Find or Sell Used Cars, Trucks, and SUVs in USA

2012 Chevrolet Traverse on 2040-cars

US $23,900.00
Year:2012 Mileage:28291 Color: Black /
  Dark Gray/Light Gray
Location:

Lake Jackson, Texas, United States

Lake Jackson, Texas, United States
Advertising:
Vehicle Title:Clear
Engine:3.6L 217Cu. In. V6 GAS DOHC Naturally Aspirated
For Sale By:Dealer
Transmission:Automatic, Automatic
Body Type:Sport Utility
Fuel Type:GAS
VIN: 1GNKRGED8CJ214792 Year: 2012
Warranty: Vehicle has an existing warranty
Make: Chevrolet
Model: Traverse
Safety Features: Anti-Lock Brakes, Driver Airbag
Trim: LT Sport Utility 4-Door
Power Options: Power Windows, Power Seats, Air Conditioning
Drive Type: FWD
Transmission Type: Automatic
Mileage: 28,291
Sub Model: LT
Exterior Color: Black
Number of Cylinders: 6
Interior Color: Dark Gray/Light Gray
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. ... 

Auto Services in Texas

Whatley Motors ★★★★★

Used Car Dealers, Wholesale Used Car Dealers
Address: 409 Scott Ave, Sheppard-Afb
Phone: (940) 723-8991

Westside Chevrolet ★★★★★

Auto Repair & Service, New Car Dealers, Used Car Dealers
Address: 23001 Katy Fwy, Barker
Phone: (281) 392-3200

Westpark Auto ★★★★★

Auto Repair & Service
Address: 4045 Tanglewilde St, West-University-Place
Phone: (281) 320-1185

WE BUY CARS ★★★★★

Used Car Dealers, Financial Services, Loans
Address: 2306 E Berry St, Aledo
Phone: (817) 535-1111

Waco Hyundai ★★★★★

New Car Dealers, Used Car Dealers
Address: 1501 W Loop 340, Bruceville
Phone: (254) 420-2366

Victorymotorcars ★★★★★

Auto Repair & Service, New Car Dealers, Used Car Dealers
Address: 5829 Beverly Hill St, Missouri-City
Phone: (713) 783-6555

Auto blog

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.

MotorWeek Retro Review revisits 1984 Corvette

Thu, Oct 1 2015

MotorWeek's Retro Reviews are always a great glimpse into the cars of yesteryear. However, the newly uploaded look back at the 1984 Chevrolet Corvette is an absolute treasure trove for any auto history buff. This is a full episode of the show from the '80s, and it's dedicated to all of the details about the newest 'Vette to hit the market at the time. Beyond just the usual drive and an in-depth walk around, one of the major highlights here is a brief look at some on the concepts that eventually resulted in the fourth-generation Corvette of 1984. The C4's shape harkens back to sketches from 1978, and there even shots of early clay models that led the way for the design. MotorWeek also takes a tour through the Bowling Green, KY, factory for a detailed inspection of the entire production process. John Davis repeatedly calls the Corvette "the plastic fantastic" during the episode, and he can't find too much negative to say about being behind the wheel of the then-new coupe. See how it stands up to your own memories in the clip above.

7 major automakers to build open EV charging network

Wed, Jul 26 2023

A new joint venture established by BMW, GM, Honda, Hyundai, Kia, Mercedes-Benz and Stellantis will build a new North American electric vehicle charging network on a scale designed to compete with Tesla's industry-benchmark Supercharger network. The 30,000-plus planned new chargers will accommodate both Tesla's almost-standard North American Charging System (NACS) and existing automakers' Combined Charging System (CCS) options, effectively guaranteeing compatibility with the vast majority of current and upcoming electric models — whether they're from one of the involved automakers or not.  "With the generational investments in public charging being implemented on the Federal and State level, the joint venture will leverage public and private funds to accelerate the installation of high-powered charging for customers. The new charging stations will be accessible to all battery-powered electric vehicles from any automaker using Combined Charging System (CCS) or North American Charging Standard (NACS) and are expected to meet or exceed the spirit and requirements of the U.S. National Electric Vehicle Infrastructure (NEVI) program." Critically, the automakers involved will have a say in how the charging tech is implemented, guaranteeing that the hardware will play nicely with each automaker's in-house charging systems. Hyundai and Kia, for example, were hesitant to jump on board the Tesla NACS bandwagon earlier this year over concerns that the Supercharger network is insufficient for powering the two automakers' 800-volt charging systems; similar tech is used by Volkswagen and Porsche.  In addition to providing much-needed capacity and high-output charging for America's growing fleet of electric cars and trucks, the new network will integrate seamlessly with each automaker's in-app and in-vehicle features, rather than forcing customers to use third-party tools and payment systems, as is the case with some existing public charging infrastructure.  "The functions and services of the network will allow for seamless integration with participating automakersÂ’ in-vehicle and in-app experiences, including reservations, intelligent route planning and navigation, payment applications, transparent energy management and more. In addition, the network will leverage Plug & Charge technology to further enhance the customer experience," the announcement said.