Find or Sell Used Cars, Trucks, and SUVs in USA

2014 Ford F150 on 2040-cars

US $69,981.00
Year:2014 Mileage:10 Color: Yellow /
 Black
Location:

4676 Route 152 South, Lavalette, West Virginia, United States

4676 Route 152 South, Lavalette, West Virginia, United States
Advertising:
Fuel Type:Unknown
Engine:Regular Unleaded V-8 5.0 L/302
Condition: New
VIN (Vehicle Identification Number): 1FTFW1EF1EKD47134
Stock Num: T04614
Make: Ford
Model: F150
Year: 2014
Exterior Color: Yellow
Interior Color: Black
Options:
  • 4-Wheel Disc Brakes
  • ABS
  • Adjustable Steering Wheel
  • AM/FM Stereo
  • Child Safety Locks
  • Conventional Spare Tire
  • Driver Air Bag
  • Engine Immobilizer
  • Four Wheel Drive
  • Front Head Air Bag
  • Front Side Air Bag
  • Intermittent Wipers
  • Keyless Entry
  • Pass-Through Rear Seat
  • Passenger Air Bag
  • Passenger Air Bag Sensor
  • Passenger Vanity Mirror
  • Power Door Locks
  • Power Mirror(s)
  • Power Steering
  • Power Windows
  • Rear Bench Seat
  • Rear Head Air Bag
  • Security System
  • Stability Control
  • Tire Pressure Monitor
  • Tow Hooks
  • Traction Control
  • Variable Speed Intermittent Wipers
Drive Type: 4WD
Number of Doors: 4 Doors
Mileage: 10

At River City Ford our commitment to customer service is second to none. As one of the premier dealership's in the country our inventory moves quickly PLEASE contact us quickly to check availability for your new vehicle. Easy, no-worry financing available for all credit situations. We go out of our way to earn your business with our low prices & friendly customer service. 888-461-0637

Auto Services in West Virginia

Steve`s Body Shop ★★★★★

Automobile Body Repairing & Painting
Address: BOTTLE Plant Rd, Camden-On-Gauley
Phone: (304) 742-8800

Speedy Lube ★★★★★

Auto Repair & Service, Auto Oil & Lube, Automobile Air Conditioning Equipment-Service & Repair
Address: 1148 Cedar Valley Dr, Berwind
Phone: (276) 963-0078

Southern Frederick Auto Repair ★★★★★

Auto Repair & Service, Brake Repair
Address: 153 Ryco Ln, Ridgeway
Phone: (540) 665-0278

South Park Service Center ★★★★★

Auto Repair & Service, Automobile Inspection Stations & Services
Address: 429 Brockway avenue, Dellslow
Phone: (304) 292-2620

South Branch Tire ★★★★★

Auto Repair & Service, Tire Dealers, Brake Repair
Address: 502 Clements St, Moorefield
Phone: (304) 538-2042

Rex`s Transmission Repair ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Auto Transmission
Address: 1420 Township Road 428, Weirton
Phone: (740) 537-4535

Auto blog

Former Cadillac boss Butler takes Ford tech job

Tue, 07 Jan 2014

When Don Butler made the surprising decision to leave his post as Cadillac's VP of global strategic development, it was a surprise. Citing a desire to "recalibrate, reassess my priorities" in that August announcement, it wasn't entirely clear where Butler - a virtual General Motors lifer after spending nearly 30 years with the company - would end up. Turns out he took a trip to Dearborn.
Butler has taken a position in the newly created position of Executive Director of Connected Vehicles and Services at Ford, where he'll be responsible for the Blue Oval's global connectivity strategy. "Not only does Don understand the connected car landscape, but probably just as important, he understands customer expectations," said Raj Nair, who, as Group Vice President of Global Product Development, is Butler's new boss. "Having a leader with technology experience both inside and outside the industry is a rare combination - we're excited to have Don join our team."
As Ford has received its fair share of flak for the sometimes recalcitrant MyFord Touch infotainment system and its Sync voice-controls, it appears that Butler has his work cut out for him.

Scandal-rocked UAW extends Ford, FCA contracts, prepares to strike GM

Fri, Sep 13 2019

DETROIT — Leaders of the United Auto Workers union have extended contracts with Ford and Fiat Chrysler indefinitely, but the pact with General Motors is still set to expire Saturday night. The move puts added pressure on bargainers for both sides as they approach the contract deadline and the union starts to make preparations for a strike. The contract extension was confirmed Friday by UAW spokesman Brian Rothenberg, who declined further comment on the talks. The union has picked GM as the target company, meaning it is the focus of bargaining and would be the first company to face a walkout. GMÂ’s contract with the union is scheduled to expire at 11:59 p.m. Saturday. ItÂ’s possible that the four-year GM contract also could be extended or a deal could be reached, but itÂ’s more likely that 49,200 UAW members could walk out of GM plants as early as Sunday because union and company demands are so far apart. Picket line schedules already have been posted near the entrance to one local UAW office in Detroit. Art Wheaton, an auto industry expert at the Worker Institute at Cornell University, expects the GM contract to be extended for a time, but he says the gulf between both sides is wide. “GM is looking through the windshield ahead, and it looks like nothing but land mines,” he said of a possible recession, trade disputes and the expense of developing electric and autonomous vehicles. “I think thereÂ’s really going to be a big problem down the road in matching the expectations of the union and the willingness of General Motors to be able to give the membership what it wants.” Plant-level union leaders from all over the country will be in Detroit on Sunday to talk about the next steps, and after that, the union likely will make an announcement. But leaders are likely to face questions about an expanding federal corruption probe that snared a top official on Thursday. Vance Pearson, head of a regional office based near St. Louis, was charged with corruption in an alleged scheme to embezzle union money and spend cash on premium booze, golf clubs, cigars and swanky stays in California. ItÂ’s the same region that UAW President Gary Jones led before taking the unionÂ’s top office last year. Jones and other union executives met privately at a hotel at Detroit Metropolitan Airport on Friday. After the meeting broke up, JonesÂ’ driver and others physically blocked an AP reporter from trying to approach him to ask questions.

Ford to build next F-150, outgoing model concurrently?

Wed, 24 Jul 2013

Ford is rumored to be considering concurrent production for old and new F-150 models in a bid to minimize supply chain disruptions and inventory. Automotive News is reporting that the Blue Oval will build both the current F-150 and its replacement, which we showed you testing just last month, side by side for about half a year before switching over entirely to next-generation production.
As IHS Automotive analyst Mike Jackson told AN, "In order to ramp up, you have to retool...and that means you have to take capacity offline." Building both models alongside could allow Ford to cope with the still strong demand for the current F-150, while populating dealer supplies and working out supply chain kinks for the new model before making a full-time switch.
A loss of capacity when demand is so strong, even for a short period, could spell bad news for Ford, which nets an estimated 90 percent of its global profit on pickups and large SUVs. As AN states, Ford produces the F-150 in both Kansas City, Missouri and Dearborn, Michigan, which allows it to maintain some degree of flexibility in production. The new F-150 is expected to arrive at the 2014 North American International Auto Show as a 2015 model, with a design inspired by the Atlas Concept first shown at the Detroit Auto Show last January.