Find or Sell Used Cars, Trucks, and SUVs in USA

1967 Chevrolet C10tubbed Out on 2040-cars

US $10,000.00
Year:1967 Mileage:2000
Location:

Winston-Salem, North Carolina, United States

Winston-Salem, North Carolina, United States
Advertising:

 1967 c10 TUBBED OUT FOR DRAG DRUCK.  tHIS IS A PROJECT TRUCK, IT HAS A 350 BORED TO A 355, YOU CAN DEFNATLY DO QUITE THE BURNOUT, 9IN REAR END AND THE LIST GOES ON AND ON,  ITS A MUST SEE

Auto Services in North Carolina

Young`s Auto Center & Salvage ★★★★★

Automobile Parts & Supplies, Used & Rebuilt Auto Parts, Automobile Electrical Equipment
Address: 400 Nash St NE, Kenly
Phone: (877) 594-2693

Wright`s Transmission ★★★★★

Auto Repair & Service, Auto Transmission
Address: 601 Julian Ave, Belews-Creek
Phone: (336) 472-0755

Wilson Off Road ★★★★★

Automobile Parts & Supplies, Automobile Accessories, Auto Body Parts
Address: 520 E Russell St, Lumber-Bridge
Phone: (910) 423-4947

Whitman Speed & Automotive ★★★★★

Auto Repair & Service, Brake Repair, Engine Rebuilding & Exchange
Address: 997 jacob street, Archdale
Phone: (336) 313-5237

Webster`s Import Service ★★★★★

Auto Repair & Service, Automobile Diagnostic Service, Automobile Inspection Stations & Services
Address: 306 Grumman Rd, Walkertown
Phone: (336) 393-0023

Vester Nissan ★★★★★

New Car Dealers, Used Car Dealers
Address: 412 Southeast Blvd, Faison
Phone: (910) 590-2005

Auto blog

GM already raising prices on 2014 Silverado and Sierra pickups

Mon, 14 Oct 2013

General Motors must be pretty pleased with sales of its two newest pickups, the GMC Sierra and Chevrolet Silverado, as it's announced price hikes for both models, as part of a planned price tweak.
Prices will be bumped by as much as $1,500, although weirdly, they'll be offset by as much as $1,500 in cash-back offers through the end of October. Fox Business reports that GM spokesman Jim Cain said of the price hike, "With the sell down of the '13 models nearly complete, this price adjustment was planned and is a normal part of business."
The move, as Fox is quick to point out, is an interesting one, as sales of the twin pickups struggled last month relative to the Ford F-Series, while both of GM's crosstown competitors have been aggressively undercutting Silverado and Sierra prices. The F-150 starts at $24,070 and the Ram 1500 comes in at $23,600, not counting any cash on the hood. A base Silverado, meanwhile, retails at $25,575.

Watch this time-lapse build of the Chevy SS for NASCAR

Fri, 08 Feb 2013

There's only about a week left until we get our first look at the production version of the 2014 Chevrolet SS sedan, but Chevrolet NASCAR teams have been looking at the race version of the car all winter. Autoweek has posted a really neat time-lapse video showing just a portion of what it takes to build one of NASCAR's new Gen6 stock cars.
Though the video is quite brief, it does show almost the entire build process starting with just the car's nose, and it gives us a good look at how integral the template is to the final product. As a bonus, Hendrick Motorsports also provided some videos showing two of its teams performing pit stop tests over the winter. The second video shows some of the more detailed aspects of the racecar's rear end, including the stock-looking trunk cutout and a newly mandated rear bumper extension that will be used on super speedways like Daytona and Talladega.
To see what Team Chevy has been up to all off-season, check out all three videos posted after the jump.

GM delaying additional Silverado EV and Sierra EV production to Q4 2025

Tue, Oct 17 2023

This looks like more "Gotcha!" news about storms in the EV sector, but the word "additional" is key here. The Detroit News reported today that GM is pushing delaying production of the Chevrolet Silverado EV and GMC Sierra EV pickups at the Orion Assembly Plant to late 2025, about a year behind expectations. The Silverado EV Work Truck is already in production at GM's Factory Zero in Detroit, which won't change. Retail versions of the Silverado EV are still planned for production at Factory Zero before the end of this year, and the Sierra EV is expected to enter production at Factory Zero early next year. This new plan simply means GM won't add more production of those electric trucks at Orion.  GM builds the Chevrolet Bolt at Orion right now, assembly of that groundbreaking car to end this year. GM's original idea was to spend $4 billion to convert Orion to EV pickup production in time to get its two giant profit makers rolling down lines in early 2025. The move to late 2025 could mean the plant is out of commission for about two years. The facility's 1,261 employees are being offered spots in other plants, including Factory Zero.  The automaker gave several reasons for the move, a spokesperson telling The Detroit News the company wants "to better manage capital investment while aligning with evolving EV demand," and telling the Detroit Free Press, "We're looking at EV demand and the trendline for EVs is stabilizing. ... It is not rising as fast as originally forecasted." On top of that, engineers "have identified engineering improvements that we will implement to increase the profitability of our products." The spokesperson also made it clear that the delay has nothing to do with the UAW strike, now in its 32nd day.  Factory Zero's working up to a near-term production capacity of about 600,000 units annually, GM saying it wanted to get capacity to 1 million EVs annually by the end of 2025. At the moment, the site builds the Silverado EV Work Truck, the GMC Hummer EV pickup and SUV, and the Cruise Origin shuttles — not the Bolt taxis, the autonomous pods. The Detroit News reported GM sold 18 Silverado EV Work Trucks in Q3 this year, GM Authority says GMC Hummer EV production has ramped up to about 3,000 units per month, and Cruise Origin is still waiting on approval from the National Highway Safety Traffic Administration to mass-produce the autonomous shuttles because the shuttles need an exemption for not having steering wheels.