2005 Dodge Sprinter 3500 Box Truck. 158 Wb. 14 Ft Box. Great Running Truck! on 2040-cars
Saint Louis, Missouri, United States
Engine:5 cylinder TD
Body Type:box truck
Vehicle Title:Clear
Fuel Type:Diesel
Exterior Color: White
Make: Dodge
Interior Color: Gray
Model: Sprinter
Number of Cylinders: 5
Trim: box truck
Drive Type: 2wd
Warranty: Vehicle does NOT have an existing warranty
Mileage: 102,000
Sub Model: 14 ft box
Dodge Sprinter for Sale
2004 freightliner dodge sprinter 2500 158 wheel base high roof. tommy lift(US $6,995.00)
2007 dodge sprinter passenger van 170 wheel base(US $25,900.00)
2007 dodge sprinter 3500 long wheel base mercedes diesel clear florida title
2008 sprinter mercedes passenger nav rear air camera megatop hitop low miles(US $37,000.00)
2004 dodge sprinter 2500 144 wheel base high top 162k miles no rust(US $9,400.00)
2005 dodge sprinter 2500 shc deisel rv motor home bed tv full bath kitchen(US $26,900.00)
Auto Services in Missouri
Wicked Stickers ★★★★★
Vietti Collision Center ★★★★★
Valvoline Instant Oil Change ★★★★★
Team 1 Auto Body & Glass ★★★★★
Talley`s Collision Repair Service ★★★★★
Tallant`s Auto Body & Hot Rod Shop ★★★★★
Auto blog
Fiat Chrysler will invest up to $1.5 billion to build EVs in Windsor
Thu, Oct 15 2020Fiat Chrysler Automobiles will invest between $1.35 billion and $1.5 billion in its Windsor assembly plant in Canada to build electric vehicles as part of a tentative deal with Canadian autoworkers, Unifor National President Jerry Dias said on Thursday. The auto union said FCA would invest in a state-of-the-art vehicle platform that will enable the assembly of plug-in hybrid and battery electric vehicles, with at least one new model in 2025. The announcement comes less than a month after Unifor said Ford would invest $1.46 billion in its Oakville and Windsor plants. "Not only is Fiat-Chrysler maintaining the current portfolio but they will be investing three derivatives to enhance the current portfolio," Dias said. Unifor also said it expects to extend the life of the Chrysler 300, a rear-wheel-drive luxury car and introduce multiple derivatives of the Dodge Charger and Challenger. The union said as many as 2,000 jobs would be added in 2024 at the Windsor plant. Market forecasting firm LMC Automotive on Thursday said it would take until 2024 for U.S. vehicle sales to recover from the coronavirus downturn and get close to the 17 million vehicles sold in 2019. Ratification meetings for the FCA deal will happen over the weekend, and members will vote on whether to accept the agreement on Sunday. The union is expected to begin negotiations with General Motors's Canadian unit next week. Related Video: Green Hirings/Firings/Layoffs Plants/Manufacturing UAW/Unions Chrysler Dodge Fiat Jeep RAM Coupe Electric Sedan windsor
Grand Cherokee Trackhawk or Challenger SRT Demon
Fri, Sep 1 2017Two of FCAs biggest stars the 2018 Jeep Grand Cherokee Trackhawk and the 2018 Dodge Challenger SRT Demon. Both deliver an impressive amount of horsepower and 0-60 MPH under 4 seconds. But, which one do you want? Dodge Jeep Autoblog Minute Videos Original Video
Stellantis pledges $2.8 billion investment in Canadian plants
Wed, May 4 2022Stellantis has re-upped its commitment to two pivotal Canadian factories. The Brampton Assembly Plant, where the Chrysler 300, Dodge Charger and Dodge Challenger are built, and the Windsor Assembly Plant, where the Chrysler Pacifica minivan is made, will receive a $2.8 million investment in the coming years. The announcement came as welcome news for Brampton, as the plant's future was very much in doubt. The company had only promised to build the three models, sharing an aged platform, through 2023. Now the future is more clear. Stellantis will begin retooling the facility in 2024 once production of the muscle car trio winds down. When it comes back online in 2025, it will produce "at least one all-new electric model". It will also serve as the production facility for an all-new flexible architecture, but which models it will support were not disclosed. As for Windsor, retooling will begin in 2023. Stellantis didn't say when it would finish, but that it would be home to a "new multi-energy vehicle (MEV) architecture that will provide battery-electric (BEV) capability for multiple models." Both plants are expected to return to a three-shift schedule after layoffs at the plants dropped them down to two shifts. The reaffirmation of investment in Canada follows last month's announcement that Stellantis and LG Energy Solution would establish a $4.1 billion joint venture to make battery packs for electric vehicles. The project is being billed as Canada's first large-scale lithium-ion battery plant. In addition, Windsor's Automotive Research and Development Centre (ARDC) will now become North America's first battery lab. Stellantis is expanding the site by 100,000 square feet, where engineers will conduct R&D into BEV, PHEV and HEV cells, modules and battery packs. Stellantis North America Chief Operating Officer Mark Stewart said, "These investments reaffirm our long-term commitment to Canada and represent an important step as we move toward zero-emission vehicles that deliver on our customers’ desire for innovative, clean, safe and affordable mobility.” Related video: This content is hosted by a third party. To view it, please update your privacy preferences. Manage Settings.







