2006 Chevrolet Colorado on 2040-cars
Greensboro, North Carolina, United States
Chevrolet Colorado for Sale
2009 chevy colorado work truck 1 owner carfax ! well maintained auto a/c cd nice(US $7,975.01)
2007 chevrolet colorado ls standard cab pickup 2-door 2.9l
2005 chevrolet colorado ls z85 / ls zq8
2010 chevrolet colorado lt extended cab pickup 4-door 3.7l(US $16,995.00)
2005 chevy colorado minor damage, ez-fix, "rebuildable salvage" no reserve.
Utility bed camper lock your tools ext cab ladder rack
Auto Services in North Carolina
Xpress Lube ★★★★★
Wrightsboro Tire & Auto ★★★★★
Wilburn Auto Body Shop - Lake Norman ★★★★★
Wheeler Troy Honda Car Service ★★★★★
Truck Alterations ★★★★★
Troy`s Auto & Machine Shop ★★★★★
Auto blog
GM announces $7 billion Michigan factory investment, most going to EVs
Tue, Jan 25 2022GM announced a $7 billion investment in Michigan manufacturing, much of which is earmarked for EV production. Four sites are included, but the key elements are a new battery cell plant in Lansing and the conversion of GM's existing Orion Township facility to expand production of the forthcoming Chevrolet Silverado EV and its GMC Sierra sibling. GM says it is the largest investment announcement in company history and that it will create 4,000 new jobs. It also says 1,000 jobs will be retained. "We are building on the positive consumer response and reservations for our recent EV launches and debuts, including the GMC Hummer EV, Cadillac Lyriq, Chevrolet Equinox EV and Chevrolet Silverado EV," said GM CEO Mary Barra. GM says the Orion expansion and new battery plant will support an increase in full-size electric truck production capacity to 600,000 units. This is in addition to the Factory ZERO facility in Detroit that will also be constructing the electric Silverado and Sierra. The Orion Township factory current builds the Chevrolet Bolt EV and EUV, and will continue to do so during the plant's conversion. GM did not indicate what will happen with the Bolts once that conversion is complete or whether all will continue to be built at Orion. They do not use the Ultium vehicle architecture. GM will build other EV models at three other factories that are under construction or being converted. They are located in Spring Hill, Tennessee, Ingersoll, Ontario, and Ramos Arizpe, Mexico. GM says that it will have the ability to produce 1 million electric vehicles by 2025. The Ultium Cells Lansing facility is a $2.6 billion joint investment by GM and LG Energy Solution. GM says it alone will create 1,700 jobs once fully operational by late 2024. It will join two other GM Ultium Cells battery factories currently under construction in the United States, one in Ohio and the other in Tennessee. Not all of the $7 billion investment will be for EVs. It also announced $510 million of the total will go toward upgrading the Lansing Delta Township Assembly to produce the next-generation Chevrolet Traverse and Buick Enclave. Money will also go to upgrading Lansing Grand River Assembly.
Callaway debuts its new C7 Stingray at National Corvette Museum
Fri, 02 May 2014Callaway showed off its first tuned version of the 2014 Corvette Stingray at the National Corvette Museum last week, giving the rampant enthusiasts of America's sports car a look at the roughly 620-horsepower, supercharged rocket.
Unlike the Corvette SC610 we showed you back in January, this Stingray packs a fair bit more oomph. Horsepower is only up ten ponies, but torque has jumped from 556 pound-feet to "at least" 600 pound-feet. Neither horsepower nor torque is official quite yet, although Callaway is expecting to know just what its creation can do once testing and validation is completed later this month.
The 6.2-liter, supercharged V8 now boasts a new, three-element intercooler, which Callaway claims only allowed the inlet air temperature to increase by ten degrees Fahrenheit during dyno runs. Previous designs saw a 35-degree-Fahrenheit jump. The exhaust system has also been fettled with, and now is even less restrictive.
GM will make Chevy Volt production announcement tomorrow
Mon, Apr 7 2014Thing are apparently happening to get the next-generation Chevy Volt ready for public consumption. The most obvious proof is in a preview of an announcement (possibly coming tomorrow) that the two main places where General Motors gets the Volt ready -the Detroit-Hamtramck Assembly Plant and the Brownstown Township battery assembly facility - will be getting big money upgrades and lots of new positions. The Hamtramck plant builds the Volt and its fancier cousin, the Cadillac ELR, as well as the global versions of the Volt. The Detroit News reports that GM will add 1,400 jobs and spend roughly $450 million at the two locations in order to build the redesigned Volt. What's less clear is exactly what the updates will bring us. We've heard that the new volt will be a 2016 model and come on a new chassis. Speculation in The Detroit News about tomorrow's announcement runs the gamut from a new compact PHEV with less electric range and a lower price (which makes sense) to an updated Volt with more electric range (heard it before) to a new all-electric vehicle (the moon shot). If there's any hints to be gleaned in the international Volts, there are also reports coming in that the Opel brand will get an all-electric vehicle that is cheaper than the Ampera. Read into that what you will. We pestered GM's Kevin Kelly on the new Volt (again) and he said (again) that he couldn't give out any more detail other than what's been reported. He just told AutoblogGreen that there will be an announcement tomorrow and that it will be about the Hamtramck and Brownstown facilities and involve the Volt. So, stay tuned.
