2008 Chevy Trailblazer Ls Low Reserve on 2040-cars
Bettendorf, Iowa, United States
Chevrolet Trailblazer for Sale
2006 chevrolet trailblazer ls
2004 chevy trailblazer lt 4.2l navigation/reverse cam/loaded no reserve!(US $6,350.00)
2004 chevy trailblazer(US $3,500.00)
Lt suv v6 4.2l cd 4x4 tow pkg leather
2007 chevrolet trailblazer ls sport utility 4-door 4.2l(US $8,500.00)
Leather third row seats dual a/c homelink boseaudio running boards clean history
Auto Services in Iowa
Trail`s End Auto and Truck Salvage ★★★★★
Shaffer`s Auto Body Co. Inc ★★★★★
Schuling Hitch Company ★★★★★
Quality Car Care ★★★★★
Phillip`s Auto Clinic ★★★★★
Orlando`s Automotive ★★★★★
Auto blog
GM investing $439 million in Corvette plant
Fri, May 22 2015General Motors is slowly trickling out announcements about its $5.4 billion in US plant upgrades over the next three years. The latest one is something that fans of one of America's most beloved sports car will be happy about. The Bowling Green, KY, factory that assembles the Chevrolet Corvette is receiving $439 million of those funds to build a new paint shop. Covering 450,000 square-feet, the site will make painting the 'Vette more efficient and environmentally friendly. The upgrades there include robots that use paint more effectively, technology to eliminate sludge water, LED lighting to improve inspections, and less energy-intensive baking ovens. While the groundbreaking is already complete for the building, full construction is expected to begin this summer and take two years. This is the biggest upgrade for the Kentucky factory in a few years. In preparation for the latest Corvette, the Bowling Green plant received $131 million in 2011 for upgrades and to add more workers there. Related Video: Chevrolet Corvette Plant Gets $439 Million in Upgrades New, environment-friendly paint shop drives efficient production, retains 150 jobs 2015-05-21 BOWLING GREEN, Ky. – Torch Red, Shark Gray Metallic and Laguna Blue Tintcoat, three popular palate choices on the 2015 Corvette, kept the marketers who make up names working late. Now they can dream about more painstakingly precise pigments, thanks to a new paint shop that is among $439 million being invested at the only plant in the world that builds Chevrolet's iconic sports car. General Motors announced the moves today that include retaining 150 jobs and building the 450,000 square-foot paint shop that is almost half the size of the entire current production facility. The investment builds on approximately $135 million GM has invested in the plant over the last four years for the new Corvette Stingray and Performance Build Center. The announcement was followed by a groundbreaking event for the new paint shop. "The Corvette is one of Kentucky's most-cherished icons," said. Lt. Gov. Crit Luallen. "Such a significant expansion of the Bowling Green Assembly Plant will help the company remain competitive in the region and around the world." Construction of the new paint shop, which includes substantial technology upgrades, is planned to begin this summer and take approximately two years to complete. Corvette production schedules will be unaffected by the construction.
GM delays 3.0-liter Duramax diesel in Silverado and Sierra pickups
Thu, May 23 2019Stricter testing protocols around the world are making it harder for automakers to predict launch timelines. GM is the latest to get caught in emissions nettles, the Detroit carmaker forced to delay the launch of its new Duramax 3.0-liter inline-six diesel for the Chevrolet Silverado 1500 and GMC Sierra 1500. That's what company reps told dealers in a memo seen by Automotive News this week. Dealers and buyers had been promised the Flint, Mich.-built oil-burner in early 2019, but AN wrote that the EPA certification hiccup has turned into a "slight delay." A GM spokesman told Motor1, "[We] did not attribute [the delay] to a single entity, as the truth is this is a collaborative effort between GM and several government entities. We will make the 2020MY Duramax available for dealers orders soon, and expect to deliver the first trucks to customers soon after emissions testing is complete." We know the new 3.0-liter Duramax diesel has 277 horsepower and 460 pound-feet of torque, outdoing Ford's 3.0-liter PowerStroke diesel by 27 hp and 20 lb-ft. But without final EPA paperwork, GM can't release the numbers that will show how the two engines stack up when considering fuel economy and tow ratings. The certification process has been sticky for a few other makers of late, especially since the Volkswagen Group situation in 2015. BMW had to delay the launch of four diesel models in 2016 over EPA testing. The new Ram 1500 dribbled out in a trickle last year for reasons thought to deal with EPA testing, coming as it did a year after the EPA investigated Ram's EcoDiesel engines in 2017 and 2018. More recently, WLTP testing in Europe caught out just about every automaker over there. Since we're almost halfway through 2019, the delay until the 2020 model year is only a few months. Still, GM told dealers to cancel any orders for the engine for this model year. Dealers will need to resubmit the orders once opening begins, but GM hasn't said when production will begin other than "soon." The company said that it will offer 2020-model-year replacement vehicles to customers and dealers. If prices hold into the next model year, the 2020 Silverado 1500 and Sierra 1500 with the inline-six diesel will come at a $3,890 premium over the 2.7-liter turbo four-cylinder, and a $2,495 premium over the 5.3-liter V8.
Chevy Bolt will go into production in Michigan in 2016 [UPDATE]
Fri, Feb 6 2015While nothing official has been announced, it appears that General Motors may actually put the all-electric Chevy Bolt into production next year. That's the rumor that Reuters is reporting, citing two sources at suppliers for the upcoming $30,000 EV (although that $30,000 number bears some scrutiny). This rumor does fit in with earlier comments that the Bolt would arrive on the market in 2017. If it gets built, the Bolt will share more than a similar-sounding name with the Chevy Volt: the EV will be put together in metro Detroit. Reuters says the 200-mile electric car (and an Opel version) will be made in "an underused small-car plant north of Detroit," which means the Orion Township plant. GM could make between 25,000 and 30,000 Bolts a year there, if what the suppliers are saying is true. We have asked GM for a statement on this story and will update it if we hear back. UPDATE: General Motors manager of electrification technology communications, Kevin Kelly, told AutoblogGreen that, "Bolt EV Concept is just that – a concept. We're currently evaluating the vehicle program, but do not have any production announcements to make at this time."