1969 Chevrolet Camaro True Survivor on 2040-cars
Louisville, Illinois, United States
Body Type:Coupe
Vehicle Title:Clear
Engine:307
Fuel Type:Gasoline
For Sale By:Dealer
Number of Cylinders: 8
Make: Chevrolet
Model: Camaro
Trim: Base
Power Options: Air Conditioning
Drive Type: RWD
Mileage: 89,848
Exterior Color: Green
Disability Equipped: No
Interior Color: Black
Warranty: Vehicle does NOT have an existing warranty
Chevrolet Camaro for Sale
426hp, boston sound pkg, moonroof, heated seats, paddle shifters, xm radio...
2011 chevrolet camaro 2ss rebuilt salvage title repaired damage, repairable(US $21,500.00)
2011 camaro rally sport
1969 chevrolet camaro rs/ss rallye green big block 4 speed 12 bolt
2011 chevy camaro ss convertible - lsx 376 crate motor, supercharged 650 hp!(US $39,800.00)
1967 chevrolet camaro, not 67 or 68(US $30,555.00)
Auto Services in Illinois
Z & J Auto Sales ★★★★★
Wright Automotive Inc ★★★★★
Wheatland Automotive Inc ★★★★★
Value Services ★★★★★
V & R Auto & Truck Repair ★★★★★
United Glass Co ★★★★★
Auto blog
First 2015 Chevy Corvette Z06 engine blows up at just 891 miles
Thu, Jan 1 2015You've waited and watched and waited some more for the arrival of your 650-horsepower, $78,000 Chevrolet Corvette Z06. Finally, that joyous day arrives and you eagerly, but gingerly, begin to break-in the 6.2-liter supercharged V8 monster under your hood. Then 900-odd miles after delivery, your excitement grinds, quite literally, to a halt. That's what the owner of one 2015 Z06 claimed happened to him when a simple break-in drive resulted in a lunched engine. The owner, known as Lawdogg149 on Corvette Forum, says he was out breaking-in his car ahead of a January track event when it happened. "While making a pull from 35 miles per hour, I accelerated and shifted short of redline, and boom - the car began knocking. I pulled over and popped the hood. I could hear a loud knock coming from the No. 6 cylinder area along with a serious, grinding, metal-on-metal sound coming from the supercharger area," Lawdogg wrote. A subsequent trip to the dealer confirmed his concerns, with the service facility telling Lawdogg that the No. 6 valvetrain had failed. The dealer couldn't research the issue further, though, as General Motors requested the engine be returned for a more thorough evaluation. The good news for the Z06's unlucky owner, at least, is that GM will be covering the engine replacement under warranty, an expense that Corvette Forum estimates is a nearly $24,000 procedure. At this point, the two leading theories behind the engine's detonation involve a manufacturing defect – which could be why GM is so keen to tear the blown powerplant down – or a mistake on the part of Lawdogg. As Motor Authority points out, such an error could be something as simple as the Z06's owner accidentally shifting to first rather than third during his 35-mph pull. If, however, there's a deeper manufacturing problem with the Z06's engine, this might not be the only case we end up hearing about.
2015 Chevy Silverado, GMC Sierra recalled for steering issues
Thu, Sep 13 2018DETROIT — General Motors Co is recalling more than 1 million pickup trucks and sport utility vehicles in the United States due to issues with a temporary loss of power steering, the National Highway Traffic Safety Administration said. The recall is for 2015 models. They are: the Chevy Silverado 1500, Suburban and Tahoe, GMC Sierra 1500, Yukon and Yukon XL and Cadillac Escalade. The problem may cause difficulty steering the vehicle, especially at low speeds, increasing the risk of a crash, the auto safety regulator said in a document dated Sept. 12. The document did not highlight any reports of accidents and injuries, because of the power steering issue. GM dealers will update the power steering module software, free of charge for owners of the affected vehicles. In 2014, the No.1 U.S. automaker had recalled nearly 800,000 pickup trucks worldwide because of the same problem. GM did not immediately respond to a request for comment.Related Video:
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.