Find or Sell Used Cars, Trucks, and SUVs in USA

1966 Chevy Nova Ss on 2040-cars

US $85,000.00
Year:1966 Mileage:0
Location:

Valentine, Nebraska, United States

Valentine, Nebraska, United States
Advertising:
Engine:555 ci Dart Block
Vehicle Title:Clear
VIN: XXXXXX Year: 1966
Make: Chevrolet
Drive Type: 2wd
Model: Nova
Mileage: 0
Trim: 2 Door
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. ... 

Auto Services in Nebraska

Troy`s Automotive ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Tires-Wholesale & Manufacturers
Address: 1329 Dawes Ave, Davey
Phone: (402) 477-7182

Rojam Machine ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Automobile Machine Shop
Address: 8520 G St, Waterloo
Phone: (402) 593-9803

Parkway 66 Service ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Brake Repair
Address: 4749 Normal Blvd, Roca
Phone: (402) 423-7711

Ming Auto Beauty Center ★★★★★

Auto Repair & Service, Automobile Detailing
Address: 5601 S 56th St, Hickman
Phone: (402) 421-3634

Lakeside Auto Recyclers ★★★★★

Automobile Parts & Supplies, Automobile Salvage, Used & Rebuilt Auto Parts
Address: 907 Locust St, Papillion
Phone: (712) 347-6561

CARSTAR Glenn`s Body Shop ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting
Address: 2051 K St, Papillion
Phone: (402) 475-8441

Auto blog

GM's latest production delays: Colorado/Canyon, Cadillac CT4/CT5, Camaro

Wed, Mar 24 2021

DETROIT — General Motors Co extended production cuts in North America on Wednesday due to a worldwide semiconductor chip shortage that has impacted the auto sector. The U.S. automaker said its Wentzville, Missouri, assembly plant would be idled during the weeks beginning March 29 and April 5. It will extend down time at its plant in Lansing, Michigan, which has been idled since March 15, by two weeks. The action was factored into GM's prior forecast that it could shave up to $2 billion off this year's profit, spokesman David Barnas said. GM did not disclose how much volume would be lost by the move, but said it intended to make up as much lost production as possible later in the year. The chip shortage came as North American auto plants were shut for two months during the COVID-19 pandemic last year and chip orders were canceled, and as demand surged from the consumer electronics industry as people worked from home and played video games. That's now left carmakers competing for chips. Semiconductors are used extensively in cars, including to monitor engine performance, manage functions for everything from steering to automatic windows, and in sensors used in parking and entertainment systems. Vehicles affected by the GM production cuts include the mid-sized pickup trucks, the Chevrolet Colorado and GMC Canyon in Missouri, and the Cadillac CT4 and CT5 and Chevy Camaro cars in Michigan. Meanwhile, GM said its San Luis Potosi, Mexico, assembly plant, idled since Feb. 8, will resume production with two shifts beginning the week of April 5. Last week, GM said it was building certain 2021 light-duty full-size pickups without a fuel management module, hurting their fuel economy performance by one mile per gallon. Exacerbating the shortage is a recent fire at a Renesas Electronics chip plant in Japan. Barnas said GM was assessing the impact of the fire.  

GM to invest $150 million in Flint to boost heavy-duty pickup production

Thu, Jun 13 2019

FLINT, Mich. — General Motors President Mark Reuss said on Wednesday that the automaker is investing about $150 million at its Flint Assembly plant in Michigan to boost production of heavy duty trucks by another 40,000 vehicles a year. Reuss announced the investment at the Flint truck assembly plant wearing a United Auto Workers pin. The Detroit automaker had announced back in February it was adding 1,000 jobs in Flint to build a new generation of heavy-duty pickup trucks. GM did not say that the latest investment would add more jobs at the plant, but Reuss said there could be opportunities to add workers as the launch of the automaker's new trucks progresses. GM has been under pressure from President Donald Trump and lawmakers of both parties to add jobs in the United States after it said last November it would idle the Chevy Cruze assembly plant in Lordstown, Ohio, and likewise had no new products for three other U.S. manufacturing plants. The Flint investment will include upgrades to the plant's conveyors and other new tooling, and will be completed in the first half of 2020. GM has invested more than $1.6 billion in the plant since 2013. Last month, GM said it would invest $24 million to increase truck production at its assembly plant in Fort Wayne, Indiana, which makes Chevrolet Silverado and GMC Sierra models. Sales of heavy-duty pickups in the United States have grown to more than 600,000 vehicles a year, up more than 20 percent since 2013, according to industry data. Prices for luxury models can easily top $70,000. GM's Chevrolet and GMC brands have long trailed Ford's F-series heavy duty trucks in the lucrative segment. The new Chevrolet and GMC heavy duty trucks have been re-engineered to tow heavier trailers, and keep pace in what has become an arms race among the Detroit Three automakers to claim superior torque and towing capability. Related: Silverado HD vs. 2019 Ram, Ford heavy duty trucks: How they compare on paper

GM invests $175 million in Chevy Camaro factory

Thu, May 28 2015

General Motors just keeps rolling out portions of its $5.4-billion plan for factory upgrades over the next three years. In the latest announcement, the automotive giant is putting $175 million into the Lansing Grand River Assembly Plant for improvements to build the 2016 Chevrolet Camaro. The investment brings new equipment to the plant to build the pony car. An upgrade is needed to support Camaro-specific colors like Summit White, Bright Yellow, and Red Hot, and the factory is also getting two robotic framers. A second shift of 500 workers is resuming in Lansing later this summer to produce the model, as well. So far, GM has announced allocations for $2.8 billion of the $5.4 billion in upgrades. The investments include $1.2 billion to improve pickup production, $439 million for a paint shop for the Corvette, and more new equipment at other plants too. Lansing Grand River Plant Tools Up for 2016 Camaro $175 million investment enables production of lighter, more powerful model 2015-05-28 LANSING, Mich. – A $175 million investment for new tooling and equipment for the sixth-generation Chevrolet Camaro, and the return of hundreds of workers to build America's best-selling performance car for the last five years, was announced today. The facility improvements include three new paint systems for Camaro-specific colors: Summit White, Bright Yellow, and Red Hot. The investment also includes installation of two robotic framers, which allow better dimensional control to provide a more precise drive experience. The Lansing Grand River Assembly Plant will resume a second shift of 500 jobs in late summer. The all-new Chevrolet Camaro was introduced on Detroit's Belle Isle on May 16. The current generation Camaro has been America's favorite performance car for five consecutive years, attracting both long-term Camaro fans and new buyers to Chevrolet. To improve on that success, the sixth-generation Camaro elevates every aspect of Camaro with a suite of new technologies, even higher levels of performance and fuel economy, and a leaner, more athletic design. "I may be the luckiest mayor in America today," said Lansing Mayor Virg Bernero. "Gearing up for full-scale production of the legendary Chevy Camaro is a new high point in the more than two decades of extraordinary partnership between the City of Lansing, General Motors and the UAW.