Find or Sell Used Cars, Trucks, and SUVs in USA

1992 Chevrolet Silverado C-10 on 2040-cars

US $11,000.00
Year:1992 Mileage:60315
Location:

Pittsburgh, Pennsylvania, United States

Pittsburgh, Pennsylvania, United States
Advertising:

1992 chevrolet silverado custom pick/up truck. 
1.american racing wheels
2.goodyear rised yellow letter tires 275/60r15
3. custom side exhaust (chrome-tips)
4.chrome outside mirrors
5.chrome door handles & gas door
6.custom hood (scoops)
7.2 inch lowered front & rear suspension
8.tinted side windows
9.grant steering wheel
10.wood trim interior
11. auto gauge tach
12. auto gauge gauges (oil/water/volt)
13.interior led lights
14. side effects & running boards
15. hooker headers
16.edelbrock preformer manifold

17. rear slider window
18. holley 650 cfm carburator (with electric choke)
19. accell high engery distributor & wires
20. 350 cid 500 hp engine (this engine will snap your neck back )
this truck is in perfect condition has neaver seen any type of bad weather has always been garage kept
asking $16,000.00

Auto Services in Pennsylvania

X-Cel Auto & Truck Repair ★★★★★

Auto Repair & Service
Address: 545 Rodi Rd, Etna
Phone: (412) 241-8800

Wynne`s Express Lube & Auto ★★★★★

Auto Repair & Service, Used Car Dealers, Automobile Parts & Supplies
Address: 1635 W Main St, Cedars
Phone: (610) 489-4050

Westwood Tire and Automotive Inc. ★★★★★

Auto Repair & Service, Tire Dealers
Address: 1391 Valley Rd, Coatesville
Phone: (484) 401-9063

Waynes Truck & Auto Service ★★★★★

Auto Repair & Service
Address: 1937 Beaver Dam Rd, Portage
Phone: (814) 239-9434

Triple Nickel Auto Parts ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Automobile Parts & Supplies-Used & Rebuilt-Wholesale & Manufacturers
Address: 2956 Lincoln Way W, Lemasters
Phone: (717) 267-2500

Top Gun Auto Painting & Bdywrk ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Automobile Parts & Supplies
Address: 140 N 2nd St # 16, Long-Pond
Phone: (570) 476-5616

Auto blog

GM to build outgoing Silverado and Sierra until late 2019

Tue, Nov 6 2018

As it has done with previous generations, General Motors is keeping the outgoing versions of its 1500 pickups in production despite the arrival of the all-new 2019 Chevrolet Silverado and 2019 GMC Sierra. The production of the previous, K2 generation models will begin to be wound down gradually, according to Automotive News, starting with crew cabs "early next year," and double and regular cab models following during "the early second half of next year." The old model trucks will continue to be built into "late 2019" based on market demand, GM's spokesperson Kim Carpenter said. The Chevrolet will go by the name Silverado LD, with the GMC Sierra designation still to be announced. Some of the outgoing models are built by sharing the assembly work between two GM plants. Partially finished Silverado and Sierra double cab bodies are shipped from Fort Wayne, Ind., to Oshawa, Ont., where the trucks are completed, including receiving paint. This eases the workload in Fort Wayne, where production of the new T1 generation trucks started in July 2018. In January, the Silao plant in Mexico will take on the duties of building new generation regular cab and crew cab trucks. Carpenter also said that the "Oshawa shuttle," as the shared production is called, has been very successful. As a result, 60,000 more trucks will be built than what the original production forecast initially called for. GM's latest quarterly profits, disclosed last week to be $1 billion, have been far higher than expected and will result in full-year profits far higher than what had been predicted in light of steel tariffs. GM isn't the only truck maker taking a similar multi-generation approach for 2019. Both the outgoing and redesigned Ram 1500 are in production, with the previous generation being dubbed Ram 1500 Classic. Related Video:

GM says over 40% of new China launches in next five years will be EVs

Wed, Aug 19 2020

SHANGHAI — General Motors is planning an electric car offensive in China with more than 40% of its new launches in the country over the next five years set to be electric vehicles (EVs), the U.S. carmaker said on Wednesday. GM's electric vehicles, many of which will be all-electric battery cars, will be manufactured in China with almost all parts coming from local suppliers, the company said in a statement released at its Tech Day event in Shanghai. Reuters reported earlier on Wednesday that GM was planning to overhaul its Chinese line-up to stem a slide of sales after more than two decades of growth in a country that contributes nearly a fifth of its profit. GM's new China boss Julian Blissett told Reuters that new technologies, such as EVs and cars with near hands-free driving for highways, would play a key role in GM's China initiatives, which are part of a push to get annual sales in the country back to the 4 million peak it hit in 2017. GM did not say in its statement how many new or significantly redesigned models it was planning to launch in China over the next five years. "China will play a crucial role in making our vision a reality," GM CEO Mary Barra said in the statement, referring to its initiative to create what it describes as a future of "zero crashes, zero emissions and zero congestion" through electrification and smart-driving technologies. GM has said it plans to invest more than $20 billion in electric and automated vehicles globally by 2025. It was not clear how much of that investment will be spent in China. (Reporting by Norihiko Shirouzu in Shanghai; Editing by David Clarke) Related Video: Green Buick Cadillac Chevrolet GM Electric China

UAW to vote on strike at Kentucky Corvette plant

Tue, 08 Apr 2014

The current wait time for a new Chevrolet Corvette Stingray is well, not short. With word of a strike at the Bowling Green, KY factory responsible for seventh-generation sports car, though, that wait time could end up growing substantially.
Now, a strike is still a ways off. UAW Local 2164, which represents the 800 workers responsible for screwing the Corvette together, is set to vote on authorizing a strike today, but even if the employees give the action a go, it's far from a sure thing. According to The Tennessean, both regional and national union officials would need to put their stamp of approval on strike action.
"The membership has to vote to strike, but it's just a step in the process," said Gary Casteel, the UAW's Region 8 director and one of the people that would need to authorize a strike action. Casteel told The Tennessean, "It's purely a local situation, though. They are having some issues with the local management."