1966 Chevrolet Nova Sedan on 2040-cars
Flower Mound, Texas, United States
Beautiful professionally built Pro street 66 Nova sedan.Super fast Very fresh and new. Garaged entire life and very straight body. Appears stock except for wheels and tires. This car cost over 40 K to build without labor so no unrealistic bids please. Priced with reasonable reserve,but will not be given away No insults please. 468 inch big bock Chevrolet 600 HP. Radical but not too radical to drive. Very fast. Street tor strip. Independent suspension with manual rack and pinion and Flaming River column, Polished aluminum fender wells. 3 inch ceramic coated headers. 9 inch Ford with 4;11 Posi and Moser axles and gears. 8 point NHRA roll cage with Simpson harnesses passenger and driver. MT drag radial brand new in mini-tubs.Mallory ignition and carbon fiber wiring. Bendix electric fuel pump. Aluminum radiator New Weld wheels. No expense was spared on this professionally built Nova. interior and dash are stock. Has nice rake with adjustable completion shocks front and back. drives nice and tracks straight. This car attracts crowds any time driven. Sounds awesome like a big block should. Idles rough at about 1200 RPM. Drive anywhere. Good luck bidding. For questions 501-517-6833.
|
Chevrolet Nova for Sale
1963 chevrolet nova(US $65,000.00)
Blue, straight 6 engine, nova, chevy, good condition, top-notch speaker system
Nova 66' chevy nova ss race car 454 rocket block(US $45,000.00)
1964 chevrolet nova ss super sport
1963 chevy ii nova ss - 0437 vin code, complete rotisserie
Mean 383 stroker motor, new interior, great paint, clean build, sleeper!!!!!(US $25,995.00)
Auto Services in Texas
Z Rated Automotive Sales & Service ★★★★★
Xtreme Tinting & Alarms ★★★★★
Wayne`s World of Cars ★★★★★
Vaughan`s Auto Glass ★★★★★
Vandergriff Honda ★★★★★
Trade Lane Motors ★★★★★
Auto blog
2015 Chevy Spark will have lighter, smaller battery
Thu, May 15 2014As General Motors gets ready to release the 2015 Chevy Spark EV, it is retooling the Brownstown Battery Assembly to build a new battery system for the chirpy little electric car. The new Spark will lose a few pounds and kWh from its lithium-ion pack, but it will keep all of it's performance specs. The current Spark EV uses a 21-kWh lithium-ion battery pack with bits made by A123 Systems (known as B456 Systems during bankruptcy). For the 2015 model, GM is going to build a 19-kWh battery system in-house that will use 192 LG Chem cells. Losing a bit of energy capacity means that the battery system for the 2015 Spark EV will be 86 pounds lighter but it will keep the EPA-rated 82-mile range and 119 MPGe. The 2015 Spark EV also keeps its $26,685 (plus destination) starting price from the 2014 model. The car will once again qualify for a federal tax credit of up to $7,500. LG Chem also supplies the cells for GM's other plug-in vehicles from its facility in Western Michigan. The Brownstown production line currently builds the battery packs for the Chevy Volt, the Opel Ampera and the Cadillac ELR. You can read our first drive of the 2014 Chevy Spark here. Brownstown Battery Assembly Expands Capabilities Will build battery system for 2015 Chevrolet Spark EV 2014-05-14 DETROIT – General Motors will bring all its electric vehicle battery building capabilities in-house with production of battery systems for the 2015 Chevrolet Spark EV at its battery assembly plant in Brownstown, Mich. "Using our in-house engineering and manufacturing expertise enabled us to deliver a battery system that is more efficient and lighter than the 2014 Spark EV without sacrificing range," said Larry Nitz, executive director of GM global transmission and electrification engineering. "Our successful working relationship with LG Chem has allowed us to deliver a new battery system for the Spark EV that helps us to better leverage our economies of scale." A newly designed battery system features an overall storage capacity of 19 kWh and uses 192 lithium ion cells. The cells are produced at LG Chem's plant in Holland, Mich. The battery system weight of 474 lbs. is 86 pounds lighter than the system in the 2014 Spark EV. The Spark EV battery is built on a dedicated production line at Brownstown, which also manufactures complete battery packs for the Chevrolet Volt, Opel Ampera and Cadillac ELR.
2015 Chevy Silverado, GMC Sierra recalled for steering issues
Thu, Sep 13 2018DETROIT — General Motors Co is recalling more than 1 million pickup trucks and sport utility vehicles in the United States due to issues with a temporary loss of power steering, the National Highway Traffic Safety Administration said. The recall is for 2015 models. They are: the Chevy Silverado 1500, Suburban and Tahoe, GMC Sierra 1500, Yukon and Yukon XL and Cadillac Escalade. The problem may cause difficulty steering the vehicle, especially at low speeds, increasing the risk of a crash, the auto safety regulator said in a document dated Sept. 12. The document did not highlight any reports of accidents and injuries, because of the power steering issue. GM dealers will update the power steering module software, free of charge for owners of the affected vehicles. In 2014, the No.1 U.S. automaker had recalled nearly 800,000 pickup trucks worldwide because of the same problem. GM did not immediately respond to a request for comment.Related Video:
LG Chem ready to double workforce at plant that makes Volt batteries
Fri, May 15 2015With a history that involves paying people not to work, the fact that LG Chem is going to hire more people for its electric-vehicle battery plant in Holland, Michigan is good news on a couple fronts for the Korean company. The South Korea-based LG Chem is holding a job fair at the factory about 30 miles west of Grand Rapids. The company wants to double its workforce this year to "several hundred people." LG Chem, whose factory notably makes the cells for General Motors' Chevrolet Volt extended-range electric vehicle battery, is looking for everything from technical operators to maintenance workers to production supervisors. The company held a previous job fair last September that resulted in about 40 people being hired. The prior year, though, LG Chem gained a measure of infamy after the US Department of Energy (DOE) discovered that workers were, for a time, getting paid to do absolutely nothing because low demand for battery packs made it cheaper for the factory to remain idle. With LG Chem also making electric-vehicle battery components for Ford, Renault, Hyundai, and Volvo, though, those lazy days appear to be long gone. Take a look at LG Chem's press release below. Show full PR text LG Chem Michigan Inc. 2nd Job Fair Will Help To Double Its Holland Workforce HOLLAND, Mich., May 13, 2015 /PRNewswire/ -- LG Chem Michigan Inc. (LGCMI) is conducting a 2nd job fair on Thursday, May 14 as part of the company's efforts to double the size of its production workforce in 2015. LGCMI is an air-conditioned, clean room production environment with strong opportunity for career growth. Over 250 people attended the first job fair and the company is looking for more people to help it grow with increased production volume and new models. The company is adding production equipment and new processes and expects to employ several hundred people by the end of the year. Globally, LG Chem has numerous automakers as clients for EV batteries including GM, Ford, Renault, Hyundai/Kia, Volvo, Audi and Daimler etc. The company's push to build its workforce continues on Thursday, May 14 with an all-day job fair at the company's facilities, located at 1 LG Way in Holland. The event will take place from 9:00 a.m. until 6:00 p.m. and is open to everyone seeking employment opportunities with the company. Prospective candidates should plan to meet with members of LGCMI's staff to learn more about opportunities available at this market-leading, advanced-technology manufacturing company.