2010 Ford Fusion Sport Sedan 4-door 3.5l on 2040-cars
Melvindale, Michigan, United States
Body Type:Sedan
Vehicle Title:Rebuilt, Rebuildable & Reconstructed
Engine:3.5L 3496CC 213Cu. In. V6 GAS DOHC Naturally Aspirated
Fuel Type:GAS
For Sale By:Dealer
Make: Ford
Model: Fusion
Trim: Sport Sedan 4-Door
Options: SYNC SYSTEM, RDS SYSTEM, SATELLITE RADIO, BLUE TOOTH, BACK UP CAMERA, REAR BUMPER SENSORS, MIRROR SENSORS, Sunroof, 4-Wheel Drive, Leather Seats, CD Player
Safety Features: TRACTION CONTROL, CHILD DOOR LOCK, DRIVER / PASSANGER SEATS AIRBAG, Anti-Lock Brakes, Driver Airbag, Passenger Airbag, Side Airbags
Drive Type: AWD
Power Options: HEATED SEATS, POWER STEERING, Air Conditioning, Cruise Control, Power Locks, Power Windows, Power Seats
Mileage: 50,127
Sub Model: SPORT
Exterior Color: Black
Warranty: 6 MONTH / 6K MILES ON POWER TRAIN INCLUDED
Interior Color: Black
Number of Doors: 4
Number of Cylinders: 6
Ford Fusion for Sale
2010 ford fusion se sedan 4-door 3.0l
2011 sel used 2.5l i4 16v automatic fwd sedan
We finance !!! red ! comfort ! economy ! inexpensive !
Hybrid hybrid-electric new 2.5l cd 50 state emission system front wheel drive(US $21,750.00)
2011 ford fusion hybrid--41mpg city---36mpg hwy---(US $20,800.00)
2011 ford fusion hybrid used
Auto Services in Michigan
Waterford Collision Inc ★★★★★
Varney`s Automotive Parts ★★★★★
Tuffy Auto Service Centers ★★★★★
Tuffy Auto Service Centers ★★★★★
Tri County Motors ★★★★★
The Brake Shop ★★★★★
Auto blog
Ford extends shutdown, Stellantis confirms layoffs due to chip shortage
Thu, Apr 22 2021Ford and Stellantis this week announced new production cuts due to the global semiconductor shortage, with popular models including the Ford F-150 and Jeep Grand Cherokee facing cuts. Stellantis plans to temporarily lay off workers at one facility as production is curtailed. According to Automotive News, Ford is extending shutdowns at some of its North American facilities into May. The Blue Oval has been forced to reduce or idle production of both its redesigned F-150 pickup and the popular Explorer due to the chip shortage. The Mustang, Transit, Edge, Lincoln Nautilus and Aviator will also continue to be affected. Stellantis is planning to temporarily lay off workers at a Jeep plant in Detroit during April and May due to a shortage of semiconductor chips. The company will cut two work crews at its Jefferson North plant in Detroit for three weeks starting April 26, then call them back and lay off a third crew from May 17 through the week of May 31, according to a schedule obtained by Bloomberg News. The plant on Detroit’s east side normally operates two shifts with three work crews six days a week to keep it running 20 hours a day. “Stellantis continues to work closely with our suppliers to mitigate the manufacturing impacts caused by the various supply chain issues facing our industry,” company spokeswoman Jodi Tinson said in a statement. “Due to the unprecedented global microchip shortage, Jefferson North will adjust its production schedule through the end of May.” Jefferson North employs about 4,800 hourly workers and makes the Jeep Grand Cherokee, the top-selling Jeep model last year, and the Dodge Durango SUV. A redesigned version of the Grand Cherokee is scheduled to start production in August, according to researcher AutoForecast Solutions. This article contains reporting from Bloomberg. Plants/Manufacturing Ford Jeep Lincoln Technology chip shortage
Blue Oval's new Cargo cab-over rig is largest "One Ford" initiative yet
Thu, 24 Jan 2013The imposing commercial truck above has a feature that might be surprising to most Autoblog readers - a Blue Oval emblem on the front. Here in North America, Ford simply doesn't play in the eighteen-wheeler sandbox, but that doesn't mean that the Dearborn-based automaker is absent in the heavy hauling space in other parts of the globe. In fact, Ford presently fields two completely different big rig ranges under the Cargo moniker - one a product of an Eastern Europe/Turkey joint venture, and another from Brazil. But that's about to start changing with the advent of this new cab-over model seen here.
Unveiled in São Paulo, Brazil, this new generation of Cargo is perhaps the largest physical embodiment of CEO Alan Mulally's "One Ford" global streamlining strategy. Instead of multiple models, company engineers have developed a new single truck that it says will better meet the needs of truckers in all markets. Designed to compete in what's known as the "extra heavy-duty segment" elsewhere in the world, this Cargo was developed jointly by Ford engineering teams in Brazil, Turkey and Europe.
Specifics remain hard to come by (read: unreleased), but Ford is promising an all-new engine enabling hauling capability of up to 56 tons while still returning excellent fuel economy. Ford's global Cargo lineup will henceforth consist of a dozen models, but Ford tells Autoblog has no plans to bring this hot and heavy-duty action to North America.
Ford adding second supplier for F-150 frames
Mon, Aug 10 2015Metalsa, the company that builds steel frames for the aluminum-bodied Ford F-150, is still having trouble providing enough frames to supply the two factories that build the pickup. The snafu is preventing Ford from selling as many of the country's best-selling truck as it could, and eating into profits - even though the bottom line is still breaking company records. According to The Wall Street Journal, Ford has picked Michigan company Tower International as a second frame supplier and expects to have inventory up to a proper level at the beginning of Q4 of this year. Neither Ford nor Tower would confirm the development - Automotive News got comments from a source and pieced together bits of info from Tower's financial statements and local press reports. Tower currently builds body structures for several vehicles, including the F-series, and the Bellevue, Ohio factory that will build F-150 frames previously manufactured frames for the Ranger and Econoline. According to a story in the local Sandusky Register, Tower will add one production line at the end of next month to begin shipping frames in October, and another line in April 2016. Something like 138 full-time workers and 364 robots are expected to carry out the work. Tower's most recent financial statement said that capital investment will be necessary to get everything set up, but the contract will be worth $140 million in yearly revenue.




















