1966 Chevrolet Corvette on 2040-cars
Belle Mead, New Jersey, United States
Transmission:Automatic
Vehicle Title:Clean
VIN (Vehicle Identification Number): 0000000000000000
Mileage: 71001
Model: Corvette
Make: Chevrolet
Chevrolet Corvette for Sale
1972 chevrolet corvette(US $28,000.00)
1989 chevrolet corvette coupe(US $1,000.00)
1964 chevrolet corvette(US $25,000.00)
1973 chevrolet corvette(US $13,000.00)
2004 chevrolet corvette z06(US $107.50)
1977 chevrolet corvette(US $7,885.00)
Auto Services in New Jersey
Xclusive Auto Tunez ★★★★★
Volkswagen Manhattan ★★★★★
Vito`s Towing Inc ★★★★★
Vito`s Towing Inc ★★★★★
Singh Auto World ★★★★★
Reese`s Garage ★★★★★
Auto blog
GM announces $7 billion Michigan factory investment, most going to EVs
Tue, Jan 25 2022GM announced a $7 billion investment in Michigan manufacturing, much of which is earmarked for EV production. Four sites are included, but the key elements are a new battery cell plant in Lansing and the conversion of GM's existing Orion Township facility to expand production of the forthcoming Chevrolet Silverado EV and its GMC Sierra sibling. GM says it is the largest investment announcement in company history and that it will create 4,000 new jobs. It also says 1,000 jobs will be retained. "We are building on the positive consumer response and reservations for our recent EV launches and debuts, including the GMC Hummer EV, Cadillac Lyriq, Chevrolet Equinox EV and Chevrolet Silverado EV," said GM CEO Mary Barra. GM says the Orion expansion and new battery plant will support an increase in full-size electric truck production capacity to 600,000 units. This is in addition to the Factory ZERO facility in Detroit that will also be constructing the electric Silverado and Sierra. The Orion Township factory current builds the Chevrolet Bolt EV and EUV, and will continue to do so during the plant's conversion. GM did not indicate what will happen with the Bolts once that conversion is complete or whether all will continue to be built at Orion. They do not use the Ultium vehicle architecture. GM will build other EV models at three other factories that are under construction or being converted. They are located in Spring Hill, Tennessee, Ingersoll, Ontario, and Ramos Arizpe, Mexico. GM says that it will have the ability to produce 1 million electric vehicles by 2025. The Ultium Cells Lansing facility is a $2.6 billion joint investment by GM and LG Energy Solution. GM says it alone will create 1,700 jobs once fully operational by late 2024. It will join two other GM Ultium Cells battery factories currently under construction in the United States, one in Ohio and the other in Tennessee. Not all of the $7 billion investment will be for EVs. It also announced $510 million of the total will go toward upgrading the Lansing Delta Township Assembly to produce the next-generation Chevrolet Traverse and Buick Enclave. Money will also go to upgrading Lansing Grand River Assembly.
Chevy SS to get 1LE-like handling pack
Tue, Feb 17 2015Chevrolet engineers have more plans for the SS, but official approval stands between their wishes and our driving commands. After getting the no-cost option for a six-speed manual last year, Motor Trend reports that some company boffins want to throw the Camaro's track-focused 1LE package at it. On the Camaro that means the Performance Ride and Handling suspension, front and rear stabilizer bars, and 20-inch wheels all around concerning the road-focused bits. MT says that a 1LE on the SS would shed the staggered tires for one size all around, and get new dampers and a new suspension tune. It wouldn't turn the SS into a Dodge Charger SRT Hellcat, but the SS could do even more with its 415 horsepower and 415 pound-feet, hopefully without sacrificing too much of its plush road comfort in the process. It's said that a production example could be done in less than six months, but it sounds like the approval process will take longer. Featured Gallery 2014 Chevrolet SS: Review View 31 Photos News Source: Motor TrendImage Credit: Copyright 2015 AOL Chevrolet Luxury Performance Sedan chevy camaro 1le 1le
GM again delays plant that will build the Silverado EV
Tue, Jul 23 2024 General Motors Co. will again push back the planned opening of an electric pickup truck plant in suburban Detroit and has delayed a Buick plug-in amid uncertain growth in battery-powered car sales. Mary Barra, the company’s chief executive officer, told analysts Tuesday on an earnings conference call the automaker is postponing until mid-2026 the opening of its Orion Assembly factory, which will make the Chevrolet Silverado EV. This is the second delay for the plant, which was originally slated to start production in late 2024. Shares of the automaker fell 4.1% to $47.52 as of 9:39 a.m. in New York. The stock is up about 32% so far this year. The delay is a main reason why GM wonÂ’t be able to meet its previous goal of having production in place to make 1 million EVs by the end of next year. The company said they will add production as buyers show more interest in electric vehicles. “We continue to make sure we continue to scale the business to customers and where they are at,” GM Chief Financial Officer Paul Jacobson said on a call with reporters. GM reported on Tuesday a 60% jump in second quarter profit compared with a year ago, topping Wall StreetÂ’s expectations on strong demand for its traditional gas-powered trucks in the US market.








