Find or Sell Used Cars, Trucks, and SUVs in USA

Lt New 2.5l Cd Cocoa/light Neutral Leather-appointed Seat Trim Power Steering on 2040-cars

Year:2014 Mileage:0 Color: White /
 Other
Location:

Mac Haik Chevrolet11750 Katy FreewayHouston, TX 77079

Mac Haik Chevrolet11750 Katy FreewayHouston, TX 77079
Advertising:
Transmission:Automatic
Body Type:Sedan
Vehicle Title:Clear
Fuel Type:Gasoline
For Sale By:Dealer
VIN: 1G11E5SL5EF114051 Year: 2014
Make: Chevrolet
Model: Malibu
Warranty: Unspecified
Mileage: 0
Sub Model: LT
Options: CD Player
Exterior Color: White
Power Options: Power Windows
Interior Color: Other
Number of Cylinders: 4
Condition: New: A vehicle is considered new if it is purchased directly from a new car franchise dealer and has not yet been registered and issued a title. New vehicles are covered by a manufacturer's new car warranty and are sold with a window sticker (also known as a “Monroney Sticker”) and a Manufacturer's Statement of Origin. These vehicles have been driven only for demonstration purposes and should be in excellent running condition with a pristine interior and exterior. See the seller's listing for full details.  ... 

Auto blog

GM delaying additional Silverado EV and Sierra EV production to Q4 2025

Tue, Oct 17 2023

This looks like more "Gotcha!" news about storms in the EV sector, but the word "additional" is key here. The Detroit News reported today that GM is pushing delaying production of the Chevrolet Silverado EV and GMC Sierra EV pickups at the Orion Assembly Plant to late 2025, about a year behind expectations. The Silverado EV Work Truck is already in production at GM's Factory Zero in Detroit, which won't change. Retail versions of the Silverado EV are still planned for production at Factory Zero before the end of this year, and the Sierra EV is expected to enter production at Factory Zero early next year. This new plan simply means GM won't add more production of those electric trucks at Orion.  GM builds the Chevrolet Bolt at Orion right now, assembly of that groundbreaking car to end this year. GM's original idea was to spend $4 billion to convert Orion to EV pickup production in time to get its two giant profit makers rolling down lines in early 2025. The move to late 2025 could mean the plant is out of commission for about two years. The facility's 1,261 employees are being offered spots in other plants, including Factory Zero.  The automaker gave several reasons for the move, a spokesperson telling The Detroit News the company wants "to better manage capital investment while aligning with evolving EV demand," and telling the Detroit Free Press, "We're looking at EV demand and the trendline for EVs is stabilizing. ... It is not rising as fast as originally forecasted." On top of that, engineers "have identified engineering improvements that we will implement to increase the profitability of our products." The spokesperson also made it clear that the delay has nothing to do with the UAW strike, now in its 32nd day.  Factory Zero's working up to a near-term production capacity of about 600,000 units annually, GM saying it wanted to get capacity to 1 million EVs annually by the end of 2025. At the moment, the site builds the Silverado EV Work Truck, the GMC Hummer EV pickup and SUV, and the Cruise Origin shuttles — not the Bolt taxis, the autonomous pods. The Detroit News reported GM sold 18 Silverado EV Work Trucks in Q3 this year, GM Authority says GMC Hummer EV production has ramped up to about 3,000 units per month, and Cruise Origin is still waiting on approval from the National Highway Safety Traffic Administration to mass-produce the autonomous shuttles because the shuttles need an exemption for not having steering wheels.

GM extends vehicle production cuts into mid-March due to global chip shortage

Tue, Feb 9 2021

DETROIT — General Motors said on Tuesday it was extending production cuts at three North American plants until at least mid-March due to the global semiconductor chip shortage, while vehicles at two other factories would only be partially built. GM, whose shares dipped 1% after the announcement, did not disclose the impact volumes or say which supplier and vehicle parts were affected by the chip shortage. But it said it would focus on keeping production running at plants building its highest-profit vehicles, full-size pickup trucks and SUVs. GM said it intended to make up as much lost production as possible once the shortage chip eased. "Semiconductor supply remains an issue that is facing the entire industry. GM's plan is to leverage every available semiconductor to build and ship our most popular and in-demand products," GM spokesman David Barnas said. GM said it was extending downtime at its U.S. plant in Fairfax, Kansas, its Canadian factory in Ingersoll, Ontario, and its Mexican facility in San Luis Petosi until mid-March when it would reassess the situation, he said. In addition, GM would build but leave incomplete for final assembly vehicles at Wentzville, Missouri, and its Mexican plant at Ramos Arizpe. GM vehicles affected by the idled plants include the Chevrolet Malibu sedan, Cadillac XT4 SUV, Chevy Equinox, and GMC Terrain SUVs. Vehicles to be left incomplete for now included the Chevy Colorado, GMC Canyon pickups and Chevy Blazer SUV. This week, GM had said it was idling the three factories where it has now extended downtime and said it would halve production at a plant in South Korea. The chip shortage has affected many automakers, including Toyota, Volkswagen, Stellantis, Ford, Renault, Subaru, Nissan, Honda and Mazda. Asian chipmakers are rushing to boost production but say the supply gap will take many months to plug. German chipmaker Infineon said the shortage would get worse in the near term. The chip shortage is expected to cut global output in the first quarter by more than 670,000 vehicles and last into the third quarter, IHS Markit said. AutoForecast Solutions estimated total lost production this year could reach 1 million vehicles. Honda and Nissan said on Tuesday they would sell 250,000 fewer cars in total this financial year due.

The Corvette Museum sinkhole has been filled

Wed, Feb 11 2015

After swallowing eight of the most prized pieces of the collection from the National Corvette Museum, the massive sinkhole from a year ago is rapidly becoming nothing but a bad memory. Based on the museum's weekly construction update, you can barely see the remnants of the 25-foot deep hole once in the floor. The Corvette Museum's Skydome was not always going to look like this. The original hope was to keep the sinkhole there as a tourist attraction. That plan eventually fell through, though, and instead it was decided five of the less-damaged Corvettes would remain unrestored. Progress has been moving fast to get the repairs done. Even a month ago, the hole was still very visible, and the construction company used remote-controlled Bobcat loaders to fill it in. Now, the museum has launched a contest to guess how many tons of stone it took to fill in the massive crater. The winner gets a print of the 2009 Corvette ZR1 Blue Devil being lifted out. Related Gallery National Corvette Museum Car Recovery View 25 Photos News Source: Corvettemuseum via YouTubeImage Credit: National Corvette Museum Weird Car News Chevrolet GM Videos National Corvette Museum