4x4 Z71 Lt Chevrolet Silverado Crew Cab Leather Spray In Bedlinner 1 Owner L@@k! on 2040-cars
High Point, North Carolina, United States
Fuel Type:Gasoline
For Sale By:Dealer
Transmission:Automatic
Body Type:Pickup Truck
Make: Chevrolet
Options: Leather, Compact Disc
Model: Silverado 1500
Safety Features: Anti-Lock Brakes, Driver Side Airbag
Mileage: 145,017
Power Options: Air Conditioning, Cruise Control, Power Windows
Sub Model: LT
Exterior Color: Silver
Interior Color: Tan
Doors: 4
Number of Cylinders: 8
Cab Type: Crew Cab
Engine Description: 5.3L V8 SFI
Drivetrain: 4-Wheel Drive
Warranty: Vehicle does NOT have an existing warranty
Chevrolet Silverado 1500 for Sale
4x4 4wd leather camper shell black z71 power seat bose heated seats crew cab
2003 chevrolet silverado 1500 extended cab ls(US $7,815.00)
2011 chevrolet silverado 1500 lt mobility svm wheelchair truck(US $49,500.00)
2004 chevrolet silverado joe gidds limited edition #101(US $19,000.00)
Used chevrolet silverado 4x4 extra cab low miles automatic pickup trucks 4wd v8
Custom 2004 chevy silverado
Auto Services in North Carolina
Z-Mech Auto ★★★★★
Xtreme Detail ★★★★★
Wheels N Bumpers Car Wash ★★★★★
Weavers Body Shop & Front End ★★★★★
United Muffler Shop ★★★★★
Trotter Auto Glass Plus ★★★★★
Auto blog
GM cutting Chevy Sonic, Buick Verano production by more than 20%
Sat, Jun 13 2015General Motors' Orion Assembly plant in Michigan is seeing even more production cuts this year to further reduce inventories of the Chevrolet Sonic and Buick Verano. These latest adjustments mean layoffs for about 100 workers in phases starting in July. "GM Orion Assembly will adjust plant production capacity to better align with market demand," the company said in a statement announcing the change. Through May, sales of the Sonic are down 28.5 percent to 29,082 vehicles, and the Verano is off 15.6 percent, with 15,279 sold this year. According to unnamed plant insiders speaking to Automotive News, the assembly rate is slowing at Orion Assembly from the current 33 cars an hour down to 26 an hour, a 21-percent reduction. GM is also reportedly going to keep the plant idle for three weeks during the normal summer shutdown, rather than the usual two. Earlier in the year, the factory was idled for two weeks due to excess supply of the Sonic and Verano. In March, it was closed again for several days for the same reason. The Orion Assembly plant is the future home to the line for the Chevy Bolt EV. GM Statement: GM Orion Assembly will adjust plant production capacity to better align with market demand. A phased layoff of approximately 100 employees will begin in July 2015 and conclude by year-end. Related Video: News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Chevrolet GM Hatchback Sedan buick verano orion assembly
GM announces $7 billion Michigan factory investment, most going to EVs
Tue, Jan 25 2022GM announced a $7 billion investment in Michigan manufacturing, much of which is earmarked for EV production. Four sites are included, but the key elements are a new battery cell plant in Lansing and the conversion of GM's existing Orion Township facility to expand production of the forthcoming Chevrolet Silverado EV and its GMC Sierra sibling. GM says it is the largest investment announcement in company history and that it will create 4,000 new jobs. It also says 1,000 jobs will be retained. "We are building on the positive consumer response and reservations for our recent EV launches and debuts, including the GMC Hummer EV, Cadillac Lyriq, Chevrolet Equinox EV and Chevrolet Silverado EV," said GM CEO Mary Barra. GM says the Orion expansion and new battery plant will support an increase in full-size electric truck production capacity to 600,000 units. This is in addition to the Factory ZERO facility in Detroit that will also be constructing the electric Silverado and Sierra. The Orion Township factory current builds the Chevrolet Bolt EV and EUV, and will continue to do so during the plant's conversion. GM did not indicate what will happen with the Bolts once that conversion is complete or whether all will continue to be built at Orion. They do not use the Ultium vehicle architecture. GM will build other EV models at three other factories that are under construction or being converted. They are located in Spring Hill, Tennessee, Ingersoll, Ontario, and Ramos Arizpe, Mexico. GM says that it will have the ability to produce 1 million electric vehicles by 2025. The Ultium Cells Lansing facility is a $2.6 billion joint investment by GM and LG Energy Solution. GM says it alone will create 1,700 jobs once fully operational by late 2024. It will join two other GM Ultium Cells battery factories currently under construction in the United States, one in Ohio and the other in Tennessee. Not all of the $7 billion investment will be for EVs. It also announced $510 million of the total will go toward upgrading the Lansing Delta Township Assembly to produce the next-generation Chevrolet Traverse and Buick Enclave. Money will also go to upgrading Lansing Grand River Assembly.
Submit your questions for Autoblog Podcast #321 LIVE!
Tue, 19 Feb 2013We're set to record Autoblog Podcast #321 tonight, and you can drop us your questions and comments regarding the rest of the week's news via our Q&A module below. Subscribe to the Autoblog Podcast in iTunes if you haven't already done so, and if you want to take it all in live, tune in to our UStream (audio only) channel at 10:00 PM Eastern tonight.
Discussion Topics for Autoblog Podcast Episode #321
Unibody Ford Ranger replacement
