Find or Sell Used Cars, Trucks, and SUVs in USA

1977 Chevy K3500 Crew Cab Dually on 2040-cars

Year:1977 Mileage:120117 Color: Black /
 Tan
Location:

Richmond, Kentucky, United States

Richmond, Kentucky, United States
Advertising:
Transmission:Automatic
Body Type:Pickup Truck
Engine:454 cu in
Vehicle Title:Clear
Fuel Type:Gasoline
For Sale By:Private Seller
Year: 1977
Make: Chevrolet
Model: C/K Pickup 3500
Cab Type (For Trucks Only): Crew Cab
Drive Type: automatic 2wd
Options: Cassette Player
Mileage: 120,117
Power Options: Air Conditioning
Exterior Color: Black
Interior Color: Tan
Number of Cylinders: 8
Trim: chrome grill
Condition: UsedA vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections.Seller Notes:"great condition, no rust clean interior, 454 with automatic, needs a/c work. new front seat. good paint. new radiator and water pump."

very clean 77 chevy 1 ton 4door dually. runs great and looks good. clean interior, new front seat just recovered. truck has been on farm most of its life. body has no rust and fresh paint. chrome wheel simulators. factory towing package with electric brakes.

Auto Services in Kentucky

Westerfield`s Countryside Transmission ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Auto Transmission
Address: 5059 Rob Roy Rd, Logansport
Phone: (270) 274-9710

Tint Masters ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Glass Coating & Tinting
Address: 102 W Wyoming Ave, Ryland-Hght
Phone: (513) 761-9111

Tennessee Frame Company ★★★★★

Automobile Body Repairing & Painting
Address: 154 Kraft St, Guthrie
Phone: (931) 906-1700

Swap-A-Lease INC ★★★★★

New Car Dealers, Automobile Leasing
Address: 11224 Cornell Park Dr, Dayton
Phone: (513) 381-0100

Steves Auto Repair ★★★★★

Auto Repair & Service, Auto Transmission, Lubricating Oils
Address: 3488 Senour Rd, Ryland-Heights
Phone: (859) 356-3000

S & S Tire ★★★★★

Auto Repair & Service, Tire Dealers
Address: 3650 Boston Rd, Salvisa
Phone: (859) 296-5917

Auto blog

UAW rejects GM contract proposal but makes a counter offer

Tue, Oct 1 2019

The United Auto Workers union said a new comprehensive offer made by General Motors Co late Monday to end a two-week-old strike was not acceptable and said it had made a new counterproposal. UAW vice president Terry Dittes said in a letter to members "there are many important issues that remain unresolved." The union is awaiting GM's next proposal. He said GM's offer came up short on many issues.  Dittes said GM made a "comprehensive proposal" at 9:40 p.m. Monday. "This proposal that the company provided to us on day 15 of the strike did not satisfy your contract demands or needs. There were many areas that came up short like health care, wages, temporary employees, skilled trades and job security to name a few." Dittes is the union's vice president for GM relations and the UAW's lead negotiator in these contract talks. "We have responded today with a counterproposal and are awaiting GM's next proposal to the union," he wrote. "Regardless of what is publicized in print or social media, etc., there are still many important issues that remain unresolved." The strike, in its third week, has cost GM more than $1 billion, according to J.P. Morgan analyst Ryan Brickman. He said the cost per day in potential profit is $82 million. However, another analysis, by East Lansing-based consultant Anderson Economic Group, put the losses at $25 million a day. And the effects of the strike are expanding. GM said Tuesday the strike has created a parts shortage that forced the automaker to halt production at its pickup and transmission plants in Silao, Mexico, temporarily laying off 6,000 workers. Silao is where GM builds its highly profitable four-door crew cab Chevy Silverado and GMC Sierra pickups. The strike has also forced GM to idle some Canadian workers, and many suppliers have been forced to halt operations. About 48,000 UAW members went on strike on Sept. 16 seeking higher pay, greater job security, a bigger share of the leading U.S. automaker’s profit and protection of their healthcare. 

GM to sink over $900M into 4 plants, mostly for a new V8

Fri, Jan 20 2023

FLINT, Mich. — General Motors says it will spend more than $900 million to update four factories, with the bulk going to an engine plant in Flint, Michigan, to build the next-generation V8 for big pickup trucks and SUVs. Factories in Rochester, New York; Defiance, Ohio; and Bay City, Michigan, also will see investments, some to make V8 engine components as well as parts for future electric vehicles, the company said Friday. The investments won't create any new jobs, but they will preserve about 2,400 hourly and salaried positions positions at the four sites, the company said. The investments “provide job security at these plants for years to come,” Gerald Johnson, GM's manufacturing chief, said in a statement. Much of the money, $579 million, will go to Flint Engine Operations for equipment to build the sixth-generation small-block V8 that will go into the next round of big pickup trucks and SUVs. The plant now employs about 700 people who also will keep making their current product, a diesel engine used in light trucks. GM, like other automakers, is facing stricter government fuel economy standards and pollution limits starting in the 2024 model year. New vehicles sold in the U.S. will have to average at least 40 miles per gallon of gasoline in 2026, up from about 28 mpg, under new Biden administration rules that undo a rollback of standards enacted under former President Donald Trump. That means the new V8 will have to get better mileage and pollute less than the current versions. Although GM wouldn't release details on the new engine, Johnson said during a news conference at the Flint plant that it would be more efficient than the current version. GM has a goal of selling only electric passenger vehicles by 2035, but Johnson said that's a dozen years out, a period when many customers will still want gas engines. “We know that has a horizon,” he said. “Between here and there, there are a lot of internal combustion customers that we don't want to lose,” he said. In addition to Flint, GM's engine components plant in Bay City, Michigan, will get $216 million to build camshafts and connecting rods, and to machine engine blocks and heads for the new V8 being built in Flint. The plant now employs about 425. The Defiance, Ohio, foundry will get $55 million to build a variety of block castings for the new V8. Included is $8 million for castings to support future electric vehicles, the company said. The plant has about 530 employees.

Chevy Bolt, GM's 200-mile EV, could debut in Detroit

Sat, Jan 10 2015

It's not news that General Motors is working on a $30,000 electric vehicle with a 200-mile range. Then-CEO Dan Akerson said as much back in 2013. What we've heard before is that this mystery EV will be based on the Chevrolet Sonic and will will arrive in 2017. So, if that's all correct, then it would make sense that confirmation of this plan would come at the 2015 Detroit Auto Show, which is just around the corner. And lookee here... The Wall Street Journal is reporting that GM will unveil a concept Chevy Bolt at the Detroit show on Monday. That name sure makes sense, too, since GM registered that trademark back in August. According to the Journal, the rumored numbers – 200-mile range, $30,000 price – are still what's expected. Some new purported details are that the battery will come from LG Chem, which also makes the Volt's batteries, and that the Bolt will be a crossover that could be sold around the world. This all smacks of a preemptive strike against the Tesla Model 3, which is also due around 2017. Currently, GM sells the Spark EV in limited areas of the US, despite a lot of excitement for wider availability. To sell a 200-mile EV for $30,000 means that GM and LG Chem will likely have drastically reduced the cost of making a big plug-in vehicle battery. What this means for the new Volt and GM's future plans is something we're more than a little excited about to learn more of on Monday, the same day that we get to see the redesigned Chevy Volt for the first time. Well, aside from the CES teaser. Green Chevrolet Crossover Electric 2015 Detroit Auto Show Chevy Bolt bolt