Find or Sell Used Cars, Trucks, and SUVs in USA

2004 Jeep Grand Cherokee Laredo Sport Utility 4-door 4.0l on 2040-cars

US $4,500.00
Year:2004 Mileage:125000
Location:

Boston, Massachusetts, United States

Boston, Massachusetts, United States
Advertising:

front fender damage and dent in bumpers

Auto Services in Massachusetts

Wilson S Service Center ★★★★★

Auto Repair & Service
Address: 455 Main St, Carlisle
Phone: (978) 448-0333

Wentworth Service Station ★★★★★

Auto Repair & Service, Gas Stations
Address: 50 Stedman St, Lexington
Phone: (617) 524-3713

Urban Auto Body ★★★★★

Auto Repair & Service, Dent Removal
Address: 92 Harbor St, Revere
Phone: (781) 593-9203

T Tires ★★★★★

Auto Repair & Service, Automobile Parts, Supplies & Accessories-Wholesale & Manufacturers, Tires-Wholesale & Manufacturers
Address: 142 Canal St., Wenham
Phone: (978) 219-3905

Riverside Imports ★★★★★

Auto Repair & Service
Address: 1095 Main St, Charlton-Depot
Phone: (508) 795-1771

Ralph`s Auto Center ★★★★★

New Car Dealers, Used Car Dealers
Address: 867 Church St, West-Wareham
Phone: (508) 998-1141

Auto blog

FCA to invest $4.5B for new Detroit plant, expanded production at current facilities

Tue, Feb 26 2019

We expected some shifts in manufacturing plans as Fiat Chrysler plans to begin electrifying its Jeep brand, but this news bodes well for Michigan. FCA announced today that it would spend $4.5 billion to expand production in the state, including building a new assembly plant in Detroit and increasing capacity at five other facilities in the state. The plan, which FCA says will create nearly 6,500 new jobs, will help to meet increasing demand for Ram and Jeep products, and to electrify Jeep models. $1.6 billion will be set aside to transform the Mack Avenue Engine Complex into a site to build the next generation of Jeep Grand Cherokee, as well as an unspecified, new three-row Jeep model. FCA says this part of the plan will create 3,850 new jobs. FCA is increasing its investment in the Warren Truck plant to $1.5 billion in order to continue building the Ram 1500 Classic, as well as the new Jeep Wagoneer and Grand Wagoneer, creating 1,400 new jobs. FCA says that the new Ram 1500 Heavy Duty will still be built in Saltillo, Mexico. At FCA's Jefferson North facility, the automaker will invest $900 million to upgrade the plant. This site will continue to build the Dodge Durango, as well help build the next Jeep Grand Cherokee. FCA expects this to create 1,100 new jobs. As Jeep plans to electrify models in its SUV lineup, each of the above plants will produce plug-in hybrid versions of the Jeep models produced there, "with flexibility to build fully battery-electric models in the future," the company said in its announcement. "Three years ago, FCA set a course to grow our profitability based on the strength of the Jeep and Ram brands by realigning our U.S. manufacturing operations," said FCA CEO Mike Manley, referring in part to earlier investments in Illinois, Ohio and Michigan. "Today's announcement represents the next step in that strategy," Manley continued. "It allows Jeep to enter two white space segments that offer significant margin opportunities and will enable new electrified Jeep products, including at least four plug-in hybrid vehicles and the flexibility to produce fully battery-electric vehicles." Other investments include $119 million to move production of the 3.0-, 3.2- and 3.6-liter Pentastar engines from Mack I to the Dundee Engine Plant, and $400 million for increased capacity and 80 new jobs at the Sterling and Warren stamping plants. This comes at a time when FCA's U.S.

Driving the 2025 Genesis GV80 Coupe and Ford Explorer | Autoblog Podcast #844

Fri, Aug 16 2024

In this episode of the Autoblog Podcast, Editor-in-Chief Greg Migliore is joined by Senior Editor, Electric, John Beltz Snyder. John recently attended the launch of both the 2025 Genesis GV80 Coupe and the 2025 Ford Explorer. In the fleet, we've been driving the Jeep Gladiator, BMW 5 Series and Chrysler Pacifica Plug-In Hybrid. In the news, Nissan has updated the Frontier for 2025, while the 2025 Toyota GR Corolla gets an available automatic transmission. Send us your questions for the Mailbag and Spend My Money at: Podcast@Autoblog.com. Autoblog Podcast #844     Get The Podcast Apple Podcasts – Subscribe to the Autoblog Podcast in iTunes Spotify – Subscribe to the Autoblog Podcast on Spotify RSS – Add the Autoblog Podcast feed to your RSS aggregator MP3 – Download the MP3 directly Rundown Cars we're driving 2025 Genesis GV80 Coupe 2025 Ford Explorer 2024 Jeep Gladiator 2024 BMW 530i xDrive 2024 Chrysler Pacifica Plug-In Hybrid 2025 Nissan Frontier gets a suite of meaningful upgrades 2025 Toyota GR Corolla gets available automatic transmission Feedback Email – Podcast@Autoblog.com Review the show on Apple Podcasts Autoblog is now live on your smart speakers and voice assistants with the audio Autoblog Daily Digest. Say “Hey Google, play the news from Autoblog” or "Alexa, open Autoblog" to get your favorite car website in audio form every day. A narrator will take you through the biggest stories or break down one of our comprehensive test drives. Related Video:  2025 Explorer SUV interior review This content is hosted by a third party. To view it, please update your privacy preferences. Manage Settings.

FCA plants skipping summer shutdown to keep up with demand

Thu, May 14 2015

Hopefully, some FCA US factory employees don't have big plans for the usual summer shutdown, because the automaker is keeping several plants running this year. Demand is so high that the company wants to keep models rolling off the assembly lines. Four FCA US assembly plants, all the engine factories, and some locations that build transmissions are staying open throughout the summer, according to the Detroit Free Press. Usually, these sites would see a two-week shutdown for the company to retool and perform repairs. This year, factories are staying open for FCA to support its strong sales. The lines that remaining humming through the summer show an inclination toward the automaker's popular SUV's and crossovers. They include the Jefferson North Assembly Plant in Michigan that builds the Jeep Grand Cherokee and Dodge Durango; Saltillo Van Assembly in Mexico that constructs the Ram ProMaster; Toledo Assembly Complex in Ohio that produces the Cherokee and Wrangler; and Toluca Assembly in Mexico that makes the Dodge Journey and Fiat 500. Related Video: News Source: The Detroit Free PressImage Credit: Bill Pugliano / Getty Images Plants/Manufacturing Dodge Fiat Jeep RAM FCA dodge journey fca us ram promaster Jefferson North Assembly Plant