Dodge M37 on 2040-cars
Pilot Mountain, North Carolina, United States
Body Type:Pickup Truck
Engine:v6
Vehicle Title:Clear
Fuel Type:Gasoline
For Sale By:Private Seller
Make: Dodge
Model: Other Pickups
Cab Type (For Trucks Only): Regular Cab
Trim: red
Warranty: Vehicle does NOT have an existing warranty
Drive Type: 4x4
Options: 4-Wheel Drive
Mileage: 2,000
Exterior Color: Orange
Interior Color: Black
Disability Equipped: No
Number of Cylinders: 6
This is a decent M37 up for bid, do not have a title but have paper work so one can be filed for. This is a nice truck for the age and I have taken pics of all the bad spots/rust through I have found. Truck will run but needs a complete Resto. Breaks do not work and engine will turn over and start but will not stay running even though it did run fine 6 months ago soi assume it's the carb? I do have access to a tractor so it can be loaded on a trailer rather easily. Please don't think this truck is road ready or in great shape b/c as i have stated it needs a complete resto. but for a 60yr old truck it's in GREAT shape. At least half the winning big is due with in 48 hours of auction end with other half due upon pick up of item if not paid in full prior to pick up. If not then i will file a complaint because im not waiting days for any form of money while the delivery or pick up plans are worked out. Thanks for looking!!!
Dodge Other Pickups for Sale
Auto Services in North Carolina
Wood Tire & Alignment ★★★★★
Wilhelm`s ★★★★★
Wilcox Auto Sales ★★★★★
Town & Country Radiator ★★★★★
The Transmission Shop ★★★★★
The Auto Finders ★★★★★
Auto blog
Stellantis invests more than $100 million in California lithium project
Thu, Aug 17 2023Stellantis said it would invest more than $100 million in California's Controlled Thermal Resources, its latest bet on the direct lithium extraction (DLE) sector amid the global hunt for new sources of the electric vehicle battery metal. The investment by the Chrysler and Jeep parent announced on Thursday comes as the green energy transition and U.S. Inflation Reduction Act have fueled concerns that supplies of lithium and other materials may fall short of strong demand forecasts. DLE technologies vary, but each aims to mechanically filter lithium from salty brine deposits and thus avoid the need for open pit mines or large evaporation ponds, the two most common but environmentally challenging ways to extract the battery metal. Stellantis, which has said half of its fleet will be electric by 2030, also agreed to nearly triple the amount of lithium it will buy from Controlled Thermal, boosting a previous order to 65,000 metric tons annually for at least 10 years, starting in 2027. "This is a significant investment and goes a long way toward developing this key project," Controlled Thermal CEO Rod Colwell said in an interview. The company plans to spend more than $1 billion to separate lithium from superhot geothermal brines extracted from beneath California's Salton Sea after flashing steam off those brines to spin turbines that will produce electricity starting next year. That renewable power is expected to cut the amount of carbon emitted during lithium production. Rival Berkshire Hathaway has struggled to produce lithium from the same area given large concentrations of silica in the brine that can form glass when cooled, clogging pipes. Colwell said a $65 million facility recently installed by Controlled Thermal can remove that silica and other unwanted metals. DLE equipment licensed from Koch Industries would then remove the lithium. "We're very happy with the equipment," he said. "We're going to deliver. There's just no doubt about it." Stellantis CEO Carlos Tavares called the Controlled Thermal partnership "an important step in our care for our customers and our planet as we work to provide clean, safe and affordable mobility." Both companies declined to provide the specific investment amount. Controlled Thermal aims to obtain final permits by October and start construction of a commercial lithium plant soon thereafter, Colwell said. Goldman Sachs is leading the search for additional debt and equity financing, he added.
Roadkill pits every project car against each other
Sat, 22 Feb 2014The guys behind Motor Trend's monthly Roadkill series have collected nine of their favorite project cars from their videos and pitted them against each other in a battle royale to determine a winner. It's 44 minutes long, but it's completely worth the investment of time.
The cars run the gamut from a 1973 Chevrolet Ramp Truck, a 1975 AMC Pacer and a legitimately impressive 1967 Chevy Camaro, and they are pitted against each other to see which is the fastest around an autocross course. The drivers include Roadkill's two hosts and Motor Trend's Johnny Lieberman and Carlos Lago. It's reminiscent of the best episodes of Top Gear and worth a watch.
So it's the weekend - the perfect time to relax. Grab your preferred beverage, get comfortable and enjoy 44 minutes of some seriously ratty but utterly cool project cars as they are throttled within an inch of their lives (or past it). Scroll down to check out the video.
FCA to invest $4.5B for new Detroit plant, expanded production at current facilities
Tue, Feb 26 2019We expected some shifts in manufacturing plans as Fiat Chrysler plans to begin electrifying its Jeep brand, but this news bodes well for Michigan. FCA announced today that it would spend $4.5 billion to expand production in the state, including building a new assembly plant in Detroit and increasing capacity at five other facilities in the state. The plan, which FCA says will create nearly 6,500 new jobs, will help to meet increasing demand for Ram and Jeep products, and to electrify Jeep models. $1.6 billion will be set aside to transform the Mack Avenue Engine Complex into a site to build the next generation of Jeep Grand Cherokee, as well as an unspecified, new three-row Jeep model. FCA says this part of the plan will create 3,850 new jobs. FCA is increasing its investment in the Warren Truck plant to $1.5 billion in order to continue building the Ram 1500 Classic, as well as the new Jeep Wagoneer and Grand Wagoneer, creating 1,400 new jobs. FCA says that the new Ram 1500 Heavy Duty will still be built in Saltillo, Mexico. At FCA's Jefferson North facility, the automaker will invest $900 million to upgrade the plant. This site will continue to build the Dodge Durango, as well help build the next Jeep Grand Cherokee. FCA expects this to create 1,100 new jobs. As Jeep plans to electrify models in its SUV lineup, each of the above plants will produce plug-in hybrid versions of the Jeep models produced there, "with flexibility to build fully battery-electric models in the future," the company said in its announcement. "Three years ago, FCA set a course to grow our profitability based on the strength of the Jeep and Ram brands by realigning our U.S. manufacturing operations," said FCA CEO Mike Manley, referring in part to earlier investments in Illinois, Ohio and Michigan. "Today's announcement represents the next step in that strategy," Manley continued. "It allows Jeep to enter two white space segments that offer significant margin opportunities and will enable new electrified Jeep products, including at least four plug-in hybrid vehicles and the flexibility to produce fully battery-electric vehicles." Other investments include $119 million to move production of the 3.0-, 3.2- and 3.6-liter Pentastar engines from Mack I to the Dundee Engine Plant, and $400 million for increased capacity and 80 new jobs at the Sterling and Warren stamping plants. This comes at a time when FCA's U.S.