1967 Chevrolet Impala on 2040-cars
Hesperia, California, United States
Body Type:Coupe
Vehicle Title:Clear
Engine:350
Fuel Type:Gasoline
For Sale By:Private Seller
Number of Cylinders: 8
Make: Chevrolet
Model: Impala
Trim: base coupe 2-door
Drive Type: 2 wheel drive
Mileage: 72,670
Disability Equipped: No
Exterior Color: primer
Warranty: Vehicle does NOT have an existing warranty
Interior Color: Teal
Here we have a genuine barn find. This is a 1967 chevy impala fastback. I started working on this car about two months ago and was unable to continue due to the resent purchase of my house. "The house comes first" at least that's what my wife said. Most of the body work has been done on this car (this usually retails between $3,000 and $6,000) so you are getting a car that is halfway restored.
Overseas buyers welcome- I ship many buses to Europe every year. I can take it to Los Angeles port for an additional $800. Call me +17606699803 between 7am and 10pm Pacific Time. Shipping elsewhere in the USA is normally $600-$1500 depending on where you live. This car is an excellent project that we had to give up due to money being tight. |
Chevrolet Impala for Sale
96 1996 chevy chevrolet impala ss black 31k original miles - lots of custom work
1969 chevy impala
1964 chevrolet impala ss 5.4l barn find
1984 chevrolet impala base sedan 4-door 5.0l
2005 chevrolet impala ls sedan 4-door 3.8l, white, am/fm/cd with amp in trunk(US $2,500.00)
2013 chevy impala ltz heated leather bose spoiler 27k! texas direct auto(US $17,980.00)
Auto Services in California
Yuba City Toyota Lincoln-Mercury ★★★★★
World Auto Body Inc ★★★★★
Wilson Way Glass ★★★★★
Willie`s Tires & Alignment ★★★★★
Wholesale Import Parts ★★★★★
Wheel Works ★★★★★
Auto blog
GM delays 3.0-liter Duramax diesel in Silverado and Sierra pickups
Thu, May 23 2019Stricter testing protocols around the world are making it harder for automakers to predict launch timelines. GM is the latest to get caught in emissions nettles, the Detroit carmaker forced to delay the launch of its new Duramax 3.0-liter inline-six diesel for the Chevrolet Silverado 1500 and GMC Sierra 1500. That's what company reps told dealers in a memo seen by Automotive News this week. Dealers and buyers had been promised the Flint, Mich.-built oil-burner in early 2019, but AN wrote that the EPA certification hiccup has turned into a "slight delay." A GM spokesman told Motor1, "[We] did not attribute [the delay] to a single entity, as the truth is this is a collaborative effort between GM and several government entities. We will make the 2020MY Duramax available for dealers orders soon, and expect to deliver the first trucks to customers soon after emissions testing is complete." We know the new 3.0-liter Duramax diesel has 277 horsepower and 460 pound-feet of torque, outdoing Ford's 3.0-liter PowerStroke diesel by 27 hp and 20 lb-ft. But without final EPA paperwork, GM can't release the numbers that will show how the two engines stack up when considering fuel economy and tow ratings. The certification process has been sticky for a few other makers of late, especially since the Volkswagen Group situation in 2015. BMW had to delay the launch of four diesel models in 2016 over EPA testing. The new Ram 1500 dribbled out in a trickle last year for reasons thought to deal with EPA testing, coming as it did a year after the EPA investigated Ram's EcoDiesel engines in 2017 and 2018. More recently, WLTP testing in Europe caught out just about every automaker over there. Since we're almost halfway through 2019, the delay until the 2020 model year is only a few months. Still, GM told dealers to cancel any orders for the engine for this model year. Dealers will need to resubmit the orders once opening begins, but GM hasn't said when production will begin other than "soon." The company said that it will offer 2020-model-year replacement vehicles to customers and dealers. If prices hold into the next model year, the 2020 Silverado 1500 and Sierra 1500 with the inline-six diesel will come at a $3,890 premium over the 2.7-liter turbo four-cylinder, and a $2,495 premium over the 5.3-liter V8.
GM workers in Oshawa walk out in protest of plant closure
Mon, Nov 26 2018TORONTO/MONTREAL – Canadian Prime Minister Justin Trudeau on Monday expressed his "deep disappointment" in General Motors' decision to close its Oshawa plant, a move Canadian officials only learned about on Sunday and which led workers to walk off the job on Monday. GM said the closure affects a total of 2,973 assembly line jobs. GM's total employment in Canada is 8,150 direct jobs. Workers in the Unifor trade union walked out of the Oshawa plant "in protest," ahead of a meeting with GM about the announcement, a union spokeswoman said. "I've moved my family twice for this company and they do this to me," a tearful worker told CBC TV as he left the plant. Currently, the Oshawa plant builds the Cadillac XTS and Chevy Impala sedans. Under Unifor's four-year contract signed in 2016, GM must give the union a year's notice before closing the plant. The automaker intends to close the plant in December, 2019. A 2015 study commissioned by Unifor, which represents GM employees, estimated that shutting the plant would eliminate 4,100 direct jobs and reduce Ontario's gross domestic product by C$1.1 billion. But Jerry Dias, president of Unifor, said the move amounts to a breach of the automaker's contract with its employees. "We have a collective agreement that says they're not closing any of our facilities ... so we will do anything by any means to make sure that they live up to their word," Dias said at a news conference. Dias said the contract between Unifor and the company forbids GM from closing any of its Canadian plants during the contract period, which ends in September 2020. "They are not closing our damn plant without one hell of a fight." Canadian officials promised to aid auto workers affected by the 2019 closure, part of a wider restructuring by the automaker that will cut production of slow-selling models and slash its North American workforce. "I spoke with GM (CEO) Mary Barra to express my deep disappointment in the closure," Trudeau tweeted on Monday. "We'll do everything we can to help the families affected by this news get back on their feet." GM workers have been part of the heart and soul of Oshawa for generations - and we'll do everything we can to help the families affected by this news get back on their feet. Yesterday, I spoke with @GM's Mary Barra to express my deep disappointment in the closure.
GM announces $7 billion Michigan factory investment, most going to EVs
Tue, Jan 25 2022GM announced a $7 billion investment in Michigan manufacturing, much of which is earmarked for EV production. Four sites are included, but the key elements are a new battery cell plant in Lansing and the conversion of GM's existing Orion Township facility to expand production of the forthcoming Chevrolet Silverado EV and its GMC Sierra sibling. GM says it is the largest investment announcement in company history and that it will create 4,000 new jobs. It also says 1,000 jobs will be retained. "We are building on the positive consumer response and reservations for our recent EV launches and debuts, including the GMC Hummer EV, Cadillac Lyriq, Chevrolet Equinox EV and Chevrolet Silverado EV," said GM CEO Mary Barra. GM says the Orion expansion and new battery plant will support an increase in full-size electric truck production capacity to 600,000 units. This is in addition to the Factory ZERO facility in Detroit that will also be constructing the electric Silverado and Sierra. The Orion Township factory current builds the Chevrolet Bolt EV and EUV, and will continue to do so during the plant's conversion. GM did not indicate what will happen with the Bolts once that conversion is complete or whether all will continue to be built at Orion. They do not use the Ultium vehicle architecture. GM will build other EV models at three other factories that are under construction or being converted. They are located in Spring Hill, Tennessee, Ingersoll, Ontario, and Ramos Arizpe, Mexico. GM says that it will have the ability to produce 1 million electric vehicles by 2025. The Ultium Cells Lansing facility is a $2.6 billion joint investment by GM and LG Energy Solution. GM says it alone will create 1,700 jobs once fully operational by late 2024. It will join two other GM Ultium Cells battery factories currently under construction in the United States, one in Ohio and the other in Tennessee. Not all of the $7 billion investment will be for EVs. It also announced $510 million of the total will go toward upgrading the Lansing Delta Township Assembly to produce the next-generation Chevrolet Traverse and Buick Enclave. Money will also go to upgrading Lansing Grand River Assembly.