2014 Chevrolet Impala 1lt on 2040-cars
1202 Washington Ave., Huntington, West Virginia, United States
Engine:2.5L I4 16V GDI DOHC
Transmission:6-Speed Automatic
VIN (Vehicle Identification Number): 1G1115SLXEU113131
Stock Num: C34008
Make: Chevrolet
Model: Impala 1LT
Year: 2014
Exterior Color: Black
Options: Drive Type: FWD
Number of Doors: 4 Doors
Mileage: 2
Don't miss this golden opportunity to become a proud owner of this vehicle. Call and ask for your Internet discount! All prices based on Kelly Blue Book and Nada. Questions? Is the price in Stone? What's the Payment? Call and find out. If you don't buy Dutch, you will pay way too much!
Chevrolet Impala for Sale
Auto Services in West Virginia
Valley Collision Repair Inc ★★★★★
S & M Auto Repair ★★★★★
Ohio Valley Tire ★★★★★
I-77 Ford ★★★★★
Felouzis Auto Repair ★★★★★
Atkins Transmission & Auto ★★★★★
Auto blog
Race Recap: 2013 Twelve Hours of Sebring, cakewalk up front, grindfest out back [w/spoilers]
Tue, 19 Mar 2013This year's 12 Hours of Sebring wasn't exactly a foregone conclusion because we're still talking about racing, and anything can happen when the speeds are as high as the adrenaline and the desire. But we're still talking about Audi bringing it's two top-spec racers - and its huge budget and its nearly neurotic attention to detail - to a race that it uses as a test bed for The 24 Hours of Le Mans and as a way to open the endurance racing season with a victory.
Besides, 12 hours is a long time, especially at Sebring, and things didn't go all Audi's way. On top of that, although it was a pretty quiet race, behind the Audis things got even grimier, with plenty of battles, plenty of mechanical issues, and the new BMW Z4 GTE and Viper GTS-R being race tested. Oh, and that brand new chromed-out DeltaWing...
GM cutting Chevy Sonic, Buick Verano production [UPDATE]
Sun, Jan 25 2015UPDATE: A previous version of this story indicated that Orion Assembly would be idled for seven weeks, from February 16 through April 6. This was incorrect. The factory will instead only be idled for the weeks of February 16 and April 6. The story has been edited to reflect this. General Motors has announced that the factory responsible for the Buick Verano and Chevrolet Sonic will be idled for the weeks of February 16 and April 6, with blame being placed on excess supply. The Orion Assembly plant, about 45 minutes north of GM's Renaissance Center headquarters, employs about 1,800 people, but they'll be given a pair of furloughs as inventories of the sub-compact Sonic and premium compact Verano reach 127 days and 84 days, respectively. That works out to 26,600 Chevys and 9,800 Buicks waiting for buyers. According to Automotive News, the compact Chevy sales bested the industry average in 2014, jumping up nine percent versus the the overall segment's eight-percent gain, while the Buick sedan's sales were down four percent. When asked about the shutdown, a GM spokesman told AN that it will "build to market demand," while also pointing out that the company did not comment on production plans. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Chevrolet GM buick encore orion assembly
GM announces $7 billion Michigan factory investment, most going to EVs
Tue, Jan 25 2022GM announced a $7 billion investment in Michigan manufacturing, much of which is earmarked for EV production. Four sites are included, but the key elements are a new battery cell plant in Lansing and the conversion of GM's existing Orion Township facility to expand production of the forthcoming Chevrolet Silverado EV and its GMC Sierra sibling. GM says it is the largest investment announcement in company history and that it will create 4,000 new jobs. It also says 1,000 jobs will be retained. "We are building on the positive consumer response and reservations for our recent EV launches and debuts, including the GMC Hummer EV, Cadillac Lyriq, Chevrolet Equinox EV and Chevrolet Silverado EV," said GM CEO Mary Barra. GM says the Orion expansion and new battery plant will support an increase in full-size electric truck production capacity to 600,000 units. This is in addition to the Factory ZERO facility in Detroit that will also be constructing the electric Silverado and Sierra. The Orion Township factory current builds the Chevrolet Bolt EV and EUV, and will continue to do so during the plant's conversion. GM did not indicate what will happen with the Bolts once that conversion is complete or whether all will continue to be built at Orion. They do not use the Ultium vehicle architecture. GM will build other EV models at three other factories that are under construction or being converted. They are located in Spring Hill, Tennessee, Ingersoll, Ontario, and Ramos Arizpe, Mexico. GM says that it will have the ability to produce 1 million electric vehicles by 2025. The Ultium Cells Lansing facility is a $2.6 billion joint investment by GM and LG Energy Solution. GM says it alone will create 1,700 jobs once fully operational by late 2024. It will join two other GM Ultium Cells battery factories currently under construction in the United States, one in Ohio and the other in Tennessee. Not all of the $7 billion investment will be for EVs. It also announced $510 million of the total will go toward upgrading the Lansing Delta Township Assembly to produce the next-generation Chevrolet Traverse and Buick Enclave. Money will also go to upgrading Lansing Grand River Assembly.