Find or Sell Used Cars, Trucks, and SUVs in USA

Cd Player Alloy Wheels Cruise Control All Power Warranty Avail Off Lease Only on 2040-cars

US $12,999.00
Year:2011 Mileage:45053 Color: Blue /
 Black
Location:

Opa-Locka, Florida, United States

Opa-Locka, Florida, United States
Advertising:
Transmission:Automatic
Body Type:Sedan
Engine:4
Vehicle Title:Clear
Fuel Type:Gasoline
For Sale By:Dealer
VIN: 1G1ZC5E13BF362233 Year: 2011
Make: Chevrolet
Model: Malibu
Warranty: Vehicle does NOT have an existing warranty
Mileage: 45,053
Sub Model: LT Stk# 4542
Exterior Color: Blue
Doors: 4
Interior Color: Black
Drive Train: Front Wheel Drive
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. ... 

Auto Services in Florida

Zacco`s Import car services ★★★★★

Auto Repair & Service, Automobile Air Conditioning Equipment-Service & Repair, Brake Repair
Address: 6144 springer dr, Port-Richey
Phone: (727) 845-8657

Y & F Auto Repair Specialists ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Automobile Diagnostic Service
Address: 5130 NW 15th St, Lauderhill
Phone: (954) 978-7799

Xtreme Auto Upholstery ★★★★★

Automobile Parts & Supplies, Automobile Seat Covers, Tops & Upholstery, Boat Covers, Tops & Upholstery
Address: 549 N Goldenrod Rd, Winter-Garden
Phone: (407) 674-9523

X-Treme Auto Collision Inc ★★★★★

Automobile Body Repairing & Painting
Address: 7526 Narcoossee Rd, Orlo-Vista
Phone: (407) 243-5599

Velocity Window Tinting ★★★★★

Auto Repair & Service, Window Tinting, Glass Coating & Tinting
Address: 1136 E Altamonte Dr, Casselberry
Phone: (407) 383-3363

Value Tire & Alignment ★★★★★

Auto Repair & Service, Tire Recap, Retread & Repair, Tire Dealers
Address: 587 105th Ave N Unit #28, Glen-Ridge
Phone: (561) 290-0127

Auto blog

Our favorite mid-engine Corvette theories and rumors

Tue, Sep 13 2016

The mid-engine Corvette! We just saw blurry photos through the foliage, and are hearts are all aflutter because it means that this car is real. And it's the most " never before" Corvette since 1984. Which leads us to all kinds of wacky theories and speculation. Everybody knows something or heard from a guy. None of those guys (or gals) from GM are talking to Autoblog, to be clear. But that won't stop us from stirring the pot. Let's go over a few point-by-point. The pushrod engine will be replaced by an overhead-cam V8 Car and Driver has repeatedly reported that an overhead-cam engine will come after the mid-engine Corvette's debut with an old-school pushrod. We've heard the same thing firsthand, albeit from a source with no connection to the development of the Corvette or powertrain. "At some point two valves can't pass future emissions regulations," said the guy we know. While the pushrod engine is compact, the design makes it difficult - if not impossible - for sophisticated variable valve timing (and lift) systems that control combustion with more precision. Hasty conclusion: The pushrod engine has a finite life in front of it. This one's a lock, it's a just a matter of when. Bowling Green's new paint shop is really the mid-engine assembly line Credit to Reddit for this one. Like we said, everybody knows a guy. But let's look deeper. The new paint facility costs $439 million dollars and adds 450,000 square feet, almost half the size of the existing plant. Plus GM announced another $290 million in upgrades at Bowling Green Assembly. That sure sounds like a lot of money, but you can actually spend that much on a paint booth. Porsche spent 500 million Euros (about $561 million dollars) to add the Macan assembly to its Leipzig, Germany plant in 2014. Chrysler shelled out $850 million for a paint shop in Sterling Heights, Michigan. GM spent $600 million for a new paint shop at the Fairfax (Kansas City) plant. Honda, on the other hand, is working on a thrifty $210 million project in Marysville, Ohio that includes a 300,000 square foot expansion, and the low-volume Acura NSX facility only cost $70 million. Hasty conclusion: The square footage and cost could easily mean a new assembly line instead of (or in addition to) a paint line. And if the NSX plant was really that cheap, GM could have hidden a similar sum in its existing announcements.

UAW to vote on strike at Kentucky Corvette plant

Tue, 08 Apr 2014

The current wait time for a new Chevrolet Corvette Stingray is well, not short. With word of a strike at the Bowling Green, KY factory responsible for seventh-generation sports car, though, that wait time could end up growing substantially.
Now, a strike is still a ways off. UAW Local 2164, which represents the 800 workers responsible for screwing the Corvette together, is set to vote on authorizing a strike today, but even if the employees give the action a go, it's far from a sure thing. According to The Tennessean, both regional and national union officials would need to put their stamp of approval on strike action.
"The membership has to vote to strike, but it's just a step in the process," said Gary Casteel, the UAW's Region 8 director and one of the people that would need to authorize a strike action. Casteel told The Tennessean, "It's purely a local situation, though. They are having some issues with the local management."

GM plans to restart production in Mexico on May 20

Mon, May 18 2020

MEXICO CITY — General Motors is tentatively planning to restart operations at its auto assembly plant in the Mexican city of Silao on May 20, according to a message to workers seen by Reuters on Sunday, as the car industry prepares to exit the coronavirus lockdown. Separately, the president of GM's Mexican unit advised suppliers to prepare to resume operations. “We are now beginning a new phase given the Mexican governmentÂ’s official announcement earlier this week to consider the transportation manufacturing industry as essential for the countryÂ’s economy,” Francisco Garza, president ofGeneral Motors de Mexico, wrote in an email to suppliers dated on Friday that was viewed by Reuters. The reopening of the plant  in Silao would be a positive signal for the auto sector in North America, whose supply lines are highly interconnected between the United States, Mexico and Canada. The plant in the central state of Guanajuato has been idled for weeks due to the coronavirus outbreak. Workers had previously been told to plan to return to their jobs on May 18. A GM spokeswoman said the company could not confirm when it would restart operations at any of its facilities in Mexico because it is awaiting more guidance from the government. The message to the plant's workers came after the government on Friday clarified when the industry could begin easing restrictions imposed because of the health emergency. On Wednesday, the government said automakers could start going back into production from May 18. It then withdrew that advice and suggested the new start date would be June 1. Finally it indicated the sector, which forms the backbone of Mexican manufacturing, could begin operating as soon as next week if companies had the required safety measures in place. U.S. officials and its auto industry have pressed Mexico's government to get its factories open again because American operations depend heavily on parts from south of the border. However, some politicians are wary of opening too fast. Mexico registered its first case of coronavirus weeks after the United States and Canada and the toll of daily infections and deaths in the country reached new peaks over the past few days. The Silao production facility, which makes highly profitable pickup trucks for GM, is one of the biggest automotive plants in Guanajuato, a major Mexican carmaking state. Related Video: