Find or Sell Used Cars, Trucks, and SUVs in USA

1999 Cadillac Eldorado Convertible on 2040-cars

US $8,900.00
Year:1999 Mileage:85965
Location:

Mesa, Arizona, United States

Mesa, Arizona, United States
Advertising:

This is a Coach Works power convertible top conversion !! Super clean inside and out the car is in great shape can ship or pick up. Clean title low miles call me at 602-920-6092 if you have any questions. Car is located in Mesa AZ 85202 Can pick you up at the airport Thanks Richard

Cadillac Eldorado for Sale

Auto Services in Arizona

Xtreme Roadside ★★★★★

Auto Repair & Service, Locks & Locksmiths, Keys
Address: 9424 W Jamestown Rd, Cashion
Phone: (623) 680-6941

Xpress Automotive & Wash ★★★★★

Auto Repair & Service
Address: 1436 N Higley Rd, Apache-Jct
Phone: (480) 924-5224

Windshield Replacement & Auto Glass Repair Phoenix ★★★★★

Auto Repair & Service, Windshield Repair, Glass-Auto, Plate, Window, Etc
Address: 1121 N 44th Street, Paradise-Valley
Phone: (602) 235-0353

West Glenn Body Shop ★★★★★

Automobile Body Repairing & Painting
Address: 5218 W Glenn Dr, Glendale-Luke-Afb
Phone: (623) 931-4100

Valley Express Auto Repair ★★★★★

Auto Repair & Service, Automobile Inspection Stations & Services, Automobile Repairing & Service-Equipment & Supplies
Address: 629 W Broadway Rd, El-Mirage
Phone: (480) 630-1279

Valley Express Auto Repair ★★★★★

Auto Repair & Service, Automobile Inspection Stations & Services, Automobile Repairing & Service-Equipment & Supplies
Address: 629 W Broadway Rd, Scottsdale
Phone: (480) 630-1279

Auto blog

GM Super Cruise beats Tesla Autopilot again in latest hands-free test

Wed, Oct 28 2020

DETROIT — General Motors' Super Cruise once again edged Tesla's Autopilot in an evaluation of 17 vehicles equipped with active driving assistance systems (ADAS) by Consumer Reports, the testing organization said on Wednesday. A Tesla Model Y fitted with Autopilot finished "a distant second," the group said, to a Cadillac CT6 equipped with Super Cruise, which GM is rolling out to more than 20 vehicles — including its new Hummer electric pickup truck — over the next three years. Safety and insurance researchers have frequently warned of the risks of consumers overestimating ADAS systems' abilities, a misconception increased by some automakers calling their products Autopilot, ProPilot or Co-Pilot. In 2018, the Cadillac CT6 with Super Cruise scored higher than a Tesla Model 3 with Autopilot, in a Consumer Reports test of just four vehicles equipped with ADAS. In the latest test, conducted this summer on a track and on public roads, the Cadillac scored 69 points out of a possible 100, while the Tesla scored 57. A Lincoln Corsair equipped with Ford's Co-Pilot 360 system, finished third with 52. The critical difference in the Super Cruise system is a driver-facing infrared camera to make sure he or she is paying attention to the road and is ready to take over manual control when necessary, said Kelly Funkhouser, head of connected and automated vehicle testing at Consumer Reports. The group noted that Autopilot can shut off abruptly in some situations, while Super Cruise did a better job of notifying the driver when the system is disengaging. In recent European safety testing, a Tesla Model 3 with Autopilot placed sixth out of 10 systems, getting high marks for performance and ability to respond to emergencies, but falling short on its ability to maintain a driverÂ’s focus on the road. Related Video: Green Cadillac GM Hummer Tesla Safety Technology Autonomous Vehicles Electric Super Cruise

Cadillac finds a few more horsepower for ATS-V

Wed, Mar 25 2015

We've rarely found cause to complain about a car getting more power, and guess what? That's not going to change here. After initially announcing that the new ATS-V would come to market with a Corvette-matching 455 horsepower, Cadillac has come back with an SAE-certified 464 horsepower. That, as Automobile points out, puts the high-performance ATS in spitting distance of the base Mercedes-Benz C63 AMG and its 469 hp. Anyone else feeling bad for owners of the 425-hp BMW M3? While the ATS-V is getting a bit more grunt, somehow, we doubt Cadillac will adjust its previously published performance figures. Expect 60 miles per hour to arrive in 3.9 seconds, with a top speed of 185 mph. As of this writing, a lucky Autoblog staffer is lapping the ATS-V around Circuit of the Americas in Austin as part of the sedan's big launch. So while we can't fill you in on its real-world performance just yet, expect a big update soon. Related Video:

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.