1990 Chevrolet Suburban 1500 4x2 Classic Suv 5.7l 350 V8 Power Windows Suv R1500 on 2040-cars
Pompano Beach, Florida, United States
Fuel Type:Gasoline
For Sale By:Dealer
Engine:5.7L 350Cu. In. V8 GAS OHV Naturally Aspirated
Transmission:Automatic
Body Type:SUV
Used
Year: 1990
Make: Chevrolet
Model: Suburban
Mileage: 165,275
Doors: 4
Sub Model: R1500
Engine Description: 5.7L 8 CYLINDER
Exterior Color: Blue/Silver
Trim: Silverado Sport Utility 4-Door
Interior Color: Blue
Number of Cylinders: 8
Drive Type: RWD
Warranty: Vehicle does NOT have an existing warranty
Chevrolet Suburban for Sale
Chevrolet suburban lt low miles 4 dr suv automatic 5.3l 8 cyl engine summit whit(US $37,777.00)
1996 chevrolet suburban 1500 - 4wd vortec 5700 v8 w/3rd row bench + 2 hitches
2003 chevrolet suburban 2500 lt, 4wd, 6.0l, one owner, low miles(US $15,900.00)
2008 chevrolet suburban lt 4x4 lth/htd seats clean $699 ship(US $17,480.00)
1986 chevrolet suburban scottsdale 10/ looks&drives great/kept up to date
3 rows leather dvd remote start heated power seats sunroof power hatch xm onstar(US $18,981.00)
Auto Services in Florida
Zip Automotive ★★★★★
X-Lent Auto Body, Inc. ★★★★★
Wilde Jaguar of Sarasota ★★★★★
Wheeler Power Products ★★★★★
Westland Motors R C P Inc ★★★★★
West Coast Collision Center ★★★★★
Auto blog
Next-gen Chevy Volt will get 1.5-liter, four-cylinder engine
Tue, Oct 28 2014As General Motors gets ready to unveil the new Chevy Volt at the Detroit Auto Show in January, it's starting to reveal a few more details about the updated plug-in hybrid. Today should be fruitful on that front, thanks to an event GM is hosting today that focuses on the new Volt, and we've just had the first bit of new: a bigger engine is coming. Since the beginning, the Volt has used a 1.4-liter, four-cylinder engine as a range extender when the battery runs dry. The second-generation model will instead get a slightly larger 1.5-liter, four-cylinder engine that will be built in Flint, MI. That's a step up from the various engines that have been a part of the 2016 Volt's rumored mills, everything from a 1.0-liter or 1.2-liter three-cylinder to a 2.0-liter turbo. The confirmation about the new 1.5-liter powerplant was found in Automotive News, where we also heard again that GM is going to start building the new Volt's electric drive unit in Detroit, moving production up from Mexico. We will have more information on the 2016 Chevy Volt later today.
GM delays 3.0-liter Duramax diesel in Silverado and Sierra pickups
Thu, May 23 2019Stricter testing protocols around the world are making it harder for automakers to predict launch timelines. GM is the latest to get caught in emissions nettles, the Detroit carmaker forced to delay the launch of its new Duramax 3.0-liter inline-six diesel for the Chevrolet Silverado 1500 and GMC Sierra 1500. That's what company reps told dealers in a memo seen by Automotive News this week. Dealers and buyers had been promised the Flint, Mich.-built oil-burner in early 2019, but AN wrote that the EPA certification hiccup has turned into a "slight delay." A GM spokesman told Motor1, "[We] did not attribute [the delay] to a single entity, as the truth is this is a collaborative effort between GM and several government entities. We will make the 2020MY Duramax available for dealers orders soon, and expect to deliver the first trucks to customers soon after emissions testing is complete." We know the new 3.0-liter Duramax diesel has 277 horsepower and 460 pound-feet of torque, outdoing Ford's 3.0-liter PowerStroke diesel by 27 hp and 20 lb-ft. But without final EPA paperwork, GM can't release the numbers that will show how the two engines stack up when considering fuel economy and tow ratings. The certification process has been sticky for a few other makers of late, especially since the Volkswagen Group situation in 2015. BMW had to delay the launch of four diesel models in 2016 over EPA testing. The new Ram 1500 dribbled out in a trickle last year for reasons thought to deal with EPA testing, coming as it did a year after the EPA investigated Ram's EcoDiesel engines in 2017 and 2018. More recently, WLTP testing in Europe caught out just about every automaker over there. Since we're almost halfway through 2019, the delay until the 2020 model year is only a few months. Still, GM told dealers to cancel any orders for the engine for this model year. Dealers will need to resubmit the orders once opening begins, but GM hasn't said when production will begin other than "soon." The company said that it will offer 2020-model-year replacement vehicles to customers and dealers. If prices hold into the next model year, the 2020 Silverado 1500 and Sierra 1500 with the inline-six diesel will come at a $3,890 premium over the 2.7-liter turbo four-cylinder, and a $2,495 premium over the 5.3-liter V8.
GM workers in Oshawa walk out in protest of plant closure
Mon, Nov 26 2018TORONTO/MONTREAL – Canadian Prime Minister Justin Trudeau on Monday expressed his "deep disappointment" in General Motors' decision to close its Oshawa plant, a move Canadian officials only learned about on Sunday and which led workers to walk off the job on Monday. GM said the closure affects a total of 2,973 assembly line jobs. GM's total employment in Canada is 8,150 direct jobs. Workers in the Unifor trade union walked out of the Oshawa plant "in protest," ahead of a meeting with GM about the announcement, a union spokeswoman said. "I've moved my family twice for this company and they do this to me," a tearful worker told CBC TV as he left the plant. Currently, the Oshawa plant builds the Cadillac XTS and Chevy Impala sedans. Under Unifor's four-year contract signed in 2016, GM must give the union a year's notice before closing the plant. The automaker intends to close the plant in December, 2019. A 2015 study commissioned by Unifor, which represents GM employees, estimated that shutting the plant would eliminate 4,100 direct jobs and reduce Ontario's gross domestic product by C$1.1 billion. But Jerry Dias, president of Unifor, said the move amounts to a breach of the automaker's contract with its employees. "We have a collective agreement that says they're not closing any of our facilities ... so we will do anything by any means to make sure that they live up to their word," Dias said at a news conference. Dias said the contract between Unifor and the company forbids GM from closing any of its Canadian plants during the contract period, which ends in September 2020. "They are not closing our damn plant without one hell of a fight." Canadian officials promised to aid auto workers affected by the 2019 closure, part of a wider restructuring by the automaker that will cut production of slow-selling models and slash its North American workforce. "I spoke with GM (CEO) Mary Barra to express my deep disappointment in the closure," Trudeau tweeted on Monday. "We'll do everything we can to help the families affected by this news get back on their feet." GM workers have been part of the heart and soul of Oshawa for generations - and we'll do everything we can to help the families affected by this news get back on their feet. Yesterday, I spoke with @GM's Mary Barra to express my deep disappointment in the closure.
2040Cars.com © 2012-2025. All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.
Use of this Web site constitutes acceptance of the 2040Cars User Agreement and Privacy Policy.
0.068 s, 7953 u
