2011 Chevrolet Malibu 2lt on 2040-cars
8315 E Us Highway 36, Avon, Indiana, United States
Engine:2.4L I4 16V MPFI DOHC
Transmission:6-Speed Automatic
VIN (Vehicle Identification Number): 1G1ZD5E19BF120219
Stock Num: B800211
Make: Chevrolet
Model: Malibu 2LT
Year: 2011
Exterior Color: Red Jewel Tintcoat
Interior Color: Ebony
Options: Drive Type: FWD
Number of Doors: 4 Doors
Mileage: 50969
Thank you for visiting another one of Bart's Car Store - Avon's exclusive listings! 100% CARFAX guaranteed! 100% AutoCheck guaranteed! At Bart's Car Store - Avon, no matter what vehicle you are looking for, we can find it for you. "Use your SMARTS and buy at BART'S"
Chevrolet Malibu for Sale
2012 chevrolet malibu 1lt
2011 chevrolet malibu 2lt(US $15,800.00)
2014 chevrolet malibu 1lt(US $24,435.00)
2014 chevrolet malibu 1ls(US $23,665.00)
2014 chevrolet malibu 1lt(US $24,435.00)
2014 chevrolet malibu 1lt(US $24,435.00)
Auto Services in Indiana
Westfalls Auto Repair ★★★★★
Trinity Body Shop ★★★★★
Tri-County Collision Center & Towing ★★★★★
Tom O`Brien Chrysler Jeep Dodge Ram-In ★★★★★
TJ`s Auto Salvage ★★★★★
Tire Central and Service Southern Plaza ★★★★★
Auto blog
GM invests $175 million in Chevy Camaro factory
Thu, May 28 2015General Motors just keeps rolling out portions of its $5.4-billion plan for factory upgrades over the next three years. In the latest announcement, the automotive giant is putting $175 million into the Lansing Grand River Assembly Plant for improvements to build the 2016 Chevrolet Camaro. The investment brings new equipment to the plant to build the pony car. An upgrade is needed to support Camaro-specific colors like Summit White, Bright Yellow, and Red Hot, and the factory is also getting two robotic framers. A second shift of 500 workers is resuming in Lansing later this summer to produce the model, as well. So far, GM has announced allocations for $2.8 billion of the $5.4 billion in upgrades. The investments include $1.2 billion to improve pickup production, $439 million for a paint shop for the Corvette, and more new equipment at other plants too. Lansing Grand River Plant Tools Up for 2016 Camaro $175 million investment enables production of lighter, more powerful model 2015-05-28 LANSING, Mich. – A $175 million investment for new tooling and equipment for the sixth-generation Chevrolet Camaro, and the return of hundreds of workers to build America's best-selling performance car for the last five years, was announced today. The facility improvements include three new paint systems for Camaro-specific colors: Summit White, Bright Yellow, and Red Hot. The investment also includes installation of two robotic framers, which allow better dimensional control to provide a more precise drive experience. The Lansing Grand River Assembly Plant will resume a second shift of 500 jobs in late summer. The all-new Chevrolet Camaro was introduced on Detroit's Belle Isle on May 16. The current generation Camaro has been America's favorite performance car for five consecutive years, attracting both long-term Camaro fans and new buyers to Chevrolet. To improve on that success, the sixth-generation Camaro elevates every aspect of Camaro with a suite of new technologies, even higher levels of performance and fuel economy, and a leaner, more athletic design. "I may be the luckiest mayor in America today," said Lansing Mayor Virg Bernero. "Gearing up for full-scale production of the legendary Chevy Camaro is a new high point in the more than two decades of extraordinary partnership between the City of Lansing, General Motors and the UAW.
Chevy EN-V 2.0 coming to Tianjin Eco-City in China
Fri, Jun 20 2014Chevrolet is bringing its EN-V 2.0 to the Sino-Singapore Tianjin Eco-City in China to show off the "Electric Networked-Vehicle" and demonstrate sustainable urban mobility. The small, two-seat EV concept is an updated version of the original EN-V, a vision of getting around in a future world where space is at a premium and clean air is a priority. So what better place to showcase the evolved EN-V than at the Tianjin Eco-City? The Eco-City is being developed as a planned urban space with eco-consciousness built in. The joint venture between China and Singapore offers an alternative to country living and smog-filled cities. Tianjin Eco-City, slated to be completed by 2020, will be able to offer 350,000 inhabitants clean air and water, renewable energy, green transportation and living spaces and, if all goes as planned, jobs for 50 percent of the residents. Currently, only about three square kilometers of the planned 30 square kilometers have been built, with only about 6,000 permanent residents, but there's still time. The EN-V 2.0, as the "Networked" part of its name suggests, not only features mobile internet, but can communicate with other cars around it. Along with GPS and built-in sensors, this connection between vehicles allows the car to drive autonomously (at least in theory - again, there's still time). This is ideal in an urban environment where congestion can be a major issue. The EN-V 2.0 improves upon the original concept with climate control, storage space and all-weather capability, which also make life more bearable and daily commuting possible. We first saw renderings of the updated vehicle in 2012. The Chevrolet EN-V 2.0 will be used in the Eco-City's National Animation Industry Park and Eco-Business Park of the course of the two-week demonstration. Read on below for more in the press release from GM. GM to Demonstrate Chevrolet EN-V 2.0 in Tianjin Eco-City SHANGHAI – General Motors today announced that it will begin demonstrating the Chevrolet EN-V 2.0 (Electric Networked-Vehicle) in the Sino-Singapore Tianjin Eco-City this week, signaling the company's learning and progress in sustainable urban mobility. The demonstration will help GM further understand consumers' usage of low-speed transportation tools for their daily commute. During the two-week demonstration period, the EN-V 2.0s will be used in the National Animation Industry Park and Eco-Business Park inside the Sino-Singapore Tianjin Eco-City.
Our favorite mid-engine Corvette theories and rumors
Tue, Sep 13 2016The mid-engine Corvette! We just saw blurry photos through the foliage, and are hearts are all aflutter because it means that this car is real. And it's the most " never before" Corvette since 1984. Which leads us to all kinds of wacky theories and speculation. Everybody knows something or heard from a guy. None of those guys (or gals) from GM are talking to Autoblog, to be clear. But that won't stop us from stirring the pot. Let's go over a few point-by-point. The pushrod engine will be replaced by an overhead-cam V8 Car and Driver has repeatedly reported that an overhead-cam engine will come after the mid-engine Corvette's debut with an old-school pushrod. We've heard the same thing firsthand, albeit from a source with no connection to the development of the Corvette or powertrain. "At some point two valves can't pass future emissions regulations," said the guy we know. While the pushrod engine is compact, the design makes it difficult - if not impossible - for sophisticated variable valve timing (and lift) systems that control combustion with more precision. Hasty conclusion: The pushrod engine has a finite life in front of it. This one's a lock, it's a just a matter of when. Bowling Green's new paint shop is really the mid-engine assembly line Credit to Reddit for this one. Like we said, everybody knows a guy. But let's look deeper. The new paint facility costs $439 million dollars and adds 450,000 square feet, almost half the size of the existing plant. Plus GM announced another $290 million in upgrades at Bowling Green Assembly. That sure sounds like a lot of money, but you can actually spend that much on a paint booth. Porsche spent 500 million Euros (about $561 million dollars) to add the Macan assembly to its Leipzig, Germany plant in 2014. Chrysler shelled out $850 million for a paint shop in Sterling Heights, Michigan. GM spent $600 million for a new paint shop at the Fairfax (Kansas City) plant. Honda, on the other hand, is working on a thrifty $210 million project in Marysville, Ohio that includes a 300,000 square foot expansion, and the low-volume Acura NSX facility only cost $70 million. Hasty conclusion: The square footage and cost could easily mean a new assembly line instead of (or in addition to) a paint line. And if the NSX plant was really that cheap, GM could have hidden a similar sum in its existing announcements.























