2012 Chevy Silverado 1500 Regular Cab V6 Side Steps 12k Texas Direct Auto on 2040-cars
Stafford, Texas, United States
Engine:See Description
Fuel Type:Gasoline
For Sale By:Dealer
Transmission:Automatic
Body Type:Pickup Truck
Warranty: Vehicle has an existing warranty
Make: Chevrolet
Model: Silverado 1500
Power Options: Power Locks, Cruise Control
Mileage: 12,268
Sub Model: WE FINANCE!!
Number of Doors: 2
Exterior Color: Silver
CALL NOW: 281-410-6079
Interior Color: Gray
Inspection: Vehicle has been inspected
Number of Cylinders: 6
Cab Type: Regular Cab
Seller Rating: 5 STAR *****
Chevrolet Silverado 1500 for Sale
2005 chevrolet sliverado joe gibbs performance package loaded
2002 chevrolet 1500 standard rwd blue 1 owner truck gas no reserve long bed 2wd
2007 chevy silverado 1500 4x4 extended cab z71 package only 25k miles!(US $20,951.00)
2010 chevrolet silverado 1500 2wd ext cab 143.5" lt power windows
2004 chevrolet silverado 1500 - reg cab - new tires - auto - local trade
2005 chevrolet silverado 1500 ls standard cab pickup 2-door 5.3l
Auto Services in Texas
Zepco ★★★★★
Xtreme Motor Cars ★★★★★
Worthingtons Divine Auto ★★★★★
Worthington Divine Auto ★★★★★
Wills Point Automotive ★★★★★
Weaver Bros. Motor Co ★★★★★
Auto blog
GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.
Thu, Jul 14 2022All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.
Chevy Bolt will go into production in Michigan in 2016 [UPDATE]
Fri, Feb 6 2015While nothing official has been announced, it appears that General Motors may actually put the all-electric Chevy Bolt into production next year. That's the rumor that Reuters is reporting, citing two sources at suppliers for the upcoming $30,000 EV (although that $30,000 number bears some scrutiny). This rumor does fit in with earlier comments that the Bolt would arrive on the market in 2017. If it gets built, the Bolt will share more than a similar-sounding name with the Chevy Volt: the EV will be put together in metro Detroit. Reuters says the 200-mile electric car (and an Opel version) will be made in "an underused small-car plant north of Detroit," which means the Orion Township plant. GM could make between 25,000 and 30,000 Bolts a year there, if what the suppliers are saying is true. We have asked GM for a statement on this story and will update it if we hear back. UPDATE: General Motors manager of electrification technology communications, Kevin Kelly, told AutoblogGreen that, "Bolt EV Concept is just that – a concept. We're currently evaluating the vehicle program, but do not have any production announcements to make at this time."
UAW rejects GM contract proposal but makes a counter offer
Tue, Oct 1 2019The United Auto Workers union said a new comprehensive offer made by General Motors Co late Monday to end a two-week-old strike was not acceptable and said it had made a new counterproposal. UAW vice president Terry Dittes said in a letter to members "there are many important issues that remain unresolved." The union is awaiting GM's next proposal. He said GM's offer came up short on many issues. Dittes said GM made a "comprehensive proposal" at 9:40 p.m. Monday. "This proposal that the company provided to us on day 15 of the strike did not satisfy your contract demands or needs. There were many areas that came up short like health care, wages, temporary employees, skilled trades and job security to name a few." Dittes is the union's vice president for GM relations and the UAW's lead negotiator in these contract talks. "We have responded today with a counterproposal and are awaiting GM's next proposal to the union," he wrote. "Regardless of what is publicized in print or social media, etc., there are still many important issues that remain unresolved." The strike, in its third week, has cost GM more than $1 billion, according to J.P. Morgan analyst Ryan Brickman. He said the cost per day in potential profit is $82 million. However, another analysis, by East Lansing-based consultant Anderson Economic Group, put the losses at $25 million a day. And the effects of the strike are expanding. GM said Tuesday the strike has created a parts shortage that forced the automaker to halt production at its pickup and transmission plants in Silao, Mexico, temporarily laying off 6,000 workers. Silao is where GM builds its highly profitable four-door crew cab Chevy Silverado and GMC Sierra pickups. The strike has also forced GM to idle some Canadian workers, and many suppliers have been forced to halt operations. About 48,000 UAW members went on strike on Sept. 16 seeking higher pay, greater job security, a bigger share of the leading U.S. automaker’s profit and protection of their healthcare.Â
