1988 Toyota Supra Non Turbo on 2040-cars
Antioch, Tennessee, United States
Vehicle Title:Clear
Engine:7mge
Fuel Type:GAS
For Sale By:Private Seller
Transmission:Manual
Make: Toyota
Model: Supra
Options: CD Player
Power Options: Cruise Control, Power Locks, Power Windows, Power Seats
Drive Type: RWD
Mileage: 145,519
Sub Model: supra
Disability Equipped: No
Exterior Color: Red
Number of Doors: 2
Interior Color: Gray
Warranty: Vehicle does NOT have an existing warranty
Number of Cylinders: 6
Trim: base
Toyota Supra for Sale
- Toyota supra 2jz gte mkiii, 2jzgte, supra, rx7, gtr, fast, with pics
- 1989 toyota supra base targa - turbo conversion(US $3,500.00)
- Toyota supra mkiv(US $17,995.00)
- 1988 toyota supra base hatchback 2-door 3.0l automatic removable top dohc
- 1987 toyota supra turbo hatchback 2-door 3.0l
- Rhd japanese-spec 3.0l na with getrag 6-speed, tt clutch & lsd
Auto Services in Tennessee
White`s Towing & Recovery ★★★★★
Universal Kia Franklin ★★★★★
United Auto Service ★★★★★
Transmissions INC ★★★★★
The Wash Spot Inc ★★★★★
Solar Pros Window Tinting ★★★★★
Auto blog
Toyota to ramp up Tacoma production in Mexico by 41%
Sun, 21 Sep 2014The Toyota Tacoma may be getting on in age, but that isn't stopping the Japanese manufacturer from ramping up production at the pickup's Baja California factory. The Mexican plant will soon be home to another 300 jobs as it increases total capacity by 41 percent. The increase is slated for April 2015.
The move is a curious one, considering the Tacoma's age and the fact that General Motors is preparing what, on the surface, appear to be two very competent challengers. The factory increase could be in preparation for the 2016 Taco (spy photos shown above), which is expected to represent a significant overhaul of the long-serving truck.
Toyota's decision to increase capacity could also be due to the factory building freeze implemented by President Akio Toyoda, according to Automotive News. Toyoda put a hold on new factories until 2016, asking executives to squeeze as much production as possible out of remaining factories before bringing any additional facilities online.
Judge halts Toyota unintended acceleration cases, triggers time for settlement negotiations
Mon, 16 Dec 2013So far, the lawsuits brought forth against Toyota for unintended acceleration have gone both ways: the automaker was found not at fault in a 2009 California crash and liable for a 2007 crash in Oklahoma. Both cases involved a Camry and resulted in fatalities. With a big chunk of these UA cases (around 200) set to his the docket of US District Judge James V. Selna in Santa Ana, California, Bloomberg is reporting that the judge has halted the lawsuits until March after Toyota and its lawyers have had extra time to try and settle the cases.
According to the article, Toyota is looking to take care of the cases out of court with an "intensive settlement process." Having already paid out $1.6 billion in "economic loss" suits, this latest settlement process is aimed at the wrongful death and personal injury cases allegedly associated with unintended acceleration. A hearing for the settlements will be held on January 14 with conferences on the matter commencing in February. There is no word as to when lawsuits may start back up if settlements can't be agreed upon.
Toyota temporarily idles pair of Indian plants due to labor unrest
Thu, 20 Mar 2014The Detroit News reported today that Toyota will restart production at two Indian plants, following a shutdown on Monday.
Factory labor, management and police in Asia engage in the kind of violent altercations that we're not used to, having almost entirely walked away from the overtly brutal relations epitomized by the Pinkerton Detective Agency and the Flint Sit-Down Strike. In India, a plant owned by a Ford transmission supplier plant was shut down in 2009 after incidents between workers and armed men around the same time as Ssangyong workers occupied a factory in South Korea, in 2012 Suzuki Maruti workers rioted over wages around the same time upset employees beat a ceramics factory president to death in retaliation for a labor leader's killing.
Toyota is the latest to company trying to avoid that road. The Detroit Free Press reported earlier this week that it shut down two plants in India after 11 months of acrimonious wage negotiations and arbitration have gone nowhere. Toyota said the plant workers in Bidadi, near Bangalore, had deliberately stopped production at times over the past 45 days and threatened management. The workers said they wanted their wages raised by an amount already agreed to by management, but that management had reneged; news reports weren't clear on the amount, some saying nearly 10,000 rupees ($165 US) more per month, another saying 4,000 rupees ($65 US), but reports agree that Toyota has said it will only go as high as 3,050 rupees ($50 US).