Find or Sell Used Cars, Trucks, and SUVs in USA

Beautiful 2004 Volkswagen Touareg V8 Sport Utility 4-door 4.2l Burgundy Color on 2040-cars

US $6,900.00
Year:2004 Mileage:86583
Location:

South River, New Jersey, United States

South River, New Jersey, United States
Advertising:

Auto Services in New Jersey

Venango Auto Service ★★★★★

Auto Repair & Service
Address: 2633 E Venango St, Edgewater-Park
Phone: (215) 634-7266

Twins Auto Repair Ii ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Automobile Accessories
Address: 1204 Flushing Ave, Bloomfield
Phone: (718) 381-5959

Transmission Surgery & Auto Repair LLC ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Auto Transmission
Address: 1350 Ralph Ave Brooklyn Ny, West-New-York
Phone: (888) 753-0304

Tg Auto (Dba) Tj Auto ★★★★★

Used Car Dealers
Address: 1068 60th St, North-Middletown
Phone: (718) 686-8848

Szabo Signs ★★★★★

Automobile Body Repairing & Painting, Truck Painting & Lettering, Advertising Specialties
Address: 1108 Neck Rd, New-Lisbon
Phone: (609) 387-7213

Stuttgart German Car Service ★★★★★

Auto Repair & Service
Address: 1716 Route 206, Medford-Lakes
Phone: (609) 859-9050

Auto blog

Audi's Project Artemis woes could delay range of VW Group EVs

Tue, Jul 19 2022

Two years ago, Audi's then new CEO Markus Duesmann announced his first big initiative called Project Artemis. The plan's marquee component is "to implement a new lighthouse project for Audi in record time," being "a highly efficient electric car scheduled to be on the road as early as 2024" on a brand new platform that would be shared with Porsche and Bentley. An ex-VW and -Porsche man named Alex Hitzinger, who'd also spent time at Apple working on the tech company's electric car, was brought on board to lead Project Artemis and come up with new ideas. Parent Volkswagen Group said it wanted to become "as agile as in a racing team," removing the bureaucratic molasses and bottlenecks interfering with getting the best product on the road in the best time. However, in any grand venture, failure comes before success. Automobilwoche reports that Artemis is struggling through issues large enough to push the product plans back by years. The issue, as it was with the ID.3 lineup on the eve of that car's launch, is software. Well, that's the latest, largest problem; Artemis has already been through copious struggles before getting to the software bit. Two months after Hitzinger came on, in December 2020, VW raised its EV volume target from 50% to 70% by 2030. That necessitated a rethink of the VW Group's entire platform strategy considering the far greater production scale. Hitzinger only lasted six months in the job, ousted in May 2021, supposedly because Audi believed his ideas were "not suitable for profitable series production" among other reasons. By that time, the pace of software development was already said to be six months behind schedule, with the Car.Software division working on VW.OS 2.0 "not yet running at the speed hoped for." Internal frictions were noteworthy and costly as well. VW's commercial division plant in Hanover was meant to build Artemis vehicles for Audi, Porsche and Bentley, but Automobilwoche reported in January of this year that Porsche paid a ""small three-digit million amount" — like $100 million or so — to get out of the deal mandating its vehicles come from the Hanover facility.    So Audi effectively brought Artemis in-house to lead vehicle development, and Car.Software turned into Cariad to get VW.OS and VW.AC, which stands for Automotive Cloud, to market.  The first Audi vehicle under Project Artemis was planned to arrive by the end of 2024, a production version of the Grandsphere concept.

Volkswagen could build plug-in hybrids in China

Sun, Apr 6 2014

When you're Europe's largest automaker and your largest global market happens to be the one most notorious for its pollution (China), some solutions just present themselves. Volkswagen may be heeding that call. During the upcoming Beijing Motor Show, the company is expected to announce plans to produce plug-in hybrid electric vehicles in China, Reuters says, citing sources within the company. Few details have emerged, though the plug-ins will likely be produced at VW's Foshan factory in South China, which currently makes the Golf and Audi A3 and has plans to eventually make 600,000 vehicles annually. News has been percolating for a while, as Oliver Schmidt, general manager engineering and environmental office for Volkswagen Group of America, said last March that the company was planning at least two plug-in hybrid lines under the VW badge (and another three with its Audi and Porsche affiliates), including possibly a Touareg and Jetta PHEV. VW said late last month that it was looking to speed up development of "particularly eco-friendly models" made by Shanghai Volkswagen as well as developing a "new, very eco-friendly vehicle" with First Automotive Works (FAW). Earlier this year, VW unveiled its Golf GTE plug-in hybrid at the Geneva Motor Show. That model has a 1.4-liter turbocharged four-cylinder engine and an electric motor to provide 201 horsepower and 258 pound-feet of torque. The car can travel as many as 81 miles on electric power alone.

Which electric cars can charge at a Tesla Supercharger?

Sun, Jul 9 2023

The difference between Tesla charging and non-Tesla charging. Electrify America; Tesla Tesla's advantage has long been its charging technology and Supercharger network. Now, more and more automakers are switching to Tesla's charging tech. But there are a few things non-Tesla drivers need to know about charging at a Tesla station. A lot has hit the news cycle in recent months with regard to electric car drivers and where they can and can't plug in. The key factor in all of that? Whether automakers switched to Tesla's charging standard. More car companies are shifting to Tesla's charging tech in the hopes of boosting their customers' confidence in going electric.  Here's what it boils down to: If you currently drive a Tesla, you can keep charging at Tesla charging locations, which use the company's North American Charging Standard (NACS), which has long served it well. The chargers are thinner, more lightweight and easier to wrangle than other brands.  If you currently drive a non-Tesla EV, you have to charge at a non-Tesla charging station like that of Electrify America or EVgo — which use the Combined Charging System (CCS) — unless you stumble upon a Tesla charger already equipped with the Magic Dock adapter. For years, CCS tech dominated EVs from everyone but Tesla.  Starting next year, if you drive a non-Tesla EV (from the automakers that have announced they'll make the switch), you'll be able to charge at all Supercharger locations with an adapter. And by 2025, EVs from some automakers won't even need an adaptor.  Here's how to charge up, depending on which EV you have:  Ford 2021 Ford Mustang Mach-E. Tim Levin/Insider Ford was the earliest traditional automaker to team up with Tesla for its charging tech. Current Ford EV owners — those driving a Ford electric vehicle already fitted with a CCS port — will be able to use a Tesla-developed adapter to access Tesla Superchargers starting in the spring. That means that, if you own a Mustang Mach-E or Ford F-150 Lightning, you will need the adapter in order to use a Tesla station come 2024. But Ford will equip its future EVs with the NACS port starting in 2025 — eliminating the need for any adapter. Owners of new Ford EVs will be able to pull into a Supercharger station and juice up, no problem. General Motors Cadillac Lyriq. Cadillac GM will also allow its EV drivers to plug into Tesla stations.