2002 Chevrolet Silverado 3500 K3500 on 2040-cars
Citrus Heights, California, United States
Body Type:Standard Cab Pickup
Engine:8.1L Gas V8
Transmission:Automatic
Fuel Type:Gasoline
For Sale By:Private Seller
VIN (Vehicle Identification Number): 1GCJK34G52E122365
Mileage: 104000
Model: Silverado 3500
Make: Chevrolet
Number of Cylinders: 8
Drive Type: 4WD
Trim: K3500
Interior Color: Gray
Number of Seats: 3
Fuel: gasoline
Engine Size: 8.1
Car Type: Collector Cars
Number of Doors: 2
Chevrolet Silverado 3500 for Sale
2011 chevrolet silverado k3500 ltz(US $32,000.00)
2014 chevrolet silverado 3500(US $17,000.00)
Clean(US $24,999.00)
2017 chevrolet silverado 3500(US $20,999.00)
1987 chevrolet silverado 3500 k30(US $15,400.00)
Clean title(US $15,999.00)
Auto Services in California
Z Best Auto Sales ★★★★★
Woodland Hills Imports ★★★★★
Woodcrest Auto Service ★★★★★
Western Tire Co ★★★★★
Western Muffler ★★★★★
Western Motors ★★★★★
Auto blog
Brief website update hints 2016 Chevy Volt will get 43 mpg, 106 MPGe
Sun, Jun 14 2015Customers in California can already order the 2016 Chevrolet Volt and be the first to own the new, range-extended EV in August. It appears there's now a possibility that buyers of the updated model might get slightly better economy than Chevy's initial announcement from the 2015 Detroit Auto Show in January, too. According to the eagle-eyed folks at GM-Volt.com, Chevy has been subtly tweaking the spec page for the 2016 Volt. It briefly showed the model getting 43 miles per gallon combined fuel economy and 106 mpge, rather than the originally released figures of 41 mpg and 102 mpge. Shortly afterward, the internal-combustion mileage returned to 41 mpg, but 106 mpge remained. A GM spokesperson told Hybrid Cars the changes happened by mistake. "We have not finalized numbers yet. We expect to announce in July." The economy isn't the only statistic to see an adjustment, though. The total range was reportedly briefly shown as 420 miles, and then returned to a 430-mile rating, according to Hybrid Cars. The Volt's output has also been slightly tweaked from the original figures. It's now displayed as 150 horsepower and 293 pound-feet of torque, versus the preliminary numbers of 149 hp and 294 lb-ft. These tiny changes likely have a negligible impact on real-world driving, but they suggest that Chevy's team is still working to squeeze as much as possible from the latest Volt's powertrain. If the final figures are coming in July, then the engineers still have just a few weeks to improve the ratings even more.
Chevy to resume engine-building program for 2015 Corvette Z06
Thu, Jan 8 2015One of Chevrolet's most popular and unique customer features is set to return for 2015, as the company has announced that the Engine Build Experience is back. Interested owners will be able to screw together their engines beginning in March. The $5,000 option (which does not include the cost of travel) will give future owners of the 2015 Corvette Z06 the chance to screw together their car's actual 6.2-liter, supercharged V8. Available on each of the Z06's three trims, the Engine Build Experience includes a day at the Performance Build Center, instruction from an engine assembly tech, photographs of the experience and a personalized engine plaque. Once the build process is completed, the engine will (eventually) be fitted under the hood of the customer's personal Z06. "Chevrolet recognizes the passion customers have for Corvette and the Engine Build Experience offers them a truly unique opportunity for hands-on involvement in the creation of the heart of their new car," Corvette product manager Harlan Charles. "It's important for customers to understand their engine won't be installed the day after they built it. It will flow into the scheduling process for vehicle assembly, which depends on a number of logistical variables." Scroll down for the official announcement of the Z06's Engine Build Experience, available below. Exclusive Corvette Engine Build Experience Returns Program renewed for supercharged LT4 engine at new Bowling Green build center 2015-01-07 BOWLING GREEN, Ky. – Chevrolet announced today it is resuming the exclusive Engine Build Experience for Corvette Z06 customers – the only program of its kind for supercar customers. Starting in March 2015, Corvette Z06 customers will be able to assemble the 650-hp supercharged LT4 engine for their cars at the new Performance Build Center inside the Bowling Green Assembly Plant. "Chevrolet recognizes the passion customers have for Corvette and the Engine Build Experience offers them a truly unique opportunity for hands-on involvement in the creation of the heart of their new car," said Harlan Charles, Corvette product manager. "It's a chance to bond with their new car." The Engine Build Experience is selected with order code PBC and is offered on all Z06 trim levels.
Farley reacts as UAW expands strike against Ford, GM
Fri, Sep 29 2023Members of the United Auto Worker union walk out of the Chicago Ford Assembly Plant as Lance Williams from Lansing, Ill., waves the UAW flag Friday. (AP)  As the United Auto Workers walk off the job at an additional Ford and General Motors plant, Ford CEO Jim Farley addressed investors and members of the media Friday, pleading the case for the company's latest overture to the union and addressing both public and investor concerns regarding the core issues facing American manufacturing. Farley made a public case for Ford's efforts to resolve the dispute, expressing frustration with the ongoing stalemate and noting both the concessions Ford offered before the strike began and the signing of a contract with Canada's Unifor. Farley also acknowledged UAW President Shawn Fain's success in getting the union's message out, quipping: "Shawn has been on TV more than Jake from State Farm at this point." The first-ever simultaneous strike against the Detroit Three automakers enters its third week with threats of continued expansion, but little in the way of obvious concrete progress. "If the UAW’s goal is a record contract, they have already achieved this," Farley said. "It is grossly irresponsible to escalate these strikes and hurt thousands of families." Farley also lamented the fact that EVs have become the subject of partisan conflict, with the company's recently announced battery production facilities taking heat from both pundits and investors as Ford was forced to press pause on the venture while negotiations continue. Former President Donald Trump dropped in to Michigan this week to declare EVs the enemy of blue-collar jobs. "They've become a political football, and that's a shame," he said. Friday saw an expansion of the UAW strike to Ford's Chicago assembly plant and GM's Lansing, Delta Township, Michigan, assembly plant, covering about 7,000 workers, Fain said in an announcement, bringing the total number of workers on the picket lines to 25,000. The strike will not include any additional members at Stellantis, where talks have reportedly been more productive. The Ford and GM plants went on strike at noon Eastern today (Friday). Ford builds the Explorer and Lincoln Aviator in Chicago. GM's Delta Township plant builds Chevy Traverse and Buick Enclave. "Despite our willingness to bargain, Ford and GM have refused to make meaningful progress," Fain said in a video address Friday morning.