2000 Chevrolet Silverado Extended Cab Z71 4x4 on 2040-cars
Kirksville, Missouri, United States
Body Type:Pickup Truck
Vehicle Title:Clear
Engine:5.3L 323Cu. In. V8 GAS OHV Naturally Aspirated
Fuel Type:Gasoline
For Sale By:Private Seller
Make: Chevrolet
Model: Silverado 1500
Cab Type (For Trucks Only): Extended Cab
Trim: Base Extended Cab Pickup 4-Door
Options: 4-Wheel Drive, CD Player, Towing Package
Drive Type: 4WD
Safety Features: Anti-Lock Brakes, Driver Airbag, Passenger Airbag
Mileage: 175,000
Power Options: Air Conditioning, Cruise Control, Power Locks, Power Windows
Exterior Color: Red
Interior Color: Black
Number of Cylinders: 8
Number of Doors: 4
This is a used 2000 Chevrolet Silverado Z71 1500 that is a strong runner. It has slight body rust but the body is free of dents and dings. It runs great and the interior is excellent. It also has a towing package. If you have any questions feel free to call or email. Thanks for bidding.
Chevrolet Silverado 1500 for Sale
1979 chevy silverado 4x4, new paint, interior, bedliner, exhaust, tires & wheels(US $10,500.00)
2008 chevrolet silverado ext cab long bed
2007 chevrolet silverado 1500 z71 4x4 auto v8 extended cab 4dr sb(US $13,491.00)
06 silverado ls 4.8l v8, ext cab 4 doors, aut trans, bed liner, no reserve.
We finance, we ship, 6.0l v8, leather, heated bucket seats, hd trailer equipment
1979 chevy silverado pickup chevrolet antique classic longbed
Auto Services in Missouri
Wrench Tech ★★★★★
Valvoline Instant Oil Change ★★★★★
Tint Crafters Central ★★★★★
Riteway Foreign Car Repair ★★★★★
Pevely Plaza Auto Parts Inc ★★★★★
Performance By Joe ★★★★★
Auto blog
Pony cars, trucks and Italian SUVs | Autoblog Podcast #552
Fri, Aug 31 2018On this week's Autoblog Podcast, Editor-in-Chief Greg Migliore is joined by Senior Editor Alex Kierstein and Associate Editor Reese Counts. We discuss the updated 2019 Chevy Camaro Turbo 1LE variant, the new 2019 GMC Sierra Denali, and the Ferrari-powered Maserati Levante GTS. We also debate whether Volkswagen should build the Atlas-based Tanoak pickup truck and what a delay means for the next-gen Ford Mustang. Finally, we answer a reader question about the state of Lexus.Autoblog Podcast #552 Get The Podcast iTunes – Subscribe to the Autoblog Podcast in iTunes RSS – Add the Autoblog Podcast feed to your RSS aggregator MP3 – Download the MP3 directly Rundown 2019 Chevy Camaro Turbo 1LE 2019 GMC Sierra 2019 Maserati Levante GTS Should Volkswagen build the Tanoak? Next-gen Ford Mustang delayed The past, present and future of Lexus Feedback Email – Podcast@Autoblog.com Review the show on iTunes Related Video: Podcasts Chevrolet Ford GM GMC Lexus Maserati RAM Truck Coupe SUV Luxury Performance
Nissan Leaf sells 1,553 in April, Volt climbs to 905
Fri, May 1 2015After three months in the 500 and 600 range, sales of the Chevy Volt climbed to 905 in April. That's up for the year so far – likely due to increasing discounts – but still down 41.5 percent from April 2014. As we've been saying every time the Volt turns in less-than-exciting monthly sales numbers, we suspect a large number of potential Volt buyers are waiting for the next-gen model to arrive in the second half of 2015. While the price for that car has not yet been announced, the updated tech specs show that it will probably be worth the wait for drivers who want the latest and greatest. Over on the Nissan Leaf side of things, April sales were 1,553 units this year. That's the second-best month of the year but down from the 2,088 units sold last April. After the Leaf finally climbed to the top of the cumulative best sellers list for plug-in vehicles last month, the difference between these two leaders is now 1,824 in favor of the Leaf. Nissan says that sales were influenced by the launch of its No Charge To Charge promotion in Indianapolis and Fresno, CA. This deal gives new Leaf buyers and lessees two years of no-cost quick charging in these markets. No Charge To Charge is not available in 15 US markets for (San Francisco, Sacramento, San Diego, Seattle, Portland, Nashville, Phoenix, Dallas-Ft. Worth, Houston, Washington, DC, Los Angeles, Chicago and Atlanta) and will expand to 10 more by the middle of this year. As we do every month, our full wrap-up of US green car sales is coming soon. For now, enjoy discussing these sales figures in the Comments below.
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.