Find or Sell Used Cars, Trucks, and SUVs in USA

1956 Chevrolet Panel Project on 2040-cars

US $2,750.00
Year:1956 Mileage:999999
Location:

Ocean Park, Washington, United States

Ocean Park, Washington, United States
Advertising:
Vehicle Title:Clear
For Sale By:Private Seller
Engine:V8
VIN: 3A56L014343 Year: 1956
Drive Type: 2WHEEL DRIVE
Make: Chevrolet
Mileage: 999,999
Model: Other Pickups
Trim: PANEL
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. ... 

1956 CHEV PANEL. BODY IS VERY SOLID FOR ITS AGE. STILL ITS ORIGINAL FOREST SERVICE GREEN. THE TRUCK HAS BEEN STORED INSIDE FOR A LONG TIME. THE RUST SHOWN IN PICS IS MOSTLY SURFACE. THE CARGO AREA IS IN GREAT SHAPE.IT DOES NEED A PASSENGER FLOOR PATCH. IT ALSO NEEDS A LITTLE LOVE AROUND RR TAIL LIGHT AREA. I HAVE A 71 350/350 THAT GOES WITH IT, ALSO A TILT STEERING COLUMN, STRAIGHT REAR BUMPER AND A FEW OTHER MISC. PARTS. IT HAS A-ARM FRONT SUSPENSION WITH DISC BRAKES OFF A 81 VAN(IM TOLD). $2,750.00

Auto Services in Washington

Wrench-N-Time Quality Auto ★★★★★

Auto Repair & Service, Automobile Electric Service
Address: 800 Grand Blvd, Vancouver
Phone: (360) 695-6526

Wesco Autobody Supply Inc ★★★★★

Automobile Body Repairing & Painting, Automobile Parts & Supplies, Automobile Body Shop Equipment & Supply-Wholesale & Manufacturers
Address: 13900 NE 20th St, Preston
Phone: (425) 746-9970

Tiny`s Tire Factory ★★★★★

Auto Repair & Service, Tire Dealers, Brake Repair
Address: 10805 Pacific Ave S, University-Place
Phone: (253) 531-4535

Taylors Mobile RV & Auto Service ★★★★★

Auto Repair & Service, Trailers-Repair & Service, Recreational Vehicles & Campers-Repair & Service
Address: South-Prairie
Phone: (253) 306-6493

Tayag`s Auto Repair ★★★★★

Auto Repair & Service
Address: 6185 4th Ave S, Southworth
Phone: (206) 767-7008

Specialty Motors ★★★★★

Auto Repair & Service, Brake Repair
Address: 12517 15th Ave NE, Kingston
Phone: (206) 367-4403

Auto blog

GM's redesigned full-size 2021 SUVs face delay over coronavirus

Tue, Mar 31 2020

As General Motors works to conserve cash for the coronavirus pandemic, the automaker reportedly told suppliers that it is postponing development of several future vehicles. The situation may cause GM to delay the launch of the 2021 Cadillac Escalade, GMC Yukon, Chevrolet Tahoe and Chevrolet Suburban SUVs, which had been planned to roll out in April. The original launch plan for the redesigned full-size SUVs, which are some of the most profitable vehicles produced by GM, had called for production of the current models to end at its plant in Arlington, Texas, this week. After a retooling process, the redesigned SUVs were slated to begin production late in the month of April. In an email to suppliers viewed by Reuters and confirmed as authentic by GM, the automaker also said it was suspending development work on six future vehicle programs, including updates of the Chevrolet Equinox, GMC Terrain, Cadillac XT4, Bolt EV, Chevrolet Silverado and GMC Sierra. GM said preproduction work on those programs would be pushed back to calendar year 2021, with most of the updated vehicles scheduled to be launched as 2022 models. According to the Detroit News, work has also been paused on the Chevy Camaro and a future version of the Corvette that has yet to be unveiled and wasn't planned for production during the 2020 calendar year. Last week, the automaker told employees and suppliers it was delaying work on some future vehicles while pushing ahead with near-term models such as its redesigned full-size SUVs and the GMC Hummer EV, Cadillac Lyriq, Chevrolet Bolt EUV and Cruise Origin, as well as its new Ultium battery system. A GM spokesman who spoke with Reuters reiterated on Monday what the automaker had said last week — that the situation with its U.S. plants was "fluid" and that the automaker would "continue to evaluate" whether and when to reopen those plants on a week-by-week basis, with "employee safety" guiding that decision. GM said previously that it was closing most of its U.S. plants indefinitely. In its Monday email, GM asked suppliers to stop work on all pre-production tooling and pre-production parts manufacturing, but also not to dispose of any tooling or materials. GM told Reuters it had solicited volunteers from its workforce to finish the build-out of the current SUVs on a single shift in Arlington.

Tarantino's stolen Chevy Malibu from Pulp Fiction recovered after 19 years [w/video]

Mon, 29 Apr 2013

Quentin Tarantino fans will likely remember Vincent Vega's cherry 1964 Chevrolet Malibu Convertible in Pulp Fiction. In a movie drenched in automotive references, the Malibu is very nearly a character in and of itself, and it serves as the subject of Vega's soliloquy about the kind of man who vandalizes another's automobile. It also happened to be Tarantino's personal car when the film was shot, and was apparently stolen shortly after production wrapped. Now police have located the car some 19 years later.
As it turns out, the thieves cloned the vehicle identification number from another '64 Malibu and had the car registered under the new digits. It was then sold to an unsuspecting buyer. Police happened upon the duplicate VINs while investigating another potential theft. Right now, it's unclear whether Tarantino has taken possession of the Chevrolet, if it has remained in the possession of the fraud victim, or whether it's caught somewhere in the gears of justice. Either way, you can catch Vega's memorable thoughts on the car keying in the Pulp Fiction clip below. But consider yourself warned: the video contains explicit language as Not Safe For Work as it comes.

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.