Chevy 1957 2dr Hard Top V-8 327 Muncie 4 Sp on 2040-cars
Johnsonburg, Pennsylvania, United States
Body Type:Coupe
Engine:327 V-8
Vehicle Title:Clear
Fuel Type:Gasoline
For Sale By:Private Seller
Number of Cylinders: 8/ 327
Model: Bel Air/150/210
Trim: Bel Air 2dr hardtop
Drive Type: rear wheel drive
Mileage: 0
Sub Model: Belair 2dr hard top
Disability Equipped: Seamless Frame
Exterior Color: Blue
Warranty: Vehicle does NOT have an existing warranty
Interior Color: Brown
For Sale 1957 Chevy 2 Door Hardtop. 327/300hp. The car came from verginia back In the 80-s. It was painted back In the 80-s and reupholstered.The Interior is deasent to good. Its been In storage since then. Its A 327/300hp with a muncie 4 speed and a hurst shift. The body is very nice. Would require vary little to paint. It has A seamless frame and the floor, floor braces and trunk are all vary good and solid. I have a N O S front fender and N O S rear bumper plus 4 extra front fenders in poor condition with all the bracketry. Motor runs but needs tune up, brake work, tires and exhaust. Nice solid car. would be easy to make A great driver or good restoration project. If you have any questions call me 24-7 Bob Lindberg cell 8145120084
Chevrolet Bel Air/150/210 for Sale
Auto Services in Pennsylvania
Witmer`s Auto Salvage ★★★★★
West End Sales & Service ★★★★★
Walter`s Auto Wrecking ★★★★★
Tony`s Towing ★★★★★
T S E`s Vehicle Acces Inc ★★★★★
Supreme Auto Body Works, Inc ★★★★★
Auto blog
LG Chem ready to double workforce at plant that makes Volt batteries
Fri, May 15 2015With a history that involves paying people not to work, the fact that LG Chem is going to hire more people for its electric-vehicle battery plant in Holland, Michigan is good news on a couple fronts for the Korean company. The South Korea-based LG Chem is holding a job fair at the factory about 30 miles west of Grand Rapids. The company wants to double its workforce this year to "several hundred people." LG Chem, whose factory notably makes the cells for General Motors' Chevrolet Volt extended-range electric vehicle battery, is looking for everything from technical operators to maintenance workers to production supervisors. The company held a previous job fair last September that resulted in about 40 people being hired. The prior year, though, LG Chem gained a measure of infamy after the US Department of Energy (DOE) discovered that workers were, for a time, getting paid to do absolutely nothing because low demand for battery packs made it cheaper for the factory to remain idle. With LG Chem also making electric-vehicle battery components for Ford, Renault, Hyundai, and Volvo, though, those lazy days appear to be long gone. Take a look at LG Chem's press release below. Show full PR text LG Chem Michigan Inc. 2nd Job Fair Will Help To Double Its Holland Workforce HOLLAND, Mich., May 13, 2015 /PRNewswire/ -- LG Chem Michigan Inc. (LGCMI) is conducting a 2nd job fair on Thursday, May 14 as part of the company's efforts to double the size of its production workforce in 2015. LGCMI is an air-conditioned, clean room production environment with strong opportunity for career growth. Over 250 people attended the first job fair and the company is looking for more people to help it grow with increased production volume and new models. The company is adding production equipment and new processes and expects to employ several hundred people by the end of the year. Globally, LG Chem has numerous automakers as clients for EV batteries including GM, Ford, Renault, Hyundai/Kia, Volvo, Audi and Daimler etc. The company's push to build its workforce continues on Thursday, May 14 with an all-day job fair at the company's facilities, located at 1 LG Way in Holland. The event will take place from 9:00 a.m. until 6:00 p.m. and is open to everyone seeking employment opportunities with the company. Prospective candidates should plan to meet with members of LGCMI's staff to learn more about opportunities available at this market-leading, advanced-technology manufacturing company.
GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.
Thu, Jul 14 2022All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.
Recharge Wrap-up: Chevy Volt promos, Audi e-gas partnership
Mon, Feb 29 2016GM is offering promotions on the 2017 Chevrolet Volt. As dealers receive the first shipments of the new model year of the Volt, the automaker is giving customers in certain areas (California, Connecticut, Massachusetts, Maryland, Maine, New Hampshire, New Jersey, New York, Oregon, Rhode Island, and Vermont) $1,000 cash back on their purchase. GM Financial is also offering lease discounts for a limited time, and trade-ins may be eligible for even more money back. State and federal incentives could add up to make the new Volt quite the bargain for the right customer. Read more at Clean Technica. The UK's potential exit from the European Union could mean tighter emissions regulations, potentially even in the UK. While Britain has fought against the EU on stricter rules, the "Brexit" could leave officials in Brussels free to strengthen air quality laws. The UK, despite giving up its seat at the table, would still be beholden to some rules as a member of the European Economic Area free trade agreement. British voters vote on a referendum to leave the EU on June 23. Read more from Bloomberg Business. Daimler will refrain from investing in battery pack production with other automakers for the time being. Daimler CEO Dieter Zetsche cites an overabundance of battery production, saying, "Contrary to the expectation four or six years ago when everyone thought that the cells would be a rarity that could even be used as a tool of industrial policy, there is de facto a massive overcapacity in the market today and cells have become a commodity." Daimler recently shuttered its own lithium-ion battery production due to high costs and low demand. Read more from Automotive News. Audi is partnering with the Viessmann Group to increase e-gas production using a new biological process. Audi has been making the renewable fuel through a two-part process of electrolysis (splitting water into oxygen and hydrogen) and methanation (reacting hydrogen with CO2 to make synthetic methane). The new biological process uses microoganisms to absorb hydrogen and CO2 to make methane. The process requires lower temperature and pressure, and doesn't require high concentrations or purity of CO2. Read more in the press release below.
























1954 chevy driver
1956 chevrolet belair
1957 chevrolet bel air 2 door hardtop sport coupe project car
1957 chevy bel-air pro-street
1965 chevrolet bel air post 350 4 speed grandma car
1957 chevrolet bel air 2door hard top