Find or Sell Used Cars, Trucks, and SUVs in USA

1995 Cadillac Deville Base Sedan 4-door 4.9l on 2040-cars

US $2,500.00
Year:1995 Mileage:74100 Color: wear
Location:

Pittsburgh, Pennsylvania, United States

Pittsburgh, Pennsylvania, United States
Advertising:

Up for Sale is a low mileage 1995 Cadillac Deville

Grey exterior, beige micro suede interior

It has power locks, power seats, power truck release, CD player

It is in great running condition

Minor exterior wear, dent on upper front of car right on top on front wheel ( hard to see in pictures) also minor rust 

Car is clean inside, COLD A/C, clean seats, NON-smoker, runs really smooth

Inspected and insured through end of October.

Clean car fax, no accidents, flood or fire damage

You can take to our own mechanic to get checked out if interested before buying, only if YOU pay for that expense 

Selling due to a death in the family

Any questions please ask, I will try to answer as best as I can!!

Auto Services in Pennsylvania

Witmer`s Auto Salvage ★★★★★

Automobile Parts & Supplies, Automobile Salvage, Automobile Parts & Supplies-Used & Rebuilt-Wholesale & Manufacturers
Address: 340 Fickes Rd, Highspire
Phone: (717) 432-3570

West End Sales & Service ★★★★★

Auto Repair & Service
Address: 2746 Walbert Ave, Germansville
Phone: (610) 433-2661

Walter`s Auto Wrecking ★★★★★

New Car Dealers, Automobile Parts & Supplies, Automobile Accessories
Address: Birmingham
Phone: (814) 696-0310

Tony`s Towing ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Automobile Parts & Supplies
Address: Geigertown
Phone: (484) 334-0838

T S E`s Vehicle Acces Inc ★★★★★

Automobile Parts & Supplies, Automobile Accessories
Address: 21 Cloister AVE, Newmanstown
Phone: (717) 738-2225

Supreme Auto Body Works, Inc ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting
Address: 2011 Walbert Ave, Bushkill
Phone: (610) 432-9000

Auto blog

Cadillac recalls ELR coupe over stability control problems

Fri, 28 Mar 2014

Cadillac is recalling about 656 2014 ELR models made between September 26, 2013 and February 14, 2014, because of a fault with the electronic stability control system. On cars without adaptive cruise control, it's possible that diagnostics could prevent the system from telling the driver if ESC is on or off.
Cadillac has a software fix ready and repairs begin on April 17. Alan Adler, General Motors' recall and legal spokesperson, tells Autoblog that only about 55 of the affected cars are in the hands of owners. The rest are either on dealer lots or still at the factory. There have been no reported injuries or crashes caused by the fault.
The correction for the stability control system involves a software recalibration of the electronic brake control module that takes around 20 minutes to perform. While they use the same platform, the Chevrolet Volt isn't involved in this recall because it "uses a different a brake control module," said Adler.

Next-gen Cadillac Escalade debuting October 7 in NYC

Wed, 14 Aug 2013

Cadillac will unveil the next Escalade in October, at an event in New York City. It will be the sole member of GM's large SUV family to not get a debut at the Texas State Fair, which we don't think is all that surprising, considering the kind of clientele attracted by the big Caddy.
The new truck, from the few teaser images and spy shots we've seen, has evolved with the rest of the Cadillac range. We've got a glimpse of its tall, thin headlights, which look like an evolution of what's on the current truck. Expect some kind of egg-crate grille, reminiscent of the new CTS and ATS, while Cadillac's CUE system should feature heavily in what we hope is a thoroughly revised cabin.
The event takes place on October 7, so check back then for more info on the all-new Escalade.

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.