Find or Sell Used Cars, Trucks, and SUVs in USA

2022 Ram 1500 Trx on 2040-cars

US $83,650.00
Year:2022 Mileage:30458 Color: Mojave Sand Clearcoat /
 Black
Location:

Greensboro, North Carolina, United States

Greensboro, North Carolina, United States
Advertising:
Vehicle Title:Clean
Engine:6.2L Supercharged HEMI V8 SRT
Fuel Type:Gasoline
Body Type:4D Crew Cab
Transmission:Automatic
For Sale By:Dealer
Year: 2022
VIN (Vehicle Identification Number): 1C6SRFU95NN389990
Mileage: 30458
Make: Ram
Trim: TRX
Features: --
Power Options: --
Exterior Color: Mojave Sand Clearcoat
Interior Color: Black
Warranty: Unspecified
Model: 1500
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. See all condition definitions

Auto Services in North Carolina

Ward`s Automotive Ctr ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Auto Transmission
Address: 11 Price Rd, Linwood
Phone: (336) 242-1464

Usa Auto Body ★★★★★

Automobile Body Repairing & Painting
Address: 810 Loop Rd, Clayton
Phone: (919) 553-4999

Unique Auto Sales ★★★★★

New Car Dealers, Used Car Dealers, Wholesale Used Car Dealers
Address: 3815 High Point Rd, Climax
Phone: (336) 553-1652

True2Form Collision Repair Centers ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting
Address: 8813 Ice Dr, Raleigh
Phone: (919) 781-3420

Triple A Automotive Towing & Recovery Services Inc. ★★★★★

Auto Repair & Service, Towing, Septic Tank & System Cleaning
Address: 628 Dunn Road, Proctorville
Phone: (910) 483-8818

Triangle Automotive Repair, Inc ★★★★★

Auto Repair & Service, Auto Oil & Lube, Truck Service & Repair
Address: 1404 Brown Ave, Franklin
Phone: (828) 246-9226

Auto blog

Ram ramping up MI truck production, does deal with Texas Rangers

Fri, 26 Sep 2014

Thanks to a host of upgrades at the Warren Truck Assembly Plant in Michgan, Ram Trucks is boosting production of the already strong-selling Ram 1500 to build 28,585 more of them a year. That works out roughly to five more per hour, or an additional 100 per day. The major key to the improvements was redesigning 353 assembly workstations to allow employees complete their tasks more efficiently. According to Ram, the expansion was done to meet growing demand for the pickup.
These kinds of comprehensive changes can't happen over night, obviously. From the end of 2013 through the summer shutdown in August, the Warren Truck plant received automation tweaks in the body shop and upgrades to the color booths in the paint shop.
However, the biggest shift was working with "UAW-represented team leaders and operators" to examine every workstation for efficiency improvements. In that analysis, the company identified and altered over 100 problems that could have caused an injury. What really helped to boost the production rate so significantly was moving about 300 parts, or grouping them into kits for better ergonomics, and eliminating walks to grab tools. Once everything was done, about 63 percent of workers at the factory got updated training.

Chrysler recalling nearly 141k vehicles over electrical woes

Wed, 02 Oct 2013

Software glitches that randomly illuminate warning lights and cause instrument cluster blackouts are forcing Chrysler to recall 140,800 vehicles, The Detroit News reports. The automaker is recalling 132,000 2014 Jeep Grand Cherokees, 91,559 of which are in the US. In addition to the Jeep recalls, Chrysler is adding 10,800 2014 Ram 1500, 2500 and 3500 trucks to the list for similar problems.
Chrysler reportedly says, "Both events occurred infrequently and appeared to resolve themselves by tuning the vehicle's ignition off and then on."
Engineers discovered a problem with the anti-lock-braking system software that causes the instrument cluster display of the Grand Cherokee to illuminate warning lights and black out - even its ABS and electronic stability control systems are affected. To fix the Jeeps, Chrysler will update the vehicle's software.

Huge, pricey trucks haul jobs and profits for the Detroit Three

Tue, Feb 5 2019

DECATUR, Texas — Mickey McMaster is on his 12th pickup truck. The 61-year old farm equipment dealer in Decatur, Texas, two weeks ago treated himself to a 2019 GMC Denali for around $69,000 — a reward for long hours at work. "For me this is the Cadillac of trucks, it's a real luxury vehicle," McMaster said. "I've worked my way up to afford a truck like this and it shows that I've earned it." McMaster is the kind of customer General Motors Co is banking on as it plans to add 1,000 jobs at a plant in Flint, Michigan that will build a new generation of its largest pickups. Demand from Texas and other heartland states for big pick-ups is providing a lifeline to many workers the No. 1 U.S. automaker is laying off at plants elsewhere. The Detroit Three automakers and thousands of their U.S. workers are counting on customers like McMaster to keep buying bigger and more luxurious pickup trucks even if overall U.S. vehicle demand weakens this year, as most analysts predict. At Flint, GM will build a new generation of its heavy-duty Chevrolet Silverado and GMC Sierras, including luxury models that are some of the most profitable vehicles on the planet. GM, Ford Motor Co and Fiat Chrysler Automobiles NV's Ram division own the segment and are each doubling down with new or redesigned models launching this year. Sales of heavy-duty pickups in the United States have grown to more than 600,000 vehicles a year, up more than 20 percent since 2013, according to industry data. Prices for luxury models can easily top $70,000. GM on Tuesday celebrated the launch of a new generation of heavy-duty GMC and Chevrolet pickups at the assembly plant in Flint, Michigan, that is now building all such trucks for the company. At the same time that GM is laying off thousands of U.S. workers and planning to shutter five North American factories, Flint is hiring. The plant runs on three daily shifts, six days a week. As the new model's assembly system ramps up, the plant's capacity will increase by more than 25 percent, plant manager Mike Perez told Reuters. The Flint plant plans to add 1,000 workers, more than half of the 1,500 factory workers who have asked to transfer from plants GM has targeted for shutdown as part of CEO Mary Barra's restructuring plan. "We're bringing in 50 to 100 people every week," said Perez. Workers last week were still finishing the job of retooling the Flint factory to build the new heavy-duty trucks as part of a $1.5 billion investment project.