El Camino
everything on this car is in great working conditions
this car is in amazing good condition
it drives and looks new
these are some of the latest improvements
new paint with two coats of clear coat
new steering components
new mufflers and pipes
new carpets
new velour and vinyl bucket seats
new window tinting
new shocks
350 motor with 30 some over
new tires
new re build trans.
new bead liner
built in GPS
air condition
read Oak and chrome bed.
many other new items to many to mension

Auto Services in Florida

Yokley`s Acdelco Car Care Ctr ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Automobile Electric Service
Address: 230 Hatteras Ave, Clarcona
Phone: (352) 241-0686

Wing Motors Inc ★★★★★

Used Car Dealers, Wholesale Used Car Dealers
Address: 125 NW 27th Ave, Coral-Gables
Phone: (305) 642-4455

Whitt Rentals ★★★★★

New Car Dealers, Car Rental
Address: 1807 N Nova Rd, Barberville
Phone: (386) 252-0011

Weston Towing Co ★★★★★

Auto Repair & Service, Towing, Truck Wrecking
Address: 2850 Glades Cir, Tamarac
Phone: (954) 349-4827

VIP Car Wash ★★★★★

Auto Repair & Service, Car Wash, Automobile Detailing
Address: 5910 S Military Trl, Briny-Breezes
Phone: (561) 965-6000

Vargas Tire Super Center ★★★★★

Auto Repair & Service, Automobile Parts & Supplies
Address: 2995 NW 79th St, Indian-Creek-Village
Phone: (305) 218-6503

Auto blog

GM to squeeze out more production capacity for midsize trucks

Tue, May 26 2015

General Motors was predicting a strong showing for the Chevrolet Colorado and GMC Canyon before they debuted, and demand among dealers for the midsize trucks even exceeded company's expectations. The positive situation has left GM with a problem, though: finding ways to increase capacity for the pickups at the Wentzville Assembly plant in Missiouri. With a third shift already running, GM has continued to look for ways to build just a few more of the trucks at the plant. The company has plans to hire as many as 1,000 more workers for the Saturday and Sunday shifts to construct an additional 2,000 pickups a month, according to unnamed insiders at the factory speaking to Automotive News. The little adjustments even extend to getting rid of an unpaid break to add 18 minute of assembly time over the course of a day, which equals about 3,500 more vehicles a year. All of this effort comes because the trucks are in such high demand. According to GM's figures, the company has delivered a combined 35,720 units of the Colorado and Canyon from January through April 2015, and the Chevy was the fastest-selling truck in the US for the previous three months. In May, it spent an average of just 12 days in showrooms before being snapped up. And even better for the company, 43 percent of these buyers came from other brands. According to Automotive News, the most popular trade-ins have included the Ford F-150, Toyota Tacoma, and Dodge Dakota. Related Video:

Recharge Wrap-up: GM, LG Chevy Bolt collaboration, Honda Energy Star plants

Wed, Feb 3 2016

Green Car Reports details the relationship between GM and LG in the development and production of the Chevy Bolt. The unique relationship between the two companies began in 2008, and now sees LG producing a multitude of systems for the Bolt, many of which were designed by or with GM. LG's involvement in the Bolt has gone so deep as "defining what will this vehicle be, everything from how we are going to package it, what size it should be, what kind of performance it should have," according to Pam Fletcher, GM's Executive chief engineer for electrified vehicles. Forgoing the traditional automotive relationship for a more collaborative one doesn't just save money, but it also gives GM access to LG's suite of technologies and manufacturing capabilities. Read more at Green Car Congress. The EPA has awarded three Honda factories with Energy Star certification. The automaker's assembly plants in Marysville and East Liberty, Ohio have now earned Energy Star certification ten consecutive years. The Marysville plant added LED lighting, hydrogen-powered tow motors and forklifts, high efficiency HVAC and direct-fired water boilers. The East Liberty facility added new LED lighting and replaced a large water heater with a high-efficiency one. Honda's newest US plant, Honda Manufacturing of Indiana, installed LED lighting and used energy efficient features in its recent expansion. Honda also cites a culture of energy-mindedness – for every associate – for its success. "When everyone involved considers energy efficiency and how they can help the environment, results improve," says Karen Heyob, Honda's sustainability boss in North America. Read more from Honda. The student-led Associated Students of the University of Montana (ASUM) Transportation has ordered two Proterra electric buses. The 40-foot Catalyst Fast Charge buses will serve the campus, and will recharge with a semi-autonomous fast charger. "As part of our ongoing effort to innovate service, align with student advocacy and reduce our carbon footprint, we take great pride in our decision to go electric," says ASUM Office of Transportation Director Jordan Hess. "We hope this encourages – and challenges – other universities to seriously consider the economic and environmental benefits of zero-emission buses." Read more in the press release below. First Student-led Transit Agency in the U.S.

Chevy ramps up development of Bolt EV

Thu, Jun 25 2015

The Bolt is on the move, and Chevy confirmed Wednesday it is testing more than 50 prototypes as it prepares to launch the electric vehicle in 2017. We've already seen the photographic evidence in these spy shots, but Chevy released its own images and the above video as further proof that the EV remains on track toward production. Chevy revealed the Bolt as a concept in January at the Detroit Auto Show, promising a range of 200 miles on electricity with a price tag of about $30,000 after possible incentives. The prototypes are being hand-built and tested at the General Motors Proving Grounds in Milford, MI, and other global locations. "Effectively these are the bones of the car that's going to be the production Chevy Bolt," said Josh Tavel, the car's chief engineer. Chevy is testing the Bolt in all areas of vehicle competence, including ride and handling dynamics, cabin comfort, quietness, charging capability, and energy efficiency. More than 1,000 engineers are working on the program. "We really wanted to convey the notion that this is running fast. It's happening," said Pam Fletcher, GM's executive chief engineer of electrified vehicles. The Bolt will be built at GM's Orion Assembly plant north of Detroit and sold in all 50 states. It's part of the automaker's electric car blitz that includes the plugin hybrid Volt, the traditional (non-plugin) Malibu hybrid, and confirmation of plans to expand sales of the Spark EV to Canada and Maryland. Related Video: