2014 Chevrolet Equinox Ls on 2040-cars
1209 E Broad Ave, Rockingham, North Carolina, United States
Engine:2.4L I4 16V GDI DOHC
Transmission:6-Speed Automatic
VIN (Vehicle Identification Number): 2GNALAEK4E1142849
Stock Num: C142849
Make: Chevrolet
Model: Equinox LS
Year: 2014
Exterior Color: Black
Interior Color: Light Titanium / Jet Black
Options: Drive Type: FWD
Number of Doors: 4 Doors
Nobody Beats a Dieffenbach Deal!
Chevrolet Equinox for Sale
2014 chevrolet equinox 1lt(US $27,485.00)
2014 chevrolet equinox 2lt(US $33,030.00)
2013 chevrolet equinox 1lt(US $23,487.00)
2012 chevrolet equinox ls(US $19,939.00)
2012 chevrolet equinox 1lt(US $21,963.00)
2012 chevrolet equinox ls(US $16,643.00)
Auto Services in North Carolina
Your Automotive Service Center ★★★★★
Whistle`s Body Shop ★★★★★
Village Motor Werks ★★★★★
Tyrolf Automotive ★★★★★
Turner Towing & Recovery ★★★★★
Triangle Auto & Truck Repair ★★★★★
Auto blog
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.
GM follows Ford and Honda in skipping SEMA
Fri, May 20 2022The list of automakers skipping SEMA has become longer. First reported by Muscle Cars and Trucks, and confirmed to us by a company representative, General Motors will not have an official presence at the aftermarket show. It joins Ford and Honda in leaving the show. It will be a large hole in the show, with the GM brands typically filling a significant swath of available show space in one of the main halls. GM hasn't provided much explanation for the move, either. The GM representative provided Autoblog with the same statement that Muscle Cars and Trucks got: "GM has made the decision not to participate in the 2022 SEMA Show. The SEMA show has always inspired us, and accessories and performance parts remain an important part of our business." We also asked if we would see any sort of announcements around the time of the show — Ford said it has plans to share some things around that time — however, the GM representative said that the company has no immediate plans for announcements. Certainly things could change between now and the November show, though. SEMA had previously noted that other exhibitors would help fill in some of the space vacated by these major OEMs. Another OEM, Volkswagen, is returning to the show after an absence, which will also help with the display deficit. Related Video:
Chevy Bolt 200-mile EV going into production near Detroit
Thu, Feb 12 2015Where there's smoke, there's fire, apparently. The rumors of the Chevy Bolt going into production have been proven correct, with an announcement this morning at the Chicago Auto Show that the 200-mile, all-electric Bolt will be built at the Orion Assembly facility near Detroit. GM didn't say exactly when the Bolt will be built, but GM North America president Alan Batey said in a statement that, "We are moving quickly because of its potential to completely shake up the status quo for electric vehicles." He's not kidding. GM is talking about a $30,000 price tag for an EV that can do twice as many electric miles as any non-Tesla mass-production EV today. Previous hints have the Bolt starting production next year for a market debut in 2017, and with all of the accuracy we've seen from these secret releases up to now, we're going to say this is probably accurate until we hear otherwise. We still have questions about the price tag, but for now we'll try to track down more information here in Chicago. Chevrolet Commits to Bolt EV Production Game-changing, long-range EV to be built at Orion Assembly facility in Michigan CHICAGO – Chevrolet this morning confirmed production of its next-generation pure electric vehicle, based on the Bolt EV concept. It will be built at General Motors' Orion Assembly facility near Detroit. GM North America President Alan Batey made the announcement ahead of the Chicago Auto Show. The Bolt EV concept was introduced last month at the North American International Auto Show in Detroit. "The message from consumers about the Bolt EV concept was clear and unequivocal: Build it," said Batey. "We are moving quickly because of its potential to completely shake up the status quo for electric vehicles." Leveraging the industry-leading battery technology found in the Chevrolet Volt and Spark EV, the Bolt EV concept was developed as a game-changing, long-range pure electric for all 50 states, designed to offer more than a GM-estimated 200 miles of range at a target price of around $30,000. The progressively styled concept vehicle features selectable driving modes for preferred driving styles, such as daily commuting, and it was designed to support DC fast charging. "We're proud that Chevrolet has decided to produce the Bolt EV here in Michigan at the Orion Assembly facility," Gov. Rick Snyder said. "Michigan unquestionably remains the global automotive leader.