We Finance!!! 2011 Chevrolet Silverado 1500 Lt Texas Edition 20 Rims Texas Auto on 2040-cars
Webster, Texas, United States
Vehicle Title:Clear
Fuel Type:Gas
Engine:8
For Sale By:Dealer
Transmission:Automatic
Make: Chevrolet
Model: Silverado 1500
Mileage: 19,199
Disability Equipped: No
Sub Model: SILVERADO
Doors: 2
Exterior Color: White
Cab Type: Extended Cab
Interior Color: Black
Drivetrain: Rear Wheel Drive
Chevrolet Silverado 1500 for Sale
We finance!! 2010 chevrolet silverado 1500 ls extended cab tow 1 own texas auto(US $21,998.00)
Clean carfax one owner warranty dealer inspected loaded navigation
2011 chevrolet silverado lt crew cab 4x4 37k no reserve salvage rebuildable
We finance!!! 2008 chevrolet silverado 1500 ls auto onstar tow 1 own texas auto
2009 chevrolet silverado 1500 lt z71 4x4 auto power keyless 1 owner kchydodge(US $20,885.00)
Auto Services in Texas
Zeke`s Inspections Plus ★★★★★
Value Import ★★★★★
USA Car Care ★★★★★
USA Auto ★★★★★
Uresti Jesse Camper Sales ★★★★★
Universal Village Auto Inc ★★★★★
Auto blog
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.
GM announces $7 billion Michigan factory investment, most going to EVs
Tue, Jan 25 2022GM announced a $7 billion investment in Michigan manufacturing, much of which is earmarked for EV production. Four sites are included, but the key elements are a new battery cell plant in Lansing and the conversion of GM's existing Orion Township facility to expand production of the forthcoming Chevrolet Silverado EV and its GMC Sierra sibling. GM says it is the largest investment announcement in company history and that it will create 4,000 new jobs. It also says 1,000 jobs will be retained. "We are building on the positive consumer response and reservations for our recent EV launches and debuts, including the GMC Hummer EV, Cadillac Lyriq, Chevrolet Equinox EV and Chevrolet Silverado EV," said GM CEO Mary Barra. GM says the Orion expansion and new battery plant will support an increase in full-size electric truck production capacity to 600,000 units. This is in addition to the Factory ZERO facility in Detroit that will also be constructing the electric Silverado and Sierra. The Orion Township factory current builds the Chevrolet Bolt EV and EUV, and will continue to do so during the plant's conversion. GM did not indicate what will happen with the Bolts once that conversion is complete or whether all will continue to be built at Orion. They do not use the Ultium vehicle architecture. GM will build other EV models at three other factories that are under construction or being converted. They are located in Spring Hill, Tennessee, Ingersoll, Ontario, and Ramos Arizpe, Mexico. GM says that it will have the ability to produce 1 million electric vehicles by 2025. The Ultium Cells Lansing facility is a $2.6 billion joint investment by GM and LG Energy Solution. GM says it alone will create 1,700 jobs once fully operational by late 2024. It will join two other GM Ultium Cells battery factories currently under construction in the United States, one in Ohio and the other in Tennessee. Not all of the $7 billion investment will be for EVs. It also announced $510 million of the total will go toward upgrading the Lansing Delta Township Assembly to produce the next-generation Chevrolet Traverse and Buick Enclave. Money will also go to upgrading Lansing Grand River Assembly.
Chevy Colorado and GMC Canyon get trim levels reworked again
Sun, Mar 22 2020GM Authority reports that GM has fiddled with trim packages on the Chevrolet Colorado and GMC Canyon for the 2021 model year, eliminating the base trims on both pickups and implementing small price changes. When the new model year goes on sale, the Chevy will lose the rear-wheel drive Base Extended Cab with the automatic transmission that starts at $22,395 after a $1,095 destination charge. The new entry-level is going to be the Work Truck model with the extended cab in rear-wheel drive, starting at $26,595 assuming the destination charge holds steady. That represents a $4,200 jump over the base 2020 model. MSRPs for the entire Work Truck lineup, from base to the Crew Cab Long Box, rise by $400. Elsewhere in the Colorado line, the four Z71 trims go down by $100, while the two ZR2 trims increase by the same amount. Only the six LT trims don't see any change. The GMC side is a bit more involved due to previously announced changes. The 2020 Canyon comes in SL, Base Canyon, SLE, SLT, All Terrain, and Denali steps. Last month, GM Authority reported the 2021 Canyon would give all that up for the new names Elevation Standard, Elevation, AT4, and Denali. Since the SL base model retires in 2021, the Elevation Standard takes over at the entry level. Unlike on the Colorado, which sheds one trim, the Canyon lineup gets pared from 20 total combinations of trims, cab sizes, and bed lengths, to 14 total combinations. But like the Colorado, due to the loss of the cheapest configuration, the least expensive 2021 Canyon becomes $4,200 more expensive than in 2020, assuming the destination price remains the same. What's more, the 2021 Elevation Standard pricing adds $700 or $800 to the prices of the 2020 Canyon base and SLE models. There are more increases up the range. The 2021 Elevation trim replaces a combination of SLE and SLT models, bumping prices up by up to $900. In 2020, the least expensive All Terrain model is the Extended Cab Cloth for $37,695. For next year, the least expensive AT4 trim is the Crew Cab Short Box for $39,295. Like-for-like, though, the AT4 represents a $300 premium over the 2020 All Terrain Crew Cab Short Box. Three Denali trims will still stand at the top of the heap, each one going up by $400 in 2021. Until GM details the equipment changes, we won't know how the new pricing equates to value.
