1969 Shelby Cobra on 2040-cars
Austin, Texas, United States
Shelby Gt 350 for sale. This is a very pretty restored Shelby it was completed in 2014, it was sold new in Belgium
in 1969 and sold to Sweden in 1979, I bought it in the year 2000 and has taken a total restoration on it, this is a
matching number car original engine and FMX gearbox new brakes new steering gear new suspension new brake line new
fuel line very much new see pictures and send mail for more info.
Ford Mustang for Sale
1966 ford mustang base(US $13,300.00)
2011 ford mustang gt500(US $20,300.00)
1965 ford mustang fastback(US $19,319.00)
1966 ford mustang pony inerior(US $21,700.00)
1969 ford mustang mach 1(US $19,040.00)
2017 ford mustang(US $24,430.00)
Auto Services in Texas
Yos Auto Repair ★★★★★
Yarubb Enterprise ★★★★★
WEW Auto Repair Inc ★★★★★
Welsh Collision Center ★★★★★
Ward`s Mobile Auto Repair ★★★★★
Walnut Automotive ★★★★★
Auto blog
Ford extends shutdown, Stellantis confirms layoffs due to chip shortage
Thu, Apr 22 2021Ford and Stellantis this week announced new production cuts due to the global semiconductor shortage, with popular models including the Ford F-150 and Jeep Grand Cherokee facing cuts. Stellantis plans to temporarily lay off workers at one facility as production is curtailed. According to Automotive News, Ford is extending shutdowns at some of its North American facilities into May. The Blue Oval has been forced to reduce or idle production of both its redesigned F-150 pickup and the popular Explorer due to the chip shortage. The Mustang, Transit, Edge, Lincoln Nautilus and Aviator will also continue to be affected. Stellantis is planning to temporarily lay off workers at a Jeep plant in Detroit during April and May due to a shortage of semiconductor chips. The company will cut two work crews at its Jefferson North plant in Detroit for three weeks starting April 26, then call them back and lay off a third crew from May 17 through the week of May 31, according to a schedule obtained by Bloomberg News. The plant on Detroit’s east side normally operates two shifts with three work crews six days a week to keep it running 20 hours a day. “Stellantis continues to work closely with our suppliers to mitigate the manufacturing impacts caused by the various supply chain issues facing our industry,” company spokeswoman Jodi Tinson said in a statement. “Due to the unprecedented global microchip shortage, Jefferson North will adjust its production schedule through the end of May.” Jefferson North employs about 4,800 hourly workers and makes the Jeep Grand Cherokee, the top-selling Jeep model last year, and the Dodge Durango SUV. A redesigned version of the Grand Cherokee is scheduled to start production in August, according to researcher AutoForecast Solutions. This article contains reporting from Bloomberg. Plants/Manufacturing Ford Jeep Lincoln Technology chip shortage
A tribute to William Clay Ford
Tue, 11 Mar 2014The passing of William Clay Ford has been a big event for the company he spent most of his life helping run. Ford spent 57 years working for his family's company. Considering the Blue Oval has been around for over 100 years, WCF's passing is the end of an era for the Dearborn-based manufacturer.
Ford's YouTube channel has issued a short memorial video highlighting the life of the longest-lived grandson of company founder Henry Ford. It follows William Clay from his time as a boy, showing him alongside his grandfather, through his younger years, and into his twilight, as the patriarch of the Ford family.
Take a look below for this touching memorial video on William Clay Ford.
Watch as U.S. auto industry springs back to life after lockdown
Tue, May 19 2020WARREN, Michigan — The Detroit Three automakers and their suppliers began restarting assembly lines on Monday after a two-month coronavirus lockdown in a slow revival of a sector that employs nearly 1 million people in the United States. On a chilly and damp Monday morning, hundreds of workers at Fiat Chrysler Automobile's (FCA) truck plant in Warren, Michigan, began lining up before 4 a.m. to start the 5 a.m. shift. Signs overhead read: "Let's restart." "I'm a little nervous," said Larry Smith, 53, of New Baltimore, who works on wheel alignment away from the assembly line. "They made all the precautions (and) they've done everything they can to prepare us ... I'm trusting in God." Detroit automakers on Monday said there were no issues with absenteeism as the plants opened. FCA reopened four U.S. assembly plants on Monday, including Warren Truck, on a single shift, as well as four parts plants. The reopening of car plants will be a closely watched test of whether workers across a range of U.S. industries can return to factories in large numbers without a resurgence of infections. General Motors Co, Ford Motor Co and FCA have all been preparing for weeks to reopen their North American factories in a push to restart work in an industry that accounts for about 6% of U.S. economic activity. Investors welcomed the gradual restart, sending GM's shares up more than 9% on Monday. FCA shares rose 7.3%, while Ford's were up 6.7%. Auto companies have redesigned assembly lines and retrained workers in an effort to avoid coronavirus outbreaks that could derail production again. Workers entering factories on Monday were checked by temperature monitors. Face masks or shields are standard protective equipment. Jobs such as installing seat belts that used to require two or more workers to get close together inside a vehicle have been redesigned to keep people a safe distance apart. Plastic screens have been installed along assembly lines to separate workers leaning in to the engine compartments of vehicles. Break areas have been reconfigured to keep workers six feet apart. The Detroit automakers have collaborated with each other and with the United Auto Workers to develop common coronavirus safety practices. Other automakers in the United States are adopting similar safety measures.


