No Reserve! Only 68k Miles! Clean Carfax! Leather! Runs Great! C4 Sports Cpe Rwd on 2040-cars
Philadelphia, Pennsylvania, United States
Body Type:Hatchback
Vehicle Title:Clear
Engine:5.7L 350Cu. In. V8 GAS OHV Naturally Aspirated
Fuel Type:GAS
For Sale By:Dealer
Number of Cylinders: 8
Make: Chevrolet
Model: Corvette
Trim: Base Hatchback 2-Door
Options: Targa Top, Leather Seats
Drive Type: RWD
Safety Features: Anti-Lock Brakes, Driver Airbag, Passenger Airbag
Mileage: 68,278
Power Options: Power Mirrors, Air Conditioning, Cruise Control, Power Locks, Power Windows, Power Seats
Sub Model: 5.7L V8 Targa Top
Exterior Color: Medium Patriot Red Metallic
Interior Color: Gray
Chevrolet Corvette for Sale
2010 chevy corvette z16 grand sport 3lt auto nav hud 7k texas direct auto(US $44,980.00)
2002 red corvette convertible low mileage
1997 chevrolet corvette base hatchback 2-door 5.7l
2001 chevrolet corvette c5 convertible light oak bose 6 speed manual 17 wheels
2008 chevrolet corvette base coupe 2-door 6.2l jet stream blue(US $35,700.00)
Convertible(US $9,000.00)
Auto Services in Pennsylvania
Young`s Auto Body Inc ★★★★★
World Class Transmission Svc ★★★★★
Wood`s Locksmithing ★★★★★
Trust Auto Sales ★★★★★
Steele`s Truck & Auto Repair ★★★★★
South Hills Lincoln Mercury ★★★★★
Auto blog
GM again delays plant that will build the Silverado EV
Tue, Jul 23 2024 General Motors Co. will again push back the planned opening of an electric pickup truck plant in suburban Detroit and has delayed a Buick plug-in amid uncertain growth in battery-powered car sales. Mary Barra, the company’s chief executive officer, told analysts Tuesday on an earnings conference call the automaker is postponing until mid-2026 the opening of its Orion Assembly factory, which will make the Chevrolet Silverado EV. This is the second delay for the plant, which was originally slated to start production in late 2024. Shares of the automaker fell 4.1% to $47.52 as of 9:39 a.m. in New York. The stock is up about 32% so far this year. The delay is a main reason why GM wonÂ’t be able to meet its previous goal of having production in place to make 1 million EVs by the end of next year. The company said they will add production as buyers show more interest in electric vehicles. “We continue to make sure we continue to scale the business to customers and where they are at,” GM Chief Financial Officer Paul Jacobson said on a call with reporters. GM reported on Tuesday a 60% jump in second quarter profit compared with a year ago, topping Wall StreetÂ’s expectations on strong demand for its traditional gas-powered trucks in the US market.
GM delays 3.0-liter Duramax diesel in Silverado and Sierra pickups
Thu, May 23 2019Stricter testing protocols around the world are making it harder for automakers to predict launch timelines. GM is the latest to get caught in emissions nettles, the Detroit carmaker forced to delay the launch of its new Duramax 3.0-liter inline-six diesel for the Chevrolet Silverado 1500 and GMC Sierra 1500. That's what company reps told dealers in a memo seen by Automotive News this week. Dealers and buyers had been promised the Flint, Mich.-built oil-burner in early 2019, but AN wrote that the EPA certification hiccup has turned into a "slight delay." A GM spokesman told Motor1, "[We] did not attribute [the delay] to a single entity, as the truth is this is a collaborative effort between GM and several government entities. We will make the 2020MY Duramax available for dealers orders soon, and expect to deliver the first trucks to customers soon after emissions testing is complete." We know the new 3.0-liter Duramax diesel has 277 horsepower and 460 pound-feet of torque, outdoing Ford's 3.0-liter PowerStroke diesel by 27 hp and 20 lb-ft. But without final EPA paperwork, GM can't release the numbers that will show how the two engines stack up when considering fuel economy and tow ratings. The certification process has been sticky for a few other makers of late, especially since the Volkswagen Group situation in 2015. BMW had to delay the launch of four diesel models in 2016 over EPA testing. The new Ram 1500 dribbled out in a trickle last year for reasons thought to deal with EPA testing, coming as it did a year after the EPA investigated Ram's EcoDiesel engines in 2017 and 2018. More recently, WLTP testing in Europe caught out just about every automaker over there. Since we're almost halfway through 2019, the delay until the 2020 model year is only a few months. Still, GM told dealers to cancel any orders for the engine for this model year. Dealers will need to resubmit the orders once opening begins, but GM hasn't said when production will begin other than "soon." The company said that it will offer 2020-model-year replacement vehicles to customers and dealers. If prices hold into the next model year, the 2020 Silverado 1500 and Sierra 1500 with the inline-six diesel will come at a $3,890 premium over the 2.7-liter turbo four-cylinder, and a $2,495 premium over the 5.3-liter V8.
GM workers in Oshawa walk out in protest of plant closure
Mon, Nov 26 2018TORONTO/MONTREAL – Canadian Prime Minister Justin Trudeau on Monday expressed his "deep disappointment" in General Motors' decision to close its Oshawa plant, a move Canadian officials only learned about on Sunday and which led workers to walk off the job on Monday. GM said the closure affects a total of 2,973 assembly line jobs. GM's total employment in Canada is 8,150 direct jobs. Workers in the Unifor trade union walked out of the Oshawa plant "in protest," ahead of a meeting with GM about the announcement, a union spokeswoman said. "I've moved my family twice for this company and they do this to me," a tearful worker told CBC TV as he left the plant. Currently, the Oshawa plant builds the Cadillac XTS and Chevy Impala sedans. Under Unifor's four-year contract signed in 2016, GM must give the union a year's notice before closing the plant. The automaker intends to close the plant in December, 2019. A 2015 study commissioned by Unifor, which represents GM employees, estimated that shutting the plant would eliminate 4,100 direct jobs and reduce Ontario's gross domestic product by C$1.1 billion. But Jerry Dias, president of Unifor, said the move amounts to a breach of the automaker's contract with its employees. "We have a collective agreement that says they're not closing any of our facilities ... so we will do anything by any means to make sure that they live up to their word," Dias said at a news conference. Dias said the contract between Unifor and the company forbids GM from closing any of its Canadian plants during the contract period, which ends in September 2020. "They are not closing our damn plant without one hell of a fight." Canadian officials promised to aid auto workers affected by the 2019 closure, part of a wider restructuring by the automaker that will cut production of slow-selling models and slash its North American workforce. "I spoke with GM (CEO) Mary Barra to express my deep disappointment in the closure," Trudeau tweeted on Monday. "We'll do everything we can to help the families affected by this news get back on their feet." GM workers have been part of the heart and soul of Oshawa for generations - and we'll do everything we can to help the families affected by this news get back on their feet. Yesterday, I spoke with @GM's Mary Barra to express my deep disappointment in the closure.





























































