Find or Sell Used Cars, Trucks, and SUVs in USA

1977 Chevy Pick Up, 454 With 4 Speed. on 2040-cars

Year:1977 Mileage:94000
Location:

Parker, Colorado, United States

Parker, Colorado, United States
Advertising:

Vey powerful truck. Great work truck, or hot rod project. Runs great. Has all the power u need. This is what the called the heavy haft ton. It has 3/4 ton suspension. This is a 2 wheel drive truck not a 4x4! Has topper that goes with it, a tool box, new windshield and gasket ready to be installed. This is a great truck. Just need some tlc. Only 94,000 miles on it!!!

Auto Services in Colorado

Yoda Man Jim ★★★★★

Automobile Parts & Supplies, Automobile Parts & Supplies-Used & Rebuilt-Wholesale & Manufacturers, Automobile Accessories
Address: 4210 Jackson St, Northglenn
Phone: (720) 255-0350

Tsgauto.Com ★★★★★

Used Car Dealers
Address: 19201 E Lincoln Ave, Franktown
Phone: (720) 255-0350

Tsg Auto ★★★★★

Used Car Dealers
Address: 19555 E Parker Square Dr # 207, Franktown
Phone: (303) 805-4883

Tilden Car Care ★★★★★

Auto Repair & Service, Auto Oil & Lube, Truck Service & Repair
Address: 1112 Speer Blvd, Glendale
Phone: (303) 573-1335

South Denver Automotive ★★★★★

Auto Repair & Service, Auto Oil & Lube, Truck Service & Repair
Address: 4075 E Iliff Ave, Cherry-Hills-Village
Phone: (303) 756-0513

Royal Automotive ★★★★★

Auto Repair & Service, Used Car Dealers, Automobile Detailing
Address: 3232 s broadway, Englewood
Phone: (303) 282-1144

Auto blog

LG Chem's troubled Chevy Volt battery plant hiring once again

Thu, Sep 25 2014

The Michigan battery plant known for paying its workers to do nothing has turned things around and is now hiring more workers, specifically to do something. South Korea-based LG Chem, which runs the factory to supply the Chevrolet Volt extended-range plug-in vehicle with its lithium-ion batteries, held a job fair recently to bring on 40 new employees in order to meet higher battery demand, according to WZZM, the ABC affiliate for Grand Rapids, MI. The LG Chem factory is in Holland, MI, about 30 miles west of Grand Rapids, and it made its first batteries last year. Prior to that, though, the factory gained notoriety after a US Department of Energy (DOE) probe found that workers there were getting paid to do, well, nothing. That's because demand for the battery packs was so low that it cost less for the plant to sit idle. The DOE was conducting the probe because of its financial grant to LG Chem. But that was then and today is today. LG Chem is looking to ramp up production in advance of the second-generation Volt. That 2016 model-year version is said to have a longer all-electric range and better performance and will ride on a new chassis, but few official details have surfaced. We will know more when we get our first look at the car at the Detroit Auto Show in January.

UAW rejects GM contract proposal but makes a counter offer

Tue, Oct 1 2019

The United Auto Workers union said a new comprehensive offer made by General Motors Co late Monday to end a two-week-old strike was not acceptable and said it had made a new counterproposal. UAW vice president Terry Dittes said in a letter to members "there are many important issues that remain unresolved." The union is awaiting GM's next proposal. He said GM's offer came up short on many issues.  Dittes said GM made a "comprehensive proposal" at 9:40 p.m. Monday. "This proposal that the company provided to us on day 15 of the strike did not satisfy your contract demands or needs. There were many areas that came up short like health care, wages, temporary employees, skilled trades and job security to name a few." Dittes is the union's vice president for GM relations and the UAW's lead negotiator in these contract talks. "We have responded today with a counterproposal and are awaiting GM's next proposal to the union," he wrote. "Regardless of what is publicized in print or social media, etc., there are still many important issues that remain unresolved." The strike, in its third week, has cost GM more than $1 billion, according to J.P. Morgan analyst Ryan Brickman. He said the cost per day in potential profit is $82 million. However, another analysis, by East Lansing-based consultant Anderson Economic Group, put the losses at $25 million a day. And the effects of the strike are expanding. GM said Tuesday the strike has created a parts shortage that forced the automaker to halt production at its pickup and transmission plants in Silao, Mexico, temporarily laying off 6,000 workers. Silao is where GM builds its highly profitable four-door crew cab Chevy Silverado and GMC Sierra pickups. The strike has also forced GM to idle some Canadian workers, and many suppliers have been forced to halt operations. About 48,000 UAW members went on strike on Sept. 16 seeking higher pay, greater job security, a bigger share of the leading U.S. automaker’s profit and protection of their healthcare. 

Driving the Chevy Corvette Z06 and Porsche 911 Carrera T | Autoblog Podcast #551

Thu, Aug 23 2018

On this week's Autoblog Podcast, Editor-in-Chief Greg Migliore is joined by Green Editor John Snyder and Associate Editor Joel Stocksdale. We talk about the wide variety of the cars we've been driving, starting with the Chevrolet Corvette Z06 and Porsche 911 Carrera T. Then we discuss the more powerful 2019 Mazda MX-5 Miata, our long-term Honda Ridgeline and our week with the Hyundai Ioniq PHEV. Finally with Pebble Beach on our minds, we preview the Concours d'Elegance.Autoblog Podcast #551 Get The Podcast iTunes – Subscribe to the Autoblog Podcast in iTunes RSS – Add the Autoblog Podcast feed to your RSS aggregator MP3 – Download the MP3 directly Rundown 2019 Chevrolet Corvette Z06 2018 Porsche 911 Carrera T 2019 Mazda Miata 2018 Honda Ridgeline 2018 Hyundai Ionic Plug-In Hybrid Feedback Email – Podcast@Autoblog.com Review the show on iTunes Related Video: