1975 Chevrolet Caprice Classic Convertible 2-door 5.7l on 2040-cars
Gallupville, New York, United States
Body Type:Convertible
Vehicle Title:Clear
Engine:350
Fuel Type:GAS
For Sale By:Private Seller
Number of Cylinders: 8
Make: Chevrolet
Model: Caprice
Trim: Classic
Options: CD Player, Convertible
Drive Type: Automatic
Power Options: Power Locks, Power Windows
Mileage: 18,000
Exterior Color: Red
Interior Color: Beige
Warranty: Vehicle does NOT have an existing warranty
Beautiful Convertible in showroom condition, brand new top, cables, well and rear window. Must see to appreciate. Buyer is responsible for shipping. Contact Jim 518 872 2897
Chevrolet Caprice for Sale
1995 chevrolet caprice classic *25,000 original miles*
1973 chevrolet caprice classic hardtop 2-door 350 v8(US $7,300.00)
1975 chevrolet caprice convertible full air ride suspinsion asanti wheels(US $12,500.00)
1974 chevrolet caprice classic sedan 4-door vinyl roof, fully loaded(US $6,300.00)
1969 chevrolet caprice 427
#'s matching 396, 82k actual miles, a/c, ps, pb, hide-a-ways, protect-o-plate!(US $15,995.00)
Auto Services in New York
Zuniga Upholstery ★★★★★
Westbury Nissan ★★★★★
Valvoline Instant Oil Change ★★★★★
Valvoline Instant Oil Change ★★★★★
Value Auto Sales Inc ★★★★★
TM & T Tire ★★★★★
Auto blog
GM to add 1,200 workers at 2 Michigan factories
Sat, Feb 29 2020DETROIT — General Motors is adding 1,200 jobs at two Michigan factories to build midsize SUVs and two new luxury sedans. GM said Friday that its Lansing Delta Township plant will get a third shift and 800 more workers to build the Chevrolet Traverse and Buick Enclave SUVs, which have three rows of seats. The Lansing Grand River plant will get a second shift and 400 more workers to build two new Cadillac sedans, the CT4 and CT5. Employees laid off at other GM factories will fill the new jobs first, then workers will be added, GM spokesman Dan Flores said. The company has not determined yet how many new people will be needed, he said. Both additional shifts will start working sometime between April and June, the company said. Lansing Delta Township now employs about 2,500 salaried and blue-collar workers, while the Grand River plant has 1,400. GM sold more than 147,000 Traverse SUVs in the U.S. last year, a 0.4% increase from 2018. Enclave sales were up 3% to just over 51,000, according to Autodata Corp. Related Video:
GM to sink over $900M into 4 plants, mostly for a new V8
Fri, Jan 20 2023FLINT, Mich. — General Motors says it will spend more than $900 million to update four factories, with the bulk going to an engine plant in Flint, Michigan, to build the next-generation V8 for big pickup trucks and SUVs. Factories in Rochester, New York; Defiance, Ohio; and Bay City, Michigan, also will see investments, some to make V8 engine components as well as parts for future electric vehicles, the company said Friday. The investments won't create any new jobs, but they will preserve about 2,400 hourly and salaried positions positions at the four sites, the company said. The investments “provide job security at these plants for years to come,” Gerald Johnson, GM's manufacturing chief, said in a statement. Much of the money, $579 million, will go to Flint Engine Operations for equipment to build the sixth-generation small-block V8 that will go into the next round of big pickup trucks and SUVs. The plant now employs about 700 people who also will keep making their current product, a diesel engine used in light trucks. GM, like other automakers, is facing stricter government fuel economy standards and pollution limits starting in the 2024 model year. New vehicles sold in the U.S. will have to average at least 40 miles per gallon of gasoline in 2026, up from about 28 mpg, under new Biden administration rules that undo a rollback of standards enacted under former President Donald Trump. That means the new V8 will have to get better mileage and pollute less than the current versions. Although GM wouldn't release details on the new engine, Johnson said during a news conference at the Flint plant that it would be more efficient than the current version. GM has a goal of selling only electric passenger vehicles by 2035, but Johnson said that's a dozen years out, a period when many customers will still want gas engines. “We know that has a horizon,” he said. “Between here and there, there are a lot of internal combustion customers that we don't want to lose,” he said. In addition to Flint, GM's engine components plant in Bay City, Michigan, will get $216 million to build camshafts and connecting rods, and to machine engine blocks and heads for the new V8 being built in Flint. The plant now employs about 425. The Defiance, Ohio, foundry will get $55 million to build a variety of block castings for the new V8. Included is $8 million for castings to support future electric vehicles, the company said. The plant has about 530 employees.
LG Chem ready to double workforce at plant that makes Volt batteries
Fri, May 15 2015With a history that involves paying people not to work, the fact that LG Chem is going to hire more people for its electric-vehicle battery plant in Holland, Michigan is good news on a couple fronts for the Korean company. The South Korea-based LG Chem is holding a job fair at the factory about 30 miles west of Grand Rapids. The company wants to double its workforce this year to "several hundred people." LG Chem, whose factory notably makes the cells for General Motors' Chevrolet Volt extended-range electric vehicle battery, is looking for everything from technical operators to maintenance workers to production supervisors. The company held a previous job fair last September that resulted in about 40 people being hired. The prior year, though, LG Chem gained a measure of infamy after the US Department of Energy (DOE) discovered that workers were, for a time, getting paid to do absolutely nothing because low demand for battery packs made it cheaper for the factory to remain idle. With LG Chem also making electric-vehicle battery components for Ford, Renault, Hyundai, and Volvo, though, those lazy days appear to be long gone. Take a look at LG Chem's press release below. Show full PR text LG Chem Michigan Inc. 2nd Job Fair Will Help To Double Its Holland Workforce HOLLAND, Mich., May 13, 2015 /PRNewswire/ -- LG Chem Michigan Inc. (LGCMI) is conducting a 2nd job fair on Thursday, May 14 as part of the company's efforts to double the size of its production workforce in 2015. LGCMI is an air-conditioned, clean room production environment with strong opportunity for career growth. Over 250 people attended the first job fair and the company is looking for more people to help it grow with increased production volume and new models. The company is adding production equipment and new processes and expects to employ several hundred people by the end of the year. Globally, LG Chem has numerous automakers as clients for EV batteries including GM, Ford, Renault, Hyundai/Kia, Volvo, Audi and Daimler etc. The company's push to build its workforce continues on Thursday, May 14 with an all-day job fair at the company's facilities, located at 1 LG Way in Holland. The event will take place from 9:00 a.m. until 6:00 p.m. and is open to everyone seeking employment opportunities with the company. Prospective candidates should plan to meet with members of LGCMI's staff to learn more about opportunities available at this market-leading, advanced-technology manufacturing company.





