2007 Ram 3500 Dually Slt Crew Cab 4x4,diesel,automatic,6 Disk Cd,70k,we Finance! on 2040-cars
Carrollton, Texas, United States
Dodge Ram 3500 for Sale
2011 dodge ram 3500 laramie mega 4x4 diesel drw dvd nav texas direct auto(US $44,780.00)
08 dodge ram 3500 crew lb 4x4 laramie cummins diesel sunroof leather loaded az
Cummins turbo diesel, four wheel drive, stick shift, ctd, dual rear wheels
2007 dodge ram 3500 quad cab slt 4x4 diesel(US $22,440.00)
4wd gooseneck auto flatbed 3500hd dually we finance we want your trade(US $16,981.00)
2005 dodge ram 3500 2x4 crew diesel service truck in va.(US $16,900.00)
Auto Services in Texas
Yale Auto ★★★★★
World Car Mazda Service ★★★★★
Wilson`s Automotive ★★★★★
Whitakers Auto Body & Paint ★★★★★
Wetzel`s Automotive ★★★★★
Wetmore Master Lube Exp Inc ★★★★★
Auto blog
Turn up the volume: Flat out in the Dodge Charger Scat Pack
Thu, Jul 4 2019The 2019 Dodge Charger R/T Scat Pack is a rare breed in the car market. It's a reasonably affordable large sedan with a huge honking V8 and rear wheel drive. You know, the perfect car for this Fourth of July. Or any day ending in Y, really. The R/T Scat Pack is the second most powerful version of the sedan with a 6.4-liter naturally aspirated V8 making 485 horsepower and 475 pound-feet of torque. Only the 707-horsepower Hellcat is a more powerful Charger. But power is only part of the story. The other part is the noise. The V8 has a gritty, dirty rumble to it. We recorded it cruising up on-ramps, down shifting, and got a few standing revs out of it. Check out the video to hear for yourself.
UAW workers strike at Stellantis casting plant in Indiana
Sat, Sep 10 2022DETROIT — United Auto Workers union members went on strike Saturday at the Stellantis casting plant in Indiana, citing health and safety issues including the company's alleged refusal to repair and replace the plantÂ’s air conditioning and heating systems. The 35-acre plant in Kokomo makes parts used in the powertrains of Chrysler, Dodge, Jeep and RAM vehicles and a long-term strike could affect vehicle assembly lines across North America. Stellantis says production had not been scheduled for this weekend and it hoped to resume negotiations as soon as possible on a contract with striking UAW Local 1166. In a statement, Stellantis said it was committed “to providing a safe and healthy work environment for all employees. After bargaining in good faith for two days and presenting an offer we believed addressed the unionÂ’s concerns, we are disappointed by the UAWÂ’s decision to walk out.” The 1,200-worker plant, Kokomo Casting, is the world's largest die cast facility, according to Stellantis. It makes aluminum parts for components including transmissions and engine blocks. The UAW local complained in a statement that Stellantis “claims it has no money to meet its membership's basic needs while ”making record profits and investing billions in a new battery plant across the street." UAW local president David Willis did not immediately return a phone call seeking comment. A person who answered the phone at union offices said he was preparing for a resumption in negotiations. The casting plant is to be retooled to produce engine blocks for hybrid-electric vehicles. In May, Stellantis announced a $2.5 billion joint venture with Samsung to build an electric vehicle battery factory in Kokomo that is to employ 1,400 workers. Stellantis, formed last year with the merger of Fiat Chrysler and FranceÂ’s PSA Peugeot, had said it would build two electric vehicle battery factories in North America. The other is slated for Windsor, Ontario. Plants/Manufacturing UAW/Unions Chrysler Dodge Jeep RAM
Stellantis pledges $2.8 billion investment in Canadian plants
Wed, May 4 2022Stellantis has re-upped its commitment to two pivotal Canadian factories. The Brampton Assembly Plant, where the Chrysler 300, Dodge Charger and Dodge Challenger are built, and the Windsor Assembly Plant, where the Chrysler Pacifica minivan is made, will receive a $2.8 million investment in the coming years. The announcement came as welcome news for Brampton, as the plant's future was very much in doubt. The company had only promised to build the three models, sharing an aged platform, through 2023. Now the future is more clear. Stellantis will begin retooling the facility in 2024 once production of the muscle car trio winds down. When it comes back online in 2025, it will produce "at least one all-new electric model". It will also serve as the production facility for an all-new flexible architecture, but which models it will support were not disclosed. As for Windsor, retooling will begin in 2023. Stellantis didn't say when it would finish, but that it would be home to a "new multi-energy vehicle (MEV) architecture that will provide battery-electric (BEV) capability for multiple models." Both plants are expected to return to a three-shift schedule after layoffs at the plants dropped them down to two shifts. The reaffirmation of investment in Canada follows last month's announcement that Stellantis and LG Energy Solution would establish a $4.1 billion joint venture to make battery packs for electric vehicles. The project is being billed as Canada's first large-scale lithium-ion battery plant. In addition, Windsor's Automotive Research and Development Centre (ARDC) will now become North America's first battery lab. Stellantis is expanding the site by 100,000 square feet, where engineers will conduct R&D into BEV, PHEV and HEV cells, modules and battery packs. Stellantis North America Chief Operating Officer Mark Stewart said, "These investments reaffirm our long-term commitment to Canada and represent an important step as we move toward zero-emission vehicles that deliver on our customers’ desire for innovative, clean, safe and affordable mobility.” Related video: This content is hosted by a third party. To view it, please update your privacy preferences. Manage Settings.
