2003 Chrysler Pt Cruiser Auto - Apple Ipad Included! on 2040-cars
Newton, North Carolina, United States
Vehicle Title:Clear
For Sale By:Dealer
Engine:2.4L 2429CC 148Cu. In. l4 GAS DOHC Naturally Aspirated
Body Type:Wagon
Fuel Type:GAS
Make: Chrysler
Model: PT Cruiser
Trim: Base Wagon 4-Door
Transmission Description: 4-SPEED AUTOMATIC TRANSMISSION W/OD
Number of Doors: 4
Drive Type: FWD
Drivetrain: Front Wheel Drive
Mileage: 62,738
Exterior Color: Other
Number of Cylinders: 4
Interior Color: Tan
Chrysler PT Cruiser for Sale
2007 chrysler pt cruiser convertible automatic only 18k texas direct auto(US $11,980.00)
2006 chrysler 2.4liter 4 cyl convertible(US $7,995.00)
2008 touring used 2.4l i4 16v fwd suv premium
2008 chrysler pt cruiser lx(US $8,998.00)
2002 pt cruiser limited edition, runs and drives great! needs nothing no reserve
2002 chrysler pt cruiser low mileage, fresh timing belt(US $3,295.00)
Auto Services in North Carolina
Wood Tire & Alignment ★★★★★
Wilhelm`s ★★★★★
Wilcox Auto Sales ★★★★★
Town & Country Radiator ★★★★★
The Transmission Shop ★★★★★
The Auto Finders ★★★★★
Auto blog
Scandal-rocked UAW extends Ford, FCA contracts, prepares to strike GM
Fri, Sep 13 2019DETROIT — Leaders of the United Auto Workers union have extended contracts with Ford and Fiat Chrysler indefinitely, but the pact with General Motors is still set to expire Saturday night. The move puts added pressure on bargainers for both sides as they approach the contract deadline and the union starts to make preparations for a strike. The contract extension was confirmed Friday by UAW spokesman Brian Rothenberg, who declined further comment on the talks. The union has picked GM as the target company, meaning it is the focus of bargaining and would be the first company to face a walkout. GMÂ’s contract with the union is scheduled to expire at 11:59 p.m. Saturday. ItÂ’s possible that the four-year GM contract also could be extended or a deal could be reached, but itÂ’s more likely that 49,200 UAW members could walk out of GM plants as early as Sunday because union and company demands are so far apart. Picket line schedules already have been posted near the entrance to one local UAW office in Detroit. Art Wheaton, an auto industry expert at the Worker Institute at Cornell University, expects the GM contract to be extended for a time, but he says the gulf between both sides is wide. “GM is looking through the windshield ahead, and it looks like nothing but land mines,” he said of a possible recession, trade disputes and the expense of developing electric and autonomous vehicles. “I think thereÂ’s really going to be a big problem down the road in matching the expectations of the union and the willingness of General Motors to be able to give the membership what it wants.” Plant-level union leaders from all over the country will be in Detroit on Sunday to talk about the next steps, and after that, the union likely will make an announcement. But leaders are likely to face questions about an expanding federal corruption probe that snared a top official on Thursday. Vance Pearson, head of a regional office based near St. Louis, was charged with corruption in an alleged scheme to embezzle union money and spend cash on premium booze, golf clubs, cigars and swanky stays in California. ItÂ’s the same region that UAW President Gary Jones led before taking the unionÂ’s top office last year. Jones and other union executives met privately at a hotel at Detroit Metropolitan Airport on Friday. After the meeting broke up, JonesÂ’ driver and others physically blocked an AP reporter from trying to approach him to ask questions.
Detroit gets ready to train up workers for coming FCA Jeep job boom
Fri, Mar 1 2019DETROIT — Fiat Chrysler Automobiles this week announced a $4.5 billion investment that would bring 6,500 new manufacturing jobs to Detroit and its suburbs and, nearly two years before the first new vehicles will even roll off the line, the city already is taking steps to ensure it can provide enough workers with the needed skills. Detroit's economy was once dominated by automotive manufacturing, but since the industry's gradual migration from the metro area it has suffered among the highest poverty and unemployment rates in the country. Not long ago, Detroit was struggling to provide basic services, culminating in bankruptcy in 2013. Providing job training then would have been a tall order. But in its recovery, the city has overhauled its training programs and slowly built a track record for preparing people for specific jobs. "We're not starting from scratch," Jeff Donofrio, the city's executive director of workforce development, said Wednesday, a day after the Italian-American automaker announced its plan . "We want to make sure we're prepared for all the ... jobs that will come to the city as a result of the investments." The city works with two high schools, a community college and a workforce development organization, in partnerships with the auto union and companies, to tailor training programs for positions in manufacturing, construction, information technology and health care. Detroit worked closely with global auto parts supplier Flex-N-Gate to ensure Detroiters were handed jobs when the company last year opened a plant in what officials described as the largest investment in the city in two decades. The city and company developed customized training with the nonprofit Focus: Hope, which prioritizes workforce development and education. "About 250 individuals went through that training and a vast majority were hired by Flex-N-Gate," Donofrio said. With tax breaks and land acquisitions still to be hammered out, Fiat Chrysler's specific workforce needs have yet to be revealed. But Donofrio insists that the city has a growing force of eligible workers: Detroit last year enrolled about 2,500 people in training leading to a credential for a specific job, up from about 700 two years earlier. Some prospective FCA jobs could be offered to laid-off Fiat Chrysler workers or those already working for the company on a temporary basis, and United Auto Workers officials say many of them are already in Detroit.
Hot sales have Detroit automakers shortening summer shutdowns
Tue, 08 Jul 2014Back in May, there was speculation that the Detroit Three automakers would maintain or perhaps even extend their traditional summer shutdowns, mostly due to a bitingly cold winter that saw below-freezing temperatures infiltrate the southernmost reaches of the US, putting a chill on auto sales. Now, though, the numbers are in, and thanks to some promising sales figures, it looks like some domestic line workers are going to be working clear through July, in some cases.
According to Automotive News, Ford has slashed its traditional two-week hiatus for factory workers in half at four of its plants, while both Chrysler and General Motors will keep factories running nonstop (two plants in Chrysler's case and a third of GM's factories).
This is, as we said, thanks to some positive numbers. Chief among those is the Seasonal Adjusted Annual Rate, which was at an eight-year high of 17 million units. Individual figures were less promising. GM, embroiled in its recall scandal, still saw a one-percent increase while Ford dropped six percent in year-over-year sales. Chrysler was the big winner, though, with a nine-percent jump in June.