2008 Lt Crew 4x4 Z71 Satellite Trailer Hitch Receiver V8 We Finance 73k Miles on 2040-cars
Vernon, Texas, United States
Engine:8
Vehicle Title:Clear
Fuel Type:Gasoline
For Sale By:Dealer
Transmission:Automatic
Make: Chevrolet
Cab Type (For Trucks Only): Crew Cab
Model: Silverado 1500
Warranty: Vehicle has an existing warranty
Mileage: 73,751
Sub Model: LT Crew Cab
Exterior Color: Red
Disability Equipped: No
Interior Color: Tan
Doors: 4
Drive Train: Four Wheel Drive
Chevrolet Silverado 1500 for Sale
12 chevrolet silverado 1500 4x4 4 door lt z71 leather we finance
2011 chevy silverado reg cab side steps 20" wheels 22k texas direct auto(US $19,980.00)
2009 chevrolet silverado 1500 pickup truck 4.3l v6 auto cold a/c utility boxes
1983 chevy silverado short bed custom wheels new tires custom grill all power(US $7,800.00)
2008 chevrolet silverado 1500 lt extended cab pickup 4-door 5.3l(US $14,500.00)
Save at empire chevy on this all-new 2014 crew cab ltz 2lz gps sunroof 4x4(US $44,988.00)
Auto Services in Texas
Yos Auto Repair ★★★★★
Yarubb Enterprise ★★★★★
WEW Auto Repair Inc ★★★★★
Welsh Collision Center ★★★★★
Ward`s Mobile Auto Repair ★★★★★
Walnut Automotive ★★★★★
Auto blog
Cadillac XT4 crossover to be built in Kansas City
Mon, Jan 8 2018Cadillac's upcoming XT4, a crossover we've previously known as the XT3 in a long series of spy shots of heavily camouflaged mules, will be built at General Motors' assembly plant in Kansas City on the same platform as the Chevrolet Malibu, Bloomberg reports, citing people familiar with the plan. That will give Cadillac another entry in the red-hot luxury crossover segment and, GM hopes, help to reverse a sales slump in the U.S. It'll also breath life into the Kansas City plant that makes the slow-selling Malibu, where GM cut a third shift last year, by sharing the assembly line between the crossover and sedan and defraying costs for each vehicle. The XT4 was known most recently as the XT3, with styling cues based on the Escala concept sedan from 2016. It's slightly smaller than the XT5, Cadillac's top-selling vehicle, and will also augment the full-size Escalade in Cadillac's stable of SUVs when it makes its expected debut later this year. Cadillac last week reported its second-highest-ever sales mark with 356,467 vehicles, an increase of 15.5 percent over 2016. But that mark papers over an 8 percent sales decline in the U.S. to 156,440 vehicles. The luxury brand is on a hot streak in China, where sales jumped 50.8 percent last year to 175,489 units.Related Video: Image Credit: Brian Williams Plants/Manufacturing Cadillac Chevrolet GM Crossover sales cadillac xt5 cadillac xt4 cadillac xt3
GM cutting production at two plants
Thu, Feb 26 2015General Motors is continuing to adjust to excess supply of some of its brands' models. To get production more in line with the vehicles' actual demand, the automotive giant is idling two of its factories in North America in the coming months. The Orion Assembly plant is going to be down from March 9-13, according to an anonymous plant worker and another insider speaking to Automotive News. The factory builds the Chevrolet Sonic and Buick Verano, but there are plenty of both models sitting on dealer lots, including 216 days worth of Sonics, according to AN. The factory already had two idle periods announced to reduce the excess. In addition, downtime is scheduled at GM's "Flex" line at the Oshawa, Ontario, Canada, plant from April 13-17. This affects supply of the Chevrolet Camaro, Impala, Buick Regal and Cadillac XTS. Among them, the automotive giant has the largest supply of Regals ready for dealers with 213 days worth of them, according to AN. The future for the whole Oshawa factory is cloudy in general, though. There are rumors that it could close entirely in the future because the Camaro is leaving and the Regal and XTS might not last much longer than 2017. The Canadian government and the labor union there intend to put up a fight, though. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Cadillac Chevrolet GM orion assembly oshawa plant idle
GM forced to cut truck production amid semiconductor shortage
Thu, Jul 22 2021WASHINGTON — General Motors said Wednesday it will cut some truck production in North America because of the ongoing global semiconductor shortage. The largest U.S. automaker said its Flint Assembly plant that builds the Chevrolet Silverado HD and GMC Sierra HD trucks will operate on one production shift the week of July 26. GM said its Ft. Wayne Assembly plant in Indiana that builds the Chevrolet Silverado 1500 and GMC Sierra 1500 model trucks will be idled next week. GM's Silao Assembly plant in Mexico that also builds the Chevrolet Silverado 1500, Cheyenne (for the Mexico market) and GMC Sierra 1500 will also suspend production next week. All three plants are expected to resume regular production the week of August 2. Related video:
