1948 Chev Pick Up Street Rod on 2040-cars
King of Prussia, Pennsylvania, United States
| ||||||||
Chevrolet Other Pickups for Sale
1946 chevy pickup 1/2 ton
1948 chevy 3600 flatbed truck - reserved lowered
1957 chevy 3100 truck 4x4(US $28,500.00)
1958 chevrolet truck,shop truck,rat rod truck,hot rod truck,patina truck,rat rod(US $3,000.00)
1995 chevy pickup new 5.7 motor low mileage 4x4 k-1500(US $3,300.00)
1950 chevrolet 3100 chevy 1/2 ton pickup 3 window
Auto Services in Pennsylvania
Wrek Room ★★★★★
Wolbert Auto Body and Repair ★★★★★
Warren Auto Service ★★★★★
Ultimate Auto Body & Paint ★★★★★
Ulrich Sales & Service ★★★★★
Tower Auto Sales Inc ★★★★★
Auto blog
The real costs of keeping a Chevy Volt on the road
Wed, Sep 2 2015The release of the new, 2016 Chevy Volt is sure to bring a surge of used electric vehicles to the market as early adopters trade their older models in. Many of these cars are selling for a fraction of their original price, thanks in part to federal and state incentives that lowered the initial cost to the first owner, which opens these cars up to a whole new class of consumers. While the prices are getting attractive, potential buyers are still hesitant to buy a used EV due to uncertainty about service and repair costs, but there may be some good news on the horizon. The Chevy Volt comes with a battery warranty that is good for at least 8 years and 100,000 miles, but many of the Volts popping up on the market have passed that 100,000-mile mark. The threat of needing a new battery can be a deterrent, especially with some dealers quoting prices as high as $34,000 for a full "drive motor battery replacement." That sum is more than the MSRP of a 2016 model. Some of the fear of EV maintenance and repair comes from the mystery of the individual pieces that make up the drivetrain and charging system. If we take a look at the Volt in terms of analogs to a traditional internal-combustion vehicle, the outlook becomes a little more friendly. The Volt battery pack consists of three lithium-ion modules in a T-shaped arrangement, each of which can be serviced individually. Module 1 is made up of 90 cells and corresponds to GM part number 22954462, which retails for $3,258.33; module 2 is made up of 72 cells and corresponds to GM part number 22954463, which retails for $2,930.00; lastly, module 3 is made up of 125 cells and corresponds to GM part number 22954464, and retails for $4,933.33. These part numbers have been added to the dealer order systems but have not shown up in the distribution centers at this time. Although all three of the modules add up to a fairly large $11,121.66 total and are still on hold for dealer ordering, the good news is that in most cases these battery cell modules do not need to be replaced. There are many other individual pieces mounted on the battery pack that are serviceable, such as the Battery Energy Control Modules (BECM) and the Battery Interface Control Modules (BICM). These modules control and monitor the battery packs and charging system and have been known to fail while the lithium-ion battery cells are not at fault. Some have been replaced under warranty, but if you are stuck buying one they run about $255 a piece for the part.
Chevy Volt gets customer satisfaction 'recall' for rear hatch issue *UPDATE*
Mon, Jan 26 2015Last week, General Motors has issued a "Customer Satisfaction program" for some 2011-2015 model year Chevrolet Volts to fix the manual rear lift gate not working as appropriate. According to Volt owner posts on Facebook, the problem manifests itself by the hatch not opening up all the way (sometimes worse in the cold) with some people bumping their heads. Dealers will replace the lift gate struts as part of the program. Some drivers were notified through the vehicle's OnStar system that there is a problem. GM has not yet said how many Volts are affected. *UPDATE* This program is for all 2011-2015 model year Volts. Chevrolet spokesperson Michelle Malcho told AutoblogGreen that, "This is not a recall, so there won't be any formal information posted on the GM website." The fixes will be free to affected Volt owners. Some 2010-2015 Cadillac SRX vehicles are also affected by the same problem and will also be fixed. Featured Gallery 2011 Chevrolet Volt: Review View 22 Photos News Source: General Motors via Transport Evolved Green Recalls Chevrolet Electric Hybrid customer satisfaction
GM pickup truck plant in Flint to add 1,000 assembly workers
Tue, Feb 5 2019FLINT, Mich. — General Motors said Tuesday it will add 1,000 workers to build new heavy-duty pickup trucks at its plant in Flint, Michigan, and will give priority to GM workers who were laid off elsewhere. The announcement comes the day after GM said it was starting to hand pink slips to about 4,000 salaried workers in the latest round of a restructuring announced in late November that will ultimately shrink its white-collar workforce in North America by 15 percent out of 54,000. GM has come under fire from U.S. President Donald Trump and Midwestern lawmakers for its plans to stop production at five North American factories and cut up to 15,000 jobs in all. The automaker has said it is trying to find new jobs for 1,500 U.S. hourly workers at the affected plants. Flint's truck plant could be a haven for many of these employees. Sales of heavy-duty pickups in the United States have grown to more than 600,000 vehicles a year, up more than 20 percent since 2013, according to industry data. Prices for luxury models can easily top $70,000. GM on Tuesday will celebrate the launch of a new generation of heavy-duty GMC and Chevrolet pickups at the assembly plant in Flint, Michigan, that is now building all such trucks for the company. Elsewhere in the company on Monday, two people briefed on the cuts in the white-collar salaried workforce said GM is cutting hundreds of jobs at its information technology centers in Texas, Georgia, Arizona and Michigan and more than 1,000 jobs at its Warren, Michigan Tech Center. GM is filing new required mass layoff notices with state agencies and disclosed the cuts to lawmakers. The largest U.S. automaker announced in November it would cut a total of about 15,000 jobs and end production at five North American plants. The cuts include eliminating about 8,000 salaried workers, or about 15 percent. GM cut about 1,500 contract workers in December and said 2,300 salaried workers accepted buyouts, officials said. "These actions are necessary to secure the future of the company, including preserving thousands of jobs in the U.S. and globally. We are taking action now while the overall economy and job market are strong, increasing the ability of impacted employees to continue to advance in their careers, should they choose to do so," GM spokesman Pat Morrissey said, adding the bulk of the cuts should be completed in the next two weeks. Morrissey said GM would provide salaried workers with severance packages and job placement services.