Find or Sell Used Cars, Trucks, and SUVs in USA

62 Chevy 2 Nova Rolling Chassis, Ex Racecar on 2040-cars

US $3,800.00
Year:1962 Mileage:1
Location:

Saint Augustine, Florida, United States

Saint Augustine, Florida, United States
Advertising:


x race car. no motor. has a turbo 350 transmission, 10 inch converter, New Yukon 3.73 postreaction rear-end. Headers and 4 inch flow masters. racing steering column, bucket seats, B and M shifter, Clear title, floors in good shape, new gas tank , fuel line , sending unit, traction bars, truck mount battery, Race car or street car, needs a motor and some break work. 3,800 firm NO TRADES.
Tires are also good. Contact Dave at 904 501 2488 Day , evening 904 687 0171

Auto Services in Florida

Zip Auto Glass Repair ★★★★★

Auto Repair & Service, Windshield Repair, Glass-Auto, Plate, Window, Etc
Address: 213 US Highway 41 Byp S, Venice
Phone: (888) 463-0379

Willie`s Paint & Body Shop ★★★★★

Automobile Body Repairing & Painting
Address: 4114 Park Lake St, Goldenrod
Phone: (407) 895-8850

Williamson Cadillac Buick GMC ★★★★★

Auto Repair & Service, New Car Dealers, Automobile Body Repairing & Painting
Address: 7815 SW 104th St, Perrine
Phone: (305) 548-8816

We Buy Cars ★★★★★

Used Car Dealers, Automobile Salvage, Automobile & Truck Brokers
Address: 10222 NW 80th Ave, Miami-Lakes
Phone: (305) 823-4045

Wayne Akers Truck Rentals ★★★★★

New Car Dealers, Truck Rental, Car Rental
Address: 1900 10th Ave N, Atlantis
Phone: (561) 693-3196

Valvoline Instant Oil Change ★★★★★

Auto Repair & Service, Auto Oil & Lube, Automotive Tune Up Service
Address: 5928 SE Abshier Blvd, Summerfield
Phone: (352) 307-2356

Auto blog

GM recalls half-million full-size SUVs to address seatbelt issue

Tue, Aug 16 2022

GM is recalling its redesigned full-size SUV models to address improperly riveted mounts securing the third-row seatbelts that may fail in the event of an accident. The population includes the 2021-2022 Cadillac Escalade and Escalade ESV, 2021-2022 Chevrolet Suburban and Tahoe, and 2021-2022 model year GMC Yukon and Yukon XL, for a total of 484,155 vehicles. "Operators at the supplier’s manufacturing plant may have not properly followed manufacturing processes and inadvertently missed the rivet forming operation," GM said in its defect report to NHTSA. "In certain of these vehicles, the rivet that retains the buckle to the mounting bracket in the left or right side third-row seatbelt buckle assembly may not have been properly formed during the manufacturing process. If the third-row seatbelt assembly is not properly riveted, it may not properly restrain occupants in a crash, increasing the risk of injury." Fortunately, the fix is relatively simple. GM service technicians will inspect the rivets on the rear seatbelt buckle assemblies and replace the entire unit if the rivets are not to spec. Dealer notifications have already been distributed; owners should receive notice start in September. Related video: Cadillac Chevrolet GM GMC Ownership Safety SUV

GM invests $175 million in Chevy Camaro factory

Thu, May 28 2015

General Motors just keeps rolling out portions of its $5.4-billion plan for factory upgrades over the next three years. In the latest announcement, the automotive giant is putting $175 million into the Lansing Grand River Assembly Plant for improvements to build the 2016 Chevrolet Camaro. The investment brings new equipment to the plant to build the pony car. An upgrade is needed to support Camaro-specific colors like Summit White, Bright Yellow, and Red Hot, and the factory is also getting two robotic framers. A second shift of 500 workers is resuming in Lansing later this summer to produce the model, as well. So far, GM has announced allocations for $2.8 billion of the $5.4 billion in upgrades. The investments include $1.2 billion to improve pickup production, $439 million for a paint shop for the Corvette, and more new equipment at other plants too. Lansing Grand River Plant Tools Up for 2016 Camaro $175 million investment enables production of lighter, more powerful model 2015-05-28 LANSING, Mich. – A $175 million investment for new tooling and equipment for the sixth-generation Chevrolet Camaro, and the return of hundreds of workers to build America's best-selling performance car for the last five years, was announced today. The facility improvements include three new paint systems for Camaro-specific colors: Summit White, Bright Yellow, and Red Hot. The investment also includes installation of two robotic framers, which allow better dimensional control to provide a more precise drive experience. The Lansing Grand River Assembly Plant will resume a second shift of 500 jobs in late summer. The all-new Chevrolet Camaro was introduced on Detroit's Belle Isle on May 16. The current generation Camaro has been America's favorite performance car for five consecutive years, attracting both long-term Camaro fans and new buyers to Chevrolet. To improve on that success, the sixth-generation Camaro elevates every aspect of Camaro with a suite of new technologies, even higher levels of performance and fuel economy, and a leaner, more athletic design. "I may be the luckiest mayor in America today," said Lansing Mayor Virg Bernero. "Gearing up for full-scale production of the legendary Chevy Camaro is a new high point in the more than two decades of extraordinary partnership between the City of Lansing, General Motors and the UAW.

LG Chem's troubled Chevy Volt battery plant hiring once again

Thu, Sep 25 2014

The Michigan battery plant known for paying its workers to do nothing has turned things around and is now hiring more workers, specifically to do something. South Korea-based LG Chem, which runs the factory to supply the Chevrolet Volt extended-range plug-in vehicle with its lithium-ion batteries, held a job fair recently to bring on 40 new employees in order to meet higher battery demand, according to WZZM, the ABC affiliate for Grand Rapids, MI. The LG Chem factory is in Holland, MI, about 30 miles west of Grand Rapids, and it made its first batteries last year. Prior to that, though, the factory gained notoriety after a US Department of Energy (DOE) probe found that workers there were getting paid to do, well, nothing. That's because demand for the battery packs was so low that it cost less for the plant to sit idle. The DOE was conducting the probe because of its financial grant to LG Chem. But that was then and today is today. LG Chem is looking to ramp up production in advance of the second-generation Volt. That 2016 model-year version is said to have a longer all-electric range and better performance and will ride on a new chassis, but few official details have surfaced. We will know more when we get our first look at the car at the Detroit Auto Show in January.