Find or Sell Used Cars, Trucks, and SUVs in USA

1985 Chevy Monte Carlo Cl on 2040-cars

Year:1985 Mileage:49000
Location:

Williams Bay, Wisconsin, United States

Williams Bay, Wisconsin, United States
Advertising:

1985 Chevrolet Monte Carlo CL
49,000 original miles, car is in excellent condition. Automatic 8 cylinder with a 4 barrel. Mostly all original extremely well maintained!!! For details please call 262-245-6576 and ask for Jack for further details.

Buyer will need to arrange for shipping or pick up of vehicle at their expense.

Auto Services in Wisconsin

Wildes Transmission ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Auto Transmission
Address: 6720 US Highway 12, Tomah
Phone: (608) 378-4393

Waller`s Auto Glass Express ★★★★★

Automobile Parts & Supplies, Wheel Alignment-Frame & Axle Servicing-Automotive, Brake Repair
Address: 108 W 3rd St N, Ladysmith
Phone: (715) 532-5282

Van Hoof Service ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Towing
Address: Neenah
Phone: (920) 766-9031

Transmission Shop ★★★★★

Automobile Parts & Supplies, Auto Transmission
Address: 211 Lake Ave, Wilmot
Phone: (847) 356-8515

Tracey`s Automotive ★★★★★

Auto Repair & Service, Automobile Diagnostic Service, Automobile Inspection Stations & Services
Address: 802 S 9th Ave, Wausau
Phone: (715) 845-9325

T & N Tire Service ★★★★★

Auto Repair & Service, Tire Dealers, Tire Recap, Retread & Repair
Address: 2923 N Teutonia Ave, New-Berlin
Phone: (414) 562-6211

Auto blog

GM delays truck plant shift so workers can watch Detroit Lions NFC Championship game

Thu, Jan 25 2024

It would be difficult to overstate just how big of a deal it is for the city of Detroit and its residents (and residents of southeast Michigan in general) that the Detroit Lions not only made it convincingly into the NFL playoffs but found significant success in defeating the Los Angeles Rams in the Wildcard round and then the Tampa Bay Buccaneers the following week. But if there's one thing we can point to as an automotive-minded group, it's this: General Motors has delayed the start of the third shift at its Flint Assembly plant so that workers won't have to miss any part of the game. To emphasize the magnitude of this decision, it's important to note that the Chevrolet Silverado HD and GMC Sierra HD are built at the plant, and the popularity and, perhaps more importantly, profitability of those heavy duty trucks is so high that it's the only GM plant in Michigan that runs a third shift, as pointed out by the Detroit Free Press. The delay is roughly an hour in total, and workers won't be paid for that missing time. We doubt there will be any complaints. Granted, this isn't the first time GM has delayed starting a late shift due to a big sporting event. In prior years, delays have been recorded for some Super Bowls and for the in-state Michigan vs. Michigan State rivalry game at GM facilities in Lansing, Michigan. Still, GM's statement on why it would hold off production of such a lucrative pair of vehicles explains it better than we can: "We recognize the Detroit Lions playing in the NFC Championship game as a rare, unique opportunity that warrants this temporary schedule adjustment to allow employees to enjoy the game and make it to work on time." It's not GM's only show of Lions pride. Take a close look at the General Motors logo currently being displayed at the Renaissance Center, GM's headquarters in Detroit. General Motors is displaying its Motor City pride with a subtle logo redesign to honor the Detroit Lions as they continues their Super Bowl hunt. Read more: https://t.co/Jmc6bmMK6n pic.twitter.com/9bJJqOmwxB — Ad Age (@adage) January 23, 2024 The Free Press reached out to Ford and Stellantis to see if either of GM's rivals would be making shift adjustments as well. Ford has yet to provide a comment, but Stellantis, makers of the Ram truck and Jeep SUVs, has confirmed it will be running normal schedules at all of its facilities. For now, there's only one more question that needs answering: What if the game goes to overtime?

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.

Chevy reveals new IndyCar aero package

Tue, Feb 17 2015

The IndyCar Series is not one that demands its participating teams and automakers to design their own chassis as they do in Formula One, but for this season, the organizers have opened it up to allow for custom aero packages. What you're looking at here is the new look of the chassis to be fielded by teams running under Chevy power. Based on the Dallara DW12 chassis – introduced three years ago and named after the late Dan Wheldon – Chevy's new package is designed for road courses and short ovals, with the speedway configuration to be revealed later. The kit features new wings front and rear and more sculpted side pods. It's also got new wedges at the back to envelop the otherwise open wheels that are a hallmark of Indy racing, a more streamlined engine cover and bigger rear bumper pods. The new package will debut at the Grand Prix of St. Petersburg that will kick off this year's championship in Florida on March 29, followed by the road-course grands prix in Louisiana, Long Beach, Alabama and Indianapolis before the new package needs to be ready for the Indy 500 late in May. Half of the teams on the starting grid this season will be running under Chevy power and are expected to use this new aero kit, with the remaining Honda teams slated to run a different package of their own. Chevrolet Debuts All-New 2015 IndyCar Aero Package Chevy-developed bodywork delivers improved aerodynamics 2015-02-17 INDIANAPOLIS – Chevrolet-powered racecars in the 2015 Verizon IndyCar Series will feature Chevrolet-developed aero packages. Chevrolet introduced the road course/short oval body design today at the Indianapolis Motor Speedway. It is distinguished from the previous racecar with new front wing elements, sculpted side pods and a new rear wing. A speedway configuration for the aero kit, designed for high-speed ovals, will be introduced ahead of its competitive debut at Indianapolis in May. "This is an important milestone in Chevrolet's involvement in IndyCar racing," said Jim Campbell, General Motors U.S. vice president of Performance Vehicles and Motorsports. "We focused on developing an aerodynamic package that delivers an balanced combination of downforce and drag, along with integrated engine performance. It's a total performance package." The new Chevy road course aero configuration delivers greater aerodynamic performance than the previous design.