2008 Cadillac Xlr 2dr High Performance Convertible on 2040-cars
Lake Wales, Florida, United States
Cadillac XLR for Sale
Cadillac xlr 1 owner clean(US $31,995.00)
2008 cadillac xlr-v black on black(US $48,000.00)
2007 cadillac xlr base convertible 2-door 4.6l
2006 cadillac xlr base convertible 2-door 4.6l(US $27,500.00)
We finance! 35617 miles 2007 cadillac xlr
2009 cadillac xlr v, hard top convertible, only 18k miles, extra clean! 443 hp(US $52,900.00)
Auto Services in Florida
Y & F Auto Repair Specialists ★★★★★
X-quisite Auto Refinishing ★★★★★
Wilt Engine Services ★★★★★
White Ford Company Inc ★★★★★
Wheels R US ★★★★★
Volkswagen Service By Full Throttle ★★★★★
Auto blog
Cadillac moving to NY as separate business unit
Tue, 23 Sep 2014Cadillac is under new leadership, and the automaker is committed to turning itself (back) into a global luxury powerhouse. It's got a strong product offensive (of products currently in showrooms, and much more on the way), and now it will have a new location to call home.
Following earlier speculation, GM has confirmed that it is moving Cadillac's base of operations from Detroit to New York. Lest you think it might rent offices in the Chrysler Building (which is, after all, one of the tallest in the city), the new Cadillac global headquarters will be located in the Soho area with a "multipurpose brand and event space in conjunction with modern loft offices." The company is still evaluating which staff will move along with it to Manhattan, and which will remain in Michigan where technical operations will still be based.
The move from Detroit to New York is the first major change being instituted by new Cadillac chief Johan de Nysschen, who previously undertook a similar shift in moving Infiniti away from Nissan headquarters to its own facility in Hong Kong. Ford had attempted a similar move in relocating its luxury portfolio under the Premier Automotive Group (which then included Lincoln, Mercury, Land Rover, Jaguar, Aston Martin and Volvo) from Dearborn to Irvine, CA, but ended up moving Lincoln (the last one still under the Ford umbrella) back to Michigan. Other luxury automakers like Audi (Volkswagen) and Maserati (Fiat) are headquartered away from their parent companies as well, but have a longer history of independent operation.
Which electric cars can charge at a Tesla Supercharger?
Sun, Jul 9 2023The difference between Tesla charging and non-Tesla charging. Electrify America; Tesla Tesla's advantage has long been its charging technology and Supercharger network. Now, more and more automakers are switching to Tesla's charging tech. But there are a few things non-Tesla drivers need to know about charging at a Tesla station. A lot has hit the news cycle in recent months with regard to electric car drivers and where they can and can't plug in. The key factor in all of that? Whether automakers switched to Tesla's charging standard. More car companies are shifting to Tesla's charging tech in the hopes of boosting their customers' confidence in going electric. Here's what it boils down to: If you currently drive a Tesla, you can keep charging at Tesla charging locations, which use the company's North American Charging Standard (NACS), which has long served it well. The chargers are thinner, more lightweight and easier to wrangle than other brands. If you currently drive a non-Tesla EV, you have to charge at a non-Tesla charging station like that of Electrify America or EVgo — which use the Combined Charging System (CCS) — unless you stumble upon a Tesla charger already equipped with the Magic Dock adapter. For years, CCS tech dominated EVs from everyone but Tesla. Starting next year, if you drive a non-Tesla EV (from the automakers that have announced they'll make the switch), you'll be able to charge at all Supercharger locations with an adapter. And by 2025, EVs from some automakers won't even need an adaptor. Here's how to charge up, depending on which EV you have: Ford 2021 Ford Mustang Mach-E. Tim Levin/Insider Ford was the earliest traditional automaker to team up with Tesla for its charging tech. Current Ford EV owners — those driving a Ford electric vehicle already fitted with a CCS port — will be able to use a Tesla-developed adapter to access Tesla Superchargers starting in the spring. That means that, if you own a Mustang Mach-E or Ford F-150 Lightning, you will need the adapter in order to use a Tesla station come 2024. But Ford will equip its future EVs with the NACS port starting in 2025 — eliminating the need for any adapter. Owners of new Ford EVs will be able to pull into a Supercharger station and juice up, no problem. General Motors Cadillac Lyriq. Cadillac GM will also allow its EV drivers to plug into Tesla stations.
GM might lose 90-year U.S. sales crown over chip shortage
Sat, Oct 2 2021Automotive News editor Nick Bunkley tweeted on October 1 that according to AutoNews data, General Motors "has been the largest seller of vehicles in the U.S. every year since passing Ford in 1931." With automakers having turned in light car and truck sales data for the first three quarters of 2021, GM's 90-year-run might not reach 91. According to AN figures, Toyota was 80,401 vehicles ahead when the October workday started. Worse, GM is so far behind its historic pace that it might only sell enough light vehicles in the U.S. to match its numbers from 1958. Meanwhile, the New York Times put a few more salient numbers to the pain GM and Toyota are enduring alongside the the rest of the industry. GM sold 33% fewer cars in Q3 2021 than it did in Q3 2019 during the dark days of the pandemic, 446,997 units this year as opposed to 665,192 last year. GM's Q3 2020 was only down 13% on Q3 2019. Over at Toyota, the bottom line showed a 1% gain in Q3 2021 compared to 2020, with 566,005 units moved off dealer lots. The finer numbers show two steps forward and one step back, though; Toyota's September sales were down 22% compared to last year. GM remains optimistic about what's ahead, GM's president of North American operations telling the NYT, "We look forward to a more stable operating environment through the fall." We'd like to see that happen, but we don't know how it happens. The chip shortage said to have been the inciting incident for the current woes isn't over, and not only can no one agree when it will be over, the automakers, chip producers, and U.S. government still can't get on the same page about who needs what and when. Looking away from that for a second shows articles about "No End In Sight" for supply chain disruptions in early September, before China had to start working through power supply constraints, global supply chain workers started warning of a "system collapse," and roughly 500,000 containers sat waiting to be unloaded at Southern California ports — a record number seemingly broken every week. And back to chips, we're told just a few days ago the chip shortage is "worse than we thought."  For now, the NYT wrote that GM dealer inventory is down 40% from June to roughly 129,000 vehicles, and down 84% from the days when dealers would cumulatively keep about 800,000 light vehicles in stock. However, GM just announced it would have almost all of its U.S. facilities back online next week, although some would run at partial capacity.