2014 Cadillac Xts Premium on 2040-cars
15110 Manchester Rd, Ballwin, Missouri, United States
Engine:Gas V6 3.6L/217
Transmission:6-Speed Automatic w/manual shift
VIN (Vehicle Identification Number): 2G61P5S35E9182511
Stock Num: C451040
Make: Cadillac
Model: XTS Premium
Year: 2014
Exterior Color: White Diamond Tricoat
Interior Color: Shale/Cocoa
Options: Drive Type: FWD
Number of Doors: 4 Doors
Mileage: 5
You will be completely satisfied with the whole deal start to finish. Call 877-238-2164 or live chat to speak with our internet department for assistance.
Cadillac SRX for Sale
 2014 cadillac xts platinum(US $64,020.00) 2014 cadillac xts platinum(US $64,020.00)
 2014 cadillac xts platinum(US $64,479.00) 2014 cadillac xts platinum(US $64,479.00)
 2014 cadillac xts premium(US $58,775.00) 2014 cadillac xts premium(US $58,775.00)
 2014 cadillac xts platinum(US $71,505.00) 2014 cadillac xts platinum(US $71,505.00)
 2014 cadillac xts platinum(US $70,280.00) 2014 cadillac xts platinum(US $70,280.00)
 2014 cadillac xts platinum(US $66,565.00) 2014 cadillac xts platinum(US $66,565.00)
Auto Services in Missouri
Western Tire & Auto ★★★★★
Valvoline Instant Oil Change ★★★★★
St Louis Car & Credit ★★★★★
St Louis Auto Parts Co ★★★★★
Specialty Automotive ★★★★★
SL Services Inc ★★★★★
Auto blog
GM, UAW poaching Nissan workers in Tennessee
Tue, Sep 8 2015General Motors and the United Auto Workers are going on a recruitment drive at the Spring Hill factory in Tennessee, and they're hoping to poach some skilled workers from Nissan's nearby plant in Smyrna, TN. The General and the union even bought a billboard advertising for industrial electricians near the Japanese automaker's facility, according to the Daily News Journal. The reason for the billboard was simple. "GM was short of electricians," said Tim Stannard, the president of the UAW local at Spring Hill, to the Daily News Journal. The factory currently builds the Chevrolet Equinox but has a contract to assemble the next generation of Ecotec engines and the Cadillac XT5, which replaces the SRX. Thanks to the $185-million deal, employment there is expected to double by May 2016, according to Stannard, with roughly 1,800 additional union jobs. Beyond just several billboards, GM has job postings online for the Spring Hill plant looking for workers with specific skills. There has already been some interest in the positions among Nissan employees, Stannard indicated. According to a recent study by the Center for Automotive Research, the average GM worker currently makes $58 an hour, including benefits. Comparatively, Nissan pays an average of $42 an hour with benefits. The General's number could change in the coming weeks because its contract with the UAW is about to expire, and higher wages are among the major negotiating points.
Is this the 2014-15 Cadillac Escalade?
Fri, 19 Apr 2013Following the introduction of the redesigned Chevrolet Silverado and GMC Sierra, we're expecting General Motors won't wait too much longer to show off the next-generation fullsize SUVs that share this platform - including the Cadillac Escalade. It's still not clear if the next Escalade will debut for the 2014 or 2015 model years, but Carscoops has what it claims to an exclusive first look of the new Cadillac, revealing a portion of the headlight, front fascia and wheel.
Judging from this small picture, it looks like the Escalade could incorporate styling cues that we've seen on new Cadillac models like the ELR and the 2014 CTS, but that article says that other design details could include tall, vertical taillights similar to the CTS Wagon, staggered-width wheels and a narrower daylight opening for the side windows. The last time we saw the fourth-generation 'Slade back in October in spy shots, the heavy camouflage prevented us from getting an idea of the luxury SUV's appearance, but this image and description gives us something to look forward to. Head on over to Carscoops for more potential information as well as a full rendering from back in January.
Our favorite mid-engine Corvette theories and rumors
Tue, Sep 13 2016The mid-engine Corvette! We just saw blurry photos through the foliage, and are hearts are all aflutter because it means that this car is real. And it's the most " never before" Corvette since 1984. Which leads us to all kinds of wacky theories and speculation. Everybody knows something or heard from a guy. None of those guys (or gals) from GM are talking to Autoblog, to be clear. But that won't stop us from stirring the pot. Let's go over a few point-by-point. The pushrod engine will be replaced by an overhead-cam V8 Car and Driver has repeatedly reported that an overhead-cam engine will come after the mid-engine Corvette's debut with an old-school pushrod. We've heard the same thing firsthand, albeit from a source with no connection to the development of the Corvette or powertrain. "At some point two valves can't pass future emissions regulations," said the guy we know. While the pushrod engine is compact, the design makes it difficult - if not impossible - for sophisticated variable valve timing (and lift) systems that control combustion with more precision. Hasty conclusion: The pushrod engine has a finite life in front of it. This one's a lock, it's a just a matter of when. Bowling Green's new paint shop is really the mid-engine assembly line Credit to Reddit for this one. Like we said, everybody knows a guy. But let's look deeper. The new paint facility costs $439 million dollars and adds 450,000 square feet, almost half the size of the existing plant. Plus GM announced another $290 million in upgrades at Bowling Green Assembly. That sure sounds like a lot of money, but you can actually spend that much on a paint booth. Porsche spent 500 million Euros (about $561 million dollars) to add the Macan assembly to its Leipzig, Germany plant in 2014. Chrysler shelled out $850 million for a paint shop in Sterling Heights, Michigan. GM spent $600 million for a new paint shop at the Fairfax (Kansas City) plant. Honda, on the other hand, is working on a thrifty $210 million project in Marysville, Ohio that includes a 300,000 square foot expansion, and the low-volume Acura NSX facility only cost $70 million. Hasty conclusion: The square footage and cost could easily mean a new assembly line instead of (or in addition to) a paint line. And if the NSX plant was really that cheap, GM could have hidden a similar sum in its existing announcements.

 
										






















