2015 Chevrolet Tahoe Lt on 2040-cars
14963 State Hwy. 38, Marshfield, Missouri, United States
Engine:5.3L V8 16V GDI OHV
Transmission:6-Speed Automatic
VIN (Vehicle Identification Number): 1GNSKBKC8FR119075
Stock Num: 20923
Make: Chevrolet
Model: Tahoe LT
Year: 2015
Exterior Color: White
Interior Color: Jet Black
Options: Drive Type: 4WD
Number of Doors: 4 Doors
Mileage: 1
Special Financing Available: APR AS LOW AS 2.9%. 4 Wheel Drive, never get stuck again! Gas miser!!! 22 MPG Hwy!! Special Financing Available: APR AS LOW AS 2.9%. Want to feel like you've won the lottery? This Vehicle will give you just the feeling you want, but the only thing your long lost relatives will be after is a ride!!! All Around gem! Safety equipment includes: ABS, Traction control, Curtain airbags, Passenger Airbag, Daytime running lights...It has nice features like: Leather seats, Bluetooth, Power locks, Power windows, Heated seats... * Some Models maybe Priced after GM Owner loyalty(must own a 99 or newer GM Truck Vehicle to qualify) & GM trade assitance promgram(must trade a 99 or newer vehicle to qualify) Ask for more details Price is after all manufacture incentives and rebates We not only provide a great deal when it comes to price, but we also treat every customer with a great deal of respect!
Chevrolet Tahoe for Sale
2015 chevrolet tahoe lt(US $50,990.00)
2014 chevrolet tahoe ls(US $44,825.00)
2015 chevrolet tahoe lt(US $55,890.00)
2015 chevrolet tahoe lt(US $57,760.00)
2015 chevrolet tahoe lt(US $61,900.00)
2015 chevrolet tahoe ltz(US $70,375.00)
Auto Services in Missouri
Wodohodsky Auto Body ★★★★★
West County Nissan ★★★★★
Wayne`s Auto Body ★★★★★
Superior Collision Repair ★★★★★
Superior Auto Service ★★★★★
Springfield Transmission Inc ★★★★★
Auto blog
GM to invest $150 million in Flint to boost heavy-duty pickup production
Thu, Jun 13 2019FLINT, Mich. — General Motors President Mark Reuss said on Wednesday that the automaker is investing about $150 million at its Flint Assembly plant in Michigan to boost production of heavy duty trucks by another 40,000 vehicles a year. Reuss announced the investment at the Flint truck assembly plant wearing a United Auto Workers pin. The Detroit automaker had announced back in February it was adding 1,000 jobs in Flint to build a new generation of heavy-duty pickup trucks. GM did not say that the latest investment would add more jobs at the plant, but Reuss said there could be opportunities to add workers as the launch of the automaker's new trucks progresses. GM has been under pressure from President Donald Trump and lawmakers of both parties to add jobs in the United States after it said last November it would idle the Chevy Cruze assembly plant in Lordstown, Ohio, and likewise had no new products for three other U.S. manufacturing plants. The Flint investment will include upgrades to the plant's conveyors and other new tooling, and will be completed in the first half of 2020. GM has invested more than $1.6 billion in the plant since 2013. Last month, GM said it would invest $24 million to increase truck production at its assembly plant in Fort Wayne, Indiana, which makes Chevrolet Silverado and GMC Sierra models. Sales of heavy-duty pickups in the United States have grown to more than 600,000 vehicles a year, up more than 20 percent since 2013, according to industry data. Prices for luxury models can easily top $70,000. GM's Chevrolet and GMC brands have long trailed Ford's F-series heavy duty trucks in the lucrative segment. The new Chevrolet and GMC heavy duty trucks have been re-engineered to tow heavier trailers, and keep pace in what has become an arms race among the Detroit Three automakers to claim superior torque and towing capability. Related: Silverado HD vs. 2019 Ram, Ford heavy duty trucks: How they compare on paper
Chevy ramps up development of Bolt EV
Thu, Jun 25 2015The Bolt is on the move, and Chevy confirmed Wednesday it is testing more than 50 prototypes as it prepares to launch the electric vehicle in 2017. We've already seen the photographic evidence in these spy shots, but Chevy released its own images and the above video as further proof that the EV remains on track toward production. Chevy revealed the Bolt as a concept in January at the Detroit Auto Show, promising a range of 200 miles on electricity with a price tag of about $30,000 after possible incentives. The prototypes are being hand-built and tested at the General Motors Proving Grounds in Milford, MI, and other global locations. "Effectively these are the bones of the car that's going to be the production Chevy Bolt," said Josh Tavel, the car's chief engineer. Chevy is testing the Bolt in all areas of vehicle competence, including ride and handling dynamics, cabin comfort, quietness, charging capability, and energy efficiency. More than 1,000 engineers are working on the program. "We really wanted to convey the notion that this is running fast. It's happening," said Pam Fletcher, GM's executive chief engineer of electrified vehicles. The Bolt will be built at GM's Orion Assembly plant north of Detroit and sold in all 50 states. It's part of the automaker's electric car blitz that includes the plugin hybrid Volt, the traditional (non-plugin) Malibu hybrid, and confirmation of plans to expand sales of the Spark EV to Canada and Maryland. Related Video:
GM extends production cuts, affects Cadillacs, Camaro and Acadia
Thu, Apr 8 2021General Motors is extending production cuts at some of its North America factories due to a chip shortage that has roiled the global automotive industry, the U.S. carmaker said on Thursday. The move's impact has been baked into GM's prior forecast that the shortage could shave up to $2 billion off this year's profit. GM's Lansing Grand River assembly in Michigan will extend its downtime through the week of April 26. The plant makes Chevrolet Camaros and Cadillac CT4 and CT5 sedans. It has been out of action since March 15. GM's Spring Hill assembly in Tennessee will shut down for two weeks starting the week of April 12. The plant makes the Cadillac XT5, XT6 and GMC Acadia. The company said it has not taken downtime or reduced shifts at any of its more profitable full-size truck or full-size SUV plants due to the shortage. The news was first reported by CNBC. Reporting by Ankit Ajmera in Bengaluru; Editing by Maju Samuel and Sriraj Kalluvila




















