Find or Sell Used Cars, Trucks, and SUVs in USA

1957 Chevrolet Other on 2040-cars

US $2,000.00
Year:1957 Mileage:5334
Location:

Harrah, Oklahoma, United States

Harrah, Oklahoma, United States
Advertising:
Body Type:Coupe
Vehicle Title:Rebuilt, Rebuildable & Reconstructed
Year: 1957
VIN (Vehicle Identification Number): No vin
Mileage: 5334
Number of Seats: 2
Model: Other
Car Type: Classic Cars
Make: Chevrolet
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. See all condition definitions

Auto Services in Oklahoma

Xtreme Lube ★★★★★

Auto Repair & Service, Auto Oil & Lube
Address: 8613 N Council Rd, The-Village
Phone: (405) 384-5823

Wesco Classic Chevy Parts ★★★★★

Automobile Body Repairing & Painting, Automobile Parts & Supplies, Automobile Restoration-Antique & Classic
Address: 825 N Portland Ave, Edmond
Phone: (405) 943-9859

Weaver Brothers Garage ★★★★★

Auto Repair & Service
Address: 3540 NW 39th St, Oklahoma-City
Phone: (405) 942-4424

Skyyline Dent & Hail Repair ★★★★★

Automobile Body Repairing & Painting, Dent Removal
Address: 9301 S Sunnylane Rd, Bethany
Phone: (405) 664-2033

Schulte Automotive & Radiator ★★★★★

Auto Repair & Service
Address: 701 SW 59th St, Bethany
Phone: (405) 635-8888

Ricky`s Body & Glass ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Automobile Parts & Supplies
Address: 202 N Lakeside Dr, Eagletown
Phone: (870) 642-2811

Auto blog

Chevy Bolt officially keeping name, says marketing boss

Thu, Apr 16 2015

There might be just a little confusion at first, but the Bolt name is sticking around. After conducting two consumer studies into the name, Chevrolet isn't worried about the similarity of the monikers for the upcoming EV and existing Volt plug-in hybrid. In fact, the brand thinks the resemblance might be for the best. "The decision is made. The name won't be changed." Chevy head of marketing Tim Mahoney said to The Detroit Free Press. The research shows that the compatibility between the two names actually works quite well. With the Volt well established, people apparently already connect the Bolt to the Bowtie, which is just what a brand wants. Both studies indicated the ""same result, it did well," according to Mahoney. Just a few months ago, the future of the Bolt's name wasn't so clear. GM North America President Alan Batey said the company knew there might be confusion, and it was still mulling its options. The Bolt could be a breakthrough in the EV market with a 200-mile range and a possible price of around $30,000 after incentives. Production is set for the Orion Assembly plant in Michigan following a $200 million upgrade there, and the model could be in dealers as soon as 2017. That's just in time to take on the Tesla Model 3 with its claimed $35,000 price and similar driving distance as the Chevy. Related Video:

2015 Chevy Silverado, GMC Sierra recalled for steering issues

Thu, Sep 13 2018

DETROIT — General Motors Co is recalling more than 1 million pickup trucks and sport utility vehicles in the United States due to issues with a temporary loss of power steering, the National Highway Traffic Safety Administration said. The recall is for 2015 models. They are: the Chevy Silverado 1500, Suburban and Tahoe, GMC Sierra 1500, Yukon and Yukon XL and Cadillac Escalade. The problem may cause difficulty steering the vehicle, especially at low speeds, increasing the risk of a crash, the auto safety regulator said in a document dated Sept. 12. The document did not highlight any reports of accidents and injuries, because of the power steering issue. GM dealers will update the power steering module software, free of charge for owners of the affected vehicles. In 2014, the No.1 U.S. automaker had recalled nearly 800,000 pickup trucks worldwide because of the same problem. GM did not immediately respond to a request for comment.Related Video:

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.